Skip to content
New launch

Tulip Melrose

by Tulip Infratech · Sector 70, Gurugram

₹16,000 a sq ftof carpet area

Bhumiq team price list, 16 Sep 2026: an asking rate, not a registry figure.

Possession 31 Dec 2033 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 70, Gurugram2.3 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Carpet area
1,919–1,966 sq ft
In m²about 178–183 m², as declared
Asking rate
₹16,000 a sq ft of carpet
Bhumiq team price list, 16 Sep 2026
Registered by
PREMIUM INFRATECH LLPthe company that filed it, for Tulip Infratech
Timeline
  1. 1 Oct 2025Layout and building plans approveddeclared to HARERA, read 15 Oct 2026
  2. 31 Dec 2033Possession, as declareddeclared to HARERA, read 15 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

152homes, 1,919 to 1,966 sq ft of carpet area
  • 1,500–2,000 sq ft1,919–1,966 sq ft152

Carpet area per home, as declared to HARERA (read 15 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside7.5 acres in all, by use
  • Roads2.883 acres · 38%
  • Parks and playgrounds2.223 acres · 30%
  • Apartment buildings1.354 acres · 18%
  • Other usesas the form names them: Conv shopping, Underground water tank0.323 acres · 4%
  • Sewage and waste treatment0.208 acres · 3%
  • Parking0.185 acres · 2%
  • Nursery school0.159 acres · 2%
  • Land for community services, handed to the government0.108 acres · 1%
  • Electricity sub-station0.057 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 15 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenMarble/granite counter with stainless steelsink, cpfittings and modular kitchen.
  • LiftsCapacity of 10 / 13 persons, KONE orequivalent
  • Floors) living/dining: tiles /imported marble II)master bedroom/dress room and bedroom :laminated woodenflooring III) kitchen: antiskid tiles / equivalent IV) alltoilets: premiumquality tiles. V) SIT OUTS/balcony: antiskidceramic tiles VI) utility room: vitrified tilesvii)utility toilet & balcony: anti skid ceramicfloor tiles.
  • Walls) living/dining, master bedroom, bedrooms:acrylicemulsion paint finish II) mastertoilet/dress room,toilets: premium qualitytiles/mirror III) kitchen: 2’-0”DADO abovecounters and acrylic emulsion paint.IV)utility rooms/ utility balcony/utilitytoilet: oil boundpaint finish V) sitouts/balcony: permanenttexture/paintfinish.
  • BathroomsI) master toilet/dress room: sanitary wareincludeswash basin and EWC CP fittings: hotand cold waterwall and basin mixture ofpremium brands, handshower, healthfauset& angle valve.
  • WindowsNergy efficient double glass aluminium/upvcglazings with FLY MESH shutter in allhabitableareas & aluminium / UPVC frameswith single glass inall toilets & utilityrooms.
  • Main doorMoulded SKIN door / panel door shutters.
  • Electrical fittingsSwitches only (no lights & fixtures)

The developer’s specifications in the HARERA application, declared to HARERA, read 15 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 70, GurugramSector 70, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)2.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.3 km
  • Delhi–Gurugram–SNB RRTS3.4 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 9 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 4
  • Other register states: 3

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Tulip Melrose registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1007/739/2025/110. Valid to 31 Dec 2033.

The source ↗
What is the possession timeline for Tulip Melrose?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2033. Its registration runs to 31 Dec 2033; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Tulip Melrose?From the records · Map pin and road lines, read 6 Sep 2026

Tulip Melrose is in Sector 70, Gurugram; the site address declared to HARERA is Sector 70. In a straight line it is about 2.3 km from Sohna Elevated Corridor (NH-248A), 3.3 km from Dwarka Expressway and 3.4 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What does a home in Tulip Melrose cost, and how does that compare nearby?From the records · Bhumiq team price list, 16 Sep 2026

The Bhumiq team's price list has ₹16,000 a sq ft of carpet area (16 Sep 2026). Prices change; ask the developer for its current price list.

