by Vatika One On One · Sector 16, Gurugram

Not on our price list yet

Possession 19 Sep 2022 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 16, Gurugram0.5 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
about 336 sq ft
In m²about 31.2 m², the average flat, as declared
Land
49093.349 (Sqr/mtrs)
Registered
20 Sep 2017
Registered by
VATIKA ONE ON ONE PRIVATE LIMITED (FORMERLY KNOWN AS CALDER DEVELOPERS PVT. LTD.)the company that filed it, for Vatika One On One
Timeline
  1. 18 May 2017Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 20 Sep 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 19 Sep 2022Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside49,093 m² in all, by use
  • Other uses34,235 m² · 70%
  • Apartment buildings9,417 m² · 19%
  • Parking5,181 m² · 11%
  • Electricity sub-station260 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningOffice space shall be AIR-conditioned through highly energy efficient central a.C. system with BMS
  • LiftsPassenger elevators designed to cater for the expected traffic with high quality finishes. dedicated service lift for movement of goods and materials one per block
  • FloorsCombination of materials SUCH as stone, high quality tiles in common areas
  • WallsCombination of tiles & paint in common areas.
  • BathroomsSanitary WARE of standard make and brands for common toilets.
  • WindowsGlazed aluminum windows and fenestration along with curtain glass in locations
  • Electrical fittingsIs compliant provisioning for critical lighting in areas of circulation and emergency usage
  • Water storageOHT & UG tanks

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 16, GurugramSector 16, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS0.5 km
  • Sohna Elevated Corridor (NH-248A)3.1 km
  • Dwarka ExpresswayOpen, 17 Aug 20255.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1

Other projects nearby

7 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is One On One registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 237 OF 2017, registered on 20 Sep 2017. Ended 19 Sep 2022. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for One On One?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 19 Sep 2022. Its registration runs to 19 Sep 2022; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around One On One?From the records · Map pin and road lines, read 6 Sep 2026

One On One is in Sector 16, Gurugram; the site address declared to HARERA is Sector-16, Village Silokhera. In a straight line it is about 0.5 km from Delhi–Gurugram–SNB RRTS, 3.1 km from Sohna Elevated Corridor (NH-248A) and 5.5 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building One On One?From the records · HARERA, read 4 Nov 2026

One On One is a Vatika One On One project, registered by its company VATIKA ONE ON ONE PRIVATE LIMITED (FORMERLY KNOWN AS CALDER DEVELOPERS PVT. LTD.).

The source ↗Vatika One On One's projects and court record

The records

What the registers hold for One On One: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 237 OF 2017: Registration expired. Ended 19 Sep 2022.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 5 OF 2015 is on the DTCP register: Licence lapsed; the register prints its validity to 5 Aug 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 18 May 2017, building plans 18 May 2017.Declared to HARERA, read 29 Oct 2026
The court record of Vatika One On One’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 19 Sep 2022. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 5 OF 2015 lapsed

    Named in this project’s application. Valid to 5 Aug 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 90 HARERA files, with the dates we read them
Registration no.
237 OF 2017
Registration date
20 Sept 2017
Registration valid till
19 Sept 2022
Declared possession
19 Sept 2022

Declared by the promoter to HARERA

Land area
49093.349 (Sqr/mtrs)
FAR
the application prints 86.47, which is not a ratio
licence
License No. 5 of 2015 dated 06.08.2015
Estimated project cost
₹633.42 crore
Cost of land
₹152.00 crore
Layout plan, declared approved (field 5a)
18 May 2017
Building plans, declared approved
18 May 2017
Completion declared for
19 Sept 2022
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type ANNEX-20 (DETAILS OF UNITS) · 1,098 units · 34,285.82 sq m carpet · total for 1,098 flats, about 31.2 m² each
Statutory approvals, as declared · 9

Statutory approvals, as declared

  • I. LAY OUT PLAN — declared: already been obtained (18 May 2017)
  • II. ZONING PLAN — declared: already been obtained (7 Aug 2015)
  • III. BUILDING PLAN — declared: already been obtained (18 May 2017)
  • IV. SITE PLAN — declared: already been obtained (18 May 2017)
  • V. FLOOR PLAN — declared: already been obtained (18 May 2017)
  • VI. APARTMENT PLANS — declared: already been obtained (18 May 2017)
  • VII. ELEVATION SECTION — declared: already been obtained (18 May 2017)
  • VIII. DETAIL OF PERMISSIBLE FAR — declared: already been obtained (18 May 2017)
  • IX. DETAIL OF COVERED AREA ACHIEVED FAR. — declared: already been obtained (18 May 2017)
On file with HARERA · 90 files

On file with HARERA (90)

Plans

Site plan

4 files
Location Plan11 Jan 2020Sectorial Map11 Jan 2020Site Plan11 Jan 2020Approved Site Plan21 Dec 2019

Layout plan

1 file
Latest Layout Plan21 Dec 2019

Zoning plan

2 files
Zoning Plan11 Jan 2020Zoning Plan21 Dec 2019

Building plans

11 files
Block 3 Elevation Abcd13 Jan 2020Block 2 Terrace and Lmr Floor Plan13 Jan 2020Block 5 Elevation Abcd13 Jan 2020

Floor plans

23 files
Details of Units with Construction Stages20 Feb 2020Basement 1 Floor Plan Area Calculation13 Jan 2020Enargy Center 2nd Mazzenine Floor Plans13 Jan 2020

Services

Service plans

2 files
Block 4 6th 7th Service Floor Plans13 Jan 2020Service Plan11 Jan 2020

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate28 Jul 2023

DTCP licence

4 files
LC-IV and Bilateral Agreement12 Feb 2020LOI - 12.13125 Acres12 Feb 2020Licence Copy with Land Schedule12 Feb 2020License No 05 of 201511 Jan 2020

Environment clearance

1 file
Environment Clearance12 Feb 2020

Fire safety

1 file
Fire Fighting Scheme12 Feb 2020

Other NOCs and clearances

2 files
Forