Skip to content

Trehan Iris Broadway

by TS Realtech · Sector 85, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 85, Gurugram1.9 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
305–4,549 sq ft
In m²about 28–423 m², as declared
Registered
29 Aug 2017
Registered by
TS REALTECH PRIVATE LIMITEDthe company that filed it, for TS Realtech
Timeline
  1. 29 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
  2. 22 Sep 2017Layout plan approveddeclared to HARERA, read 29 Oct 2026
  3. 13 Feb 2018Building plans approveddeclared to HARERA, read 29 Oct 2026
  4. 31 Dec 2021Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

165homes, 305 to 4,549 sq ft of carpet area
  • Under 1,000 sq ft305–610 sq ft144
  • 2,000–2,500 sq ft2,132 sq ft18
  • 3,000 sq ft and above4,549 sq ft3

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 77 rows of a single unit and 15 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside11,331 m² in all, by use
  • Other uses6,733 m² · 59%
  • Apartment buildings4,598 m² · 41%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 85, GurugramSector 85, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.9 km
  • Delhi–Gurugram–SNB RRTS2.5 km
  • Sohna Elevated Corridor (NH-248A)8.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Trehan Iris Broadway registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 168 OF 2017, registered on 29 Aug 2017. Ended 31 Dec 2021. The register shows it as: Registration expired.

The source ↗
How is the connectivity around Trehan Iris Broadway?From the records · Map pin and road lines, read 6 Sep 2026

Trehan Iris Broadway is in Sector 85, Gurugram; the site address declared to HARERA is Sector 85,86. In a straight line it is about 1.9 km from Dwarka Expressway, 2.5 km from Delhi–Gurugram–SNB RRTS and 8.7 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Trehan Iris Broadway?From the records · HARERA, read 4 Nov 2026

Trehan Iris Broadway is a TS Realtech project, registered by its company TS REALTECH PRIVATE LIMITED.

The source ↗TS Realtech's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Trehan Iris Broadway: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 168 OF 2017: Registration expired. Ended 31 Dec 2021.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 40 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 21 Apr 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 22 Sep 2017, building plans 13 Feb 2018.Declared to HARERA, read 29 Oct 2026
The court record of TS Realtech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Dec 2021. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 40 OF 2012 lapsed

    Named in this project’s application. Valid to 21 Apr 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 9 HARERA files, with the dates we read them
Registration no.
168 OF 2017
Registration date
29 Aug 2017
Registration valid till
31 Dec 2021

Declared by the promoter to HARERA

Land area
2.8 (Acre) (11,331.2 sq m)
FAR
the application prints 175, which is not a ratio
licence
40 of 2012
Estimated project cost
₹129.24 crore
Cost of land
₹8.19 crore
Layout plan, declared approved (field 5a)
22 Sept 2017
Building plans, declared approved
13 Feb 2018
Declared inventory · 136 types

Declared inventory — 136 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type A116 · 1 unit · 47.96 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type A117 · 1 unit · 49.73 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type A118 · 1 unit · 49.84 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type A119 · 1 unit · 49.85 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type A120 · 1 unit · 55.12 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type A121 · 1 unit · 55.59 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type A122 · 1 unit · 56.11 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type A123 · 2 units · 56.18 sq m carpet · one flat
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. OCCUPATION CERTIFICATE FOR TOWER ONE — declared: already been obtained (29 Mar 2019)
On file with HARERA · 9 files

On file with HARERA (9)

Plans

Site plan

1 file
Approved Site Plan30 Nov 2019

Layout plan

1 file
Latest Layout Plan30 Nov 2019

Zoning plan

1 file
Zoning Plan30 Nov 2019

Building plans

1 file
Approved Building Plans, Full Set23 Nov 2019

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate28 Jul 2023

DTCP licence

1 file
Licence Copy with Land Schedule30 Nov 2019

Money

Accounts and finance

2 files
CA Certificate on the Application’s Figures30 Nov 2019Non-Default Certificate from a CA30 Nov 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit30 Nov 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

40 OF 2012 · TS Realtech · GURGAON-MANESAR

Licence valid to 21 Apr 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 30 Nov 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

40 OF 2012: 8 parcels, 2.8 acres in all, in Badha (hadbast 113), tehsil Manesar.

The licence register prints the same licensed area, 2.8 acres.

  • 31//18/12 kanal 18 marla
  • 31//22/13 kanal 6 marla
  • rectangle 31, kila 13/2/2/2/21 kanal 12 marla
  • rectangle 31, kila 3/2/21 kanal
Show the other 4 parcels
  • rectangle 31, kila 3/2/31 kanal
  • rectangle 31, kila 72 kanal 6 marla
  • rectangle 31, kila 8/17 kanal 17 marla
  • rectangle 31, kila 13/1/1/22 kanal 9 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badha (hadbast 113), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 31//18/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹1,58,400 per sq yd

Sector 85, collector rates effective 1 Apr 2026, Manesar tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan30 Nov 2019

Layout plan

1 file
Latest Layout Plan30 Nov 2019

Building plans

1 file
Approved Building Plans, Full Set23 Nov 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (9 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/944 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on TS Realtech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.