What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty

The records

What the registers hold for Tulip Melrose: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1007/739/2025/110: Registered. Valid to 31 Dec 2033.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 156 OF 2024 is on the DTCP register, valid to 16 Nov 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 1 Oct 2025, building plans 1 Oct 2025.Declared to HARERA, read 15 Oct 2026
The court record of Tulip Infratech’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 46 HARERA files, with the dates we read them
Registration no.
GGM/1007/739/2025/110
Registration valid till
31 Dec 2033
Declared possession
31 Dec 2033
Asking price (indicative)
₹16,000 / sq ft of carpet area

Bhumiq team price list · as of 16 Sept 2026 · a quoted rate, not a registry figure

Declared by the promoter to HARERA

Land area
7.5 (Acre) (30,351.42 sq m)
FAR
the application prints 400, which is not a ratio
licence
License No 156 of 2024 dated 17-11-2024 valid upto 16-11-2029
Estimated project cost
₹1110.06 crore
Cost of land
₹68.47 crore
Layout plan, declared approved (field 5a)
1 Oct 2025
Building plans, declared approved
1 Oct 2025
Construction to start
1 Jan 2026
Completion declared for
31 Dec 2033
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 146 units · 178.29 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 6 units · 182.61 sq m carpet · 4 towers · one flat
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENSE NO. 156 OF 2024 — declared: already been obtained (17 Nov 2024)
  • II. BUILDING PLAN APPROVAL ZP-2173/PA(DK)/2025/38338 — declared: already been obtained (1 Oct 2025)
  • III. ENVIRONMENT CLEARANCE FILE NO.SEAC/HR/2024/271 — declared: already been obtained (20 Feb 2025)
On file with HARERA · 46 files

On file with HARERA (46)

Plans

Site plan

1 file
Approved Site Plan6 Oct 2025

Layout plan

1 file
Latest Layout Plan6 Oct 2025

Zoning plan

1 file
Zoning Plan18 Nov 2025

Demarcation plan

1 file
Demarcation Plan18 Nov 2025

Building plans

16 files
Building Plan-S-0318 Nov 2025Building Plan-S-0418 Nov 2025Building Plan-S-0718 Nov 2025

Services

Service plans

1 file
Service Plan Approval Receiving18 Nov 2025

Approvals and clearances

DTCP licence

7 files
Licence Copy with Land Schedule18 Nov 2025Aravali TOD 218 Nov 2025NOC from Divisional Forest Officer, Gurugram (TOD-2)18 Nov 2025

Other NOCs and clearances

1 file
Airport NOC18 Nov 2025

Land records

Land records

4 files
Jamabandi Mutation and Rapat 01-10-202518 Nov 2025Non Encumbrace Certificate TOD -2 Dated 01-10-202518 Nov 2025Sizra Dated 01-10-202518 Nov 2025Revenue Record Entry of Licence and Collaboration6 Oct 2025

Sales papers

Allotment and sale agreements

3 files
Allotment Letter18 Nov 2025BBA18 Nov 2025Conveyance Deed18 Nov 2025

Money

Accounts and finance

7 files
CA Certificate for Cost Incurred18 Nov 2025CA Certificate for Finiancial Resources18 Nov 2025Signed Project Report18 Nov 2025

Timeline and progress

Progress and photographs

1 file
Statement of Quarterly Sources18 Nov 2025

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit6 Oct 2025

Other filings

Other filings

1 file
Appliction Form18 Nov 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

156 OF 2024 · PREMIUM INFRATECH LLP · GURGAON-MANESAR

Licence valid to 16 Nov 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 6 Oct 2025 · read 15 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

156 OF 2024: 15 parcels, 7.5 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 7.5 acres.

  • 57//168 kanal
  • 57//17/2/14 kanal
  • 57//236 kanal
  • 57//24/11 kanal 9 marla
Show the other 11 parcels
  • 57//24/2/11 kanal 13 marla
  • 57//24/2/22 kanal 18 marla
  • 57//25/12 kanal 19 marla
  • 57//25/23 kanal 1 marla
  • 58//19/2/14 kanal 9 marla
  • 58//19/2/22 kanal 9 marla
  • 58//208 kanal
  • 58//21/11 kanal 1 marla
  • 58//21/2/14 kanal 1 marla
  • 58//22/12 kanal
  • 82//48 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 57//16.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,950 per sq ft

Sector 70, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan6 Oct 2025

Layout plan

1 file
Latest Layout Plan6 Oct 2025

Building plans

16 files
Building Plan-S-0318 Nov 2025Building Plan-S-0418 Nov 2025Building Plan-S-0718 Nov 2025Building Plan-S-1018 Nov 2025Building Plan-S-1618 Nov 2025Building Plan-S-1318 Nov 2025

Among the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (46 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3749 · read 15 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Tulip Infratech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

₹16,000/sq ftBook a site visitAsk

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.