SIGNATURE GLOBAL CITY 92-(II)

by Signature Infrabuild India · Sector 92, Gurugram

Not on our price list yet

Possession 31 Mar 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 92, Gurugram4.8 km from Dwarka Expressway, in a straight line
Carpet area
348–924 sq ft
In m²about 32–86 m², as declared
Registered by
SIGNATURE INFRABUILD PVT. LTD.the company that filed it, for Signature Infrabuild India
Timeline
  1. 28 Jun 2022Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 27 Oct 2022Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Mar 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 29 Mar 2027Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

264homes, 348 to 924 sq ft of carpet area
  • Under 1,000 sq ft348–924 sq ft264

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.494 acres in all, by use
  • Apartment buildings2.494 acres · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenOPEN kitchen
  • LiftsISI marked
  • FloorsVitrified & ceramic tiles
  • WallsOBD
  • BathroomsISI marked
  • WindowsAluminiumn/UPVC
  • Main doorFlush door
  • Electrical fittingsISI marked

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 92, GurugramSector 92, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20254.8 km
  • Delhi–Gurugram–SNB RRTS5.2 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 6 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is SIGNATURE GLOBAL CITY 92-(II) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/666/398/2023/10. Valid to 29 Mar 2027.

The source ↗
What is the possession timeline for SIGNATURE GLOBAL CITY 92-(II)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2025. Its registration runs to 29 Mar 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SIGNATURE GLOBAL CITY 92-(II)?From the records · Map pin and road lines, read 6 Sep 2026

SIGNATURE GLOBAL CITY 92-(II) is in Sector 92, Gurugram; the site address declared to HARERA is Village Mevka, Wazirpur, Sector-92, Gurugram. In a straight line it is about 4.8 km from Dwarka Expressway and 5.2 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SIGNATURE GLOBAL CITY 92-(II)?From the records · HARERA, read 4 Nov 2026

SIGNATURE GLOBAL CITY 92-(II) is a Signature Infrabuild India project, registered by its company SIGNATURE INFRABUILD PVT. LTD..

The source ↗Signature Infrabuild India's projects and court record

The records

What the registers hold for SIGNATURE GLOBAL CITY 92-(II): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/666/398/2023/10: Registered. Valid to 29 Mar 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 12 OF 2021 is on the DTCP register: Licence ends soon; the register prints its validity to 11 Mar 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 28 Jun 2022, building plans 27 Oct 2022.Declared to HARERA, read 29 Oct 2026
The court record of Signature Infrabuild India’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 29 Mar 2027. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 12 OF 2021 ends soon

    Named in this project’s application. Valid to 11 Mar 2027. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 21 HARERA files, with the dates we read them
Registration no.
GGM/666/398/2023/10
Registration valid till
29 Mar 2027
Declared possession
31 Mar 2025

Declared by the promoter to HARERA

Land area
2.4940 (Acre) (10,092.86 sq m)
FAR
2.64 proposed of 2.64 permissible
licence
12 of 2021 dated 12/03/2021
Estimated project cost
₹139.43 crore
Cost of land
₹18.50 crore
Layout plan, declared approved (field 5a)
28 Jun 2022; Part E of the same form gives 12 Mar 2021
Building plans, declared approved
27 Oct 2022
Construction to start
1 Jan 2023
Completion declared for
31 Mar 2025
Declared inventory · 11 types

Declared inventory — 11 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 116 units · 64.6 sq m carpet · 29 towers · one flat
  • Apartment/Shops/Other Buildings · 96 units · 53.56 sq m carpet · 24 towers · one flat
  • Apartment/Shops/Other Buildings · 8 units · 37.07 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 16 units · 42.21 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 4 units · 32.37 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 41.55 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 47.41 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 55.54 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. LICENSE APPROVAL 12 OF 2021 — declared: already been obtained (12 Mar 2021)
  • II. FOREST NOC JFV-QFK-Y5YP & JT8-DAD-BE2T — declared: already been obtained (13 Nov 2020)
  • III. ZONING PLAN APPROVAL DRG. NO. DTCP7738 — declared: already been obtained (20 Apr 2021)
  • IV. LAYOUT PLAN LC-4248 — declared: already been obtained (12 Mar 2021)
  • V. ENVIRONMENT CLEARANCE EC21B038HR158746 — declared: already been obtained (7 Dec 2021)
  • VI. BUILDING PLAN APPROVAL — declared: already been obtained (27 Oct 2022)
  • VII. SERVICE ESTIMATES APPROVAL MEMO NO.4248/JE/(DS)-2022/21082 — declared: already been obtained (20 Jul 2022)
On file with HARERA · 21 files

