Skip to content

VEDATAM

by Spj Properties · Sector 14, Gurugram

Not on our price list yet

Possession 30 Jun 2030 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 14, Gurugram0.6 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
270–861 sq ft
In m²about 25–80 m², as declared
Registered by
SPJ PROPERTIES PRIVATE LIMITEDthe company that filed it, for Spj Properties
Timeline
  1. 13 Dec 2024Layout and building plans approveddeclared to HARERA, read 8 Oct 2026
  2. 30 Jun 2030Possession, as declareddeclared to HARERA, read 8 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

224homes, 270 to 861 sq ft of carpet area
  • Under 1,000 sq ft270–861 sq ft224

Carpet area per home, as declared to HARERA (read 8 Oct 2026), in sq ft. Left out: 105 rows of a single unit and 49 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside4.156 acres in all, by use
  • Roads1.852 acres · 45%
  • Apartment buildings1.678 acres · 40%
  • Green belts0.627 acres · 15%

The land-use table of the HARERA application, declared to HARERA, read 8 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningCentralized
  • Lifts9 lift including FIRE lift
  • WallsOil bound/washable distemper
  • Electrical fittingsConcealed PVC conduit, copper wiring, G.I boxes & modular switches, distribution box
  • Water storageProvided

The developer’s specifications in the HARERA application, declared to HARERA, read 8 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 14, GurugramSector 14, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS0.6 km
  • Sohna Elevated Corridor (NH-248A)3.5 km
  • Dwarka ExpresswayOpen, 17 Aug 20254.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1
  • Other register states: 1

Other projects nearby

4 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is VEDATAM registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/927/659/2025/30. Valid to 30 Jun 2030.

The source ↗
What is the possession timeline for VEDATAM?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2030. Its registration runs to 30 Jun 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around VEDATAM?From the records · Map pin and road lines, read 6 Sep 2026

VEDATAM is in Sector 14, Gurugram; the site address declared to HARERA is Revenue Estate Of Village Gurugram, Sector-14, Gurugram, Haryana. In a straight line it is about 0.6 km from Delhi–Gurugram–SNB RRTS, 3.5 km from Sohna Elevated Corridor (NH-248A) and 4.9 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building VEDATAM?From the records · HARERA, read 4 Nov 2026

VEDATAM is a Spj Properties project, registered by its company SPJ PROPERTIES PRIVATE LIMITED.

The source ↗Spj Properties's projects and court record

The records

What the registers hold for VEDATAM: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/927/659/2025/30: Registered. Valid to 30 Jun 2030.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 101 OF 2024 is on the DTCP register, valid to 28 Jul 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 13 Dec 2024, building plans 13 Dec 2024.Declared to HARERA, read 8 Oct 2026
The court record of Spj Properties’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 39 HARERA files, with the dates we read them
Registration no.
GGM/927/659/2025/30
Registration valid till
30 Jun 2030
Declared possession
30 Jun 2030

Declared by the promoter to HARERA

Land area
4.15625 (Acre) (16,819.75 sq m)
FAR
the application prints 172.55, which is not a ratio
licence
License No. 101 of 2024 Dated 29th July 2024
Estimated project cost
₹400.54 crore
Cost of land
₹70.39 crore
Layout plan, declared approved (field 5a)
13 Dec 2024
Building plans, declared approved
13 Dec 2024
Construction to start
1 Jan 2025
Completion declared for
30 Jun 2030
Declared inventory · 206 types

Declared inventory — 206 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 2 units · 25.59 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 1 unit · 25.6 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 5 units · 25.9 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 8 units · 26.22 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 2 units · 42.209 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 1 unit · 68.189 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 1 unit · 69.3 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 1 unit · 69.95 sq m carpet · 1 tower
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (29 Jul 2024)
  • II. SITE PLAN — declared: already been obtained (13 Dec 2024)
  • III. BUILDING PLAN APPROVAL — declared: already been obtained (13 Dec 2024)
  • IV. ZONING PLAN — declared: already been obtained (30 Jul 2024)
  • V. LOI — declared: already been obtained (13 Mar 2024)
  • VI. ENVIRONMENT CLEARANCE — declared: already been obtained (24 Jan 2025)
On file with HARERA · 39 files

On file with HARERA (39)

Plans

Site plan

1 file
Approved Site Plan11 Mar 2025

Layout plan

2 files
Superimposed Demarcation Plan on Approved Layout Plan11 Mar 2025Latest Layout Plan22 Dec 2024

Zoning plan

1 file
Zoning Plan11 Mar 2025

Demarcation plan

1 file
Demarcation Plan11 Mar 2025

Building plans

3 files
Approved Building Plans, Full Set11 Mar 2025Elevation and Section11 Mar 2025BR-III11 Mar 2025

Floor plans

1 file
Basement Plans of Parking11 Mar 2025

Services

Electricity

1 file
Power Assurance11 Mar 2025

Service plans

1 file
All Assurances11 Mar 2025

Approvals and clearances

DTCP licence

3 files
LOI11 Mar 2025Licence Copy with Land Schedule11 Mar 2025LC-IV11 Mar 2025

Other NOCs and clearances

3 files
AAI NOC11 Mar 2025Enviroment Clearance11 Mar 2025Forest NOC11 Mar 2025

Land records

Land records

7 files
Revenue Record Entry of Licence and Collaboration11 Mar 2025Mutation11 Mar 2025Land Title Search Report11 Mar 2025

Sales papers

Allotment and sale agreements

1 file
Builder Buyer Agreement11 Mar 2025

Money

Accounts and finance

9 files
Non-Default Certificate from a CA11 Mar 2025CA Certificate for Cost Incurred Up to the Date of Extention of Registration11 Mar 2025DTCP Service Plan Approval & BG Deposit11 Mar 2025

Timeline and progress

Construction schedule

1 file
PERT Chart11 Mar 2025

The promoter’s papers

Declarations and affidavits

4 files
Affidavit of Promoter - Arrangement of Master RERA Account 42LD11 Mar 2025Affidavit11 Mar 2025The Promoter’s Declaration on Affidavit11 Mar 2025Bank Undertaking11 Mar 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

101 OF 2024 · SPJ Properties Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 28 Jul 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 22 Dec 2024 · read 8 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

101 OF 2024: 3 parcels, 4.1563 acres in all, in Gurgaon (hadbast 55), tehsil Gurugram.

The licence register prints the same licensed area, 4.1563 acres.

  • rectangle 4234, kila 4234/17472 bigha 17 biswa
  • rectangle 4235, kila 4235/17473 bigha 7 biswa
  • rectangle 5416, kila 5416/4228/17419 biswa

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Gurgaon (hadbast 55), tehsil Gurugram. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 4234, kila 4234/1747.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan11 Mar 2025

Layout plan

2 files
Superimposed Demarcation Plan on Approved Layout Plan11 Mar 2025Latest Layout Plan22 Dec 2024

Building plans

3 files
Approved Building Plans, Full Set11 Mar 2025Elevation and Section11 Mar 2025BR-III11 Mar 2025

Floor plans

1 file
Basement Plans of Parking11 Mar 2025

Among the uploads Bhumiq read from HARERA's page on 8 Oct 2026 (39 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3251 · read 8 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Spj Properties

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.