On file with HARERA (21)

Plans

Site plan

1 file
Approved Site Plan30 Nov 2022

Layout plan

1 file
Latest Layout Plan12 Jan 2023

Zoning plan

1 file
Zoning Plan12 Jan 2023

Demarcation plan

1 file
Demarcation Plan12 Jan 2023

Building plans

2 files
BR-III Commercial12 Jan 2023Approved Building Plans, Full Set12 Jan 2023

Services

Service plans

2 files
Approval of Service Estimate-10.30 Acres12 Jan 2023Service Plans on the Layout30 Nov 2022

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule12 Jan 2023

Environment clearance

1 file
Environment Clearance Approval12 Jan 2023

Fire safety

1 file
Fire Scheme Approval12 Jan 2023

Land records

Land records

2 files
Collaboration Agreement12 Jan 2023Revenue Record Entry of Licence and Collaboration30 Nov 2022

Money

Accounts and finance

3 files
Non-Default Certificate from a CA12 Jan 2023Cash Flow Statement12 Jan 2023CA Certificate on the Application’s Figures30 Nov 2022

The promoter’s papers

Declarations and affidavits

2 files
Promoter Affidavit 92-(II)12 Jan 2023The Promoter’s Declaration on Affidavit30 Nov 2022

HARERA’s orders

HARERA’s orders

1 file
Extension No. 17 of 2025 dated 04.04.20258 Apr 2025

Other filings

Other filings

2 files
PROJECT CONTINUATION- RC/REP/HARERA/GGM/10 of 2023/7(3)/101/2026/06 DATED 26.02.202615 Apr 2026PROJECT CONTINUATION- RC/REP/HARERA/GGM/10 of 2023/7(3)/101/2026/06 DATED 26.02.202615 Apr 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

12 OF 2021 · SIGNATURE INFRABUILD PVT. LTD. · GURGAON-MANESAR

Licence valid to 11 Mar 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 2 Dec 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

12 OF 2021: 16 parcels, 10.3 acres in all, in Meoka (hadbast 121) and Wazirpur (hadbast 115), tehsil Harsaru.

The licence register prints the same licensed area, 10.3 acres.

  • 3//178 kanal 2 marlaMeoka (121)
  • 3//248 kanalMeoka (121)
  • 6//118 kanalMeoka (121)
  • 7//157 kanal 8 marlaMeoka (121)
Show the other 12 parcels
  • 7//3min4 kanal 4 marlaMeoka (121)
  • 7//6min1 kanal 3 marlaMeoka (121)
  • 7//78 kanalMeoka (121)
  • 7//8/14 kanalMeoka (121)
  • 7//8/32 kanalMeoka (121)
  • 89//11/111 marlaWazirpur (115)
  • 89//11/35 kanal 8 marlaWazirpur (115)
  • 89//128 kanalWazirpur (115)
  • 89//197 kanalWazirpur (115)
  • 89//20/22 kanal 1 marlaWazirpur (115)
  • 89//9/22 kanalWazirpur (115)
  • 7//46 kanal 11 marlaMeoka (121)

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village you want: Meoka (hadbast 121) or Wazirpur (hadbast 115), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 3//17.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “Signature Global City 92-II”, by M/s Signature Infra Build Pvt Ltd, code Gurgaon-0825-006468, approved 2025.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan30 Nov 2022

Layout plan

1 file
Latest Layout Plan12 Jan 2023

Building plans

2 files
BR-III Commercial12 Jan 2023Approved Building Plans, Full Set12 Jan 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (21 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2228 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Signature Infrabuild India

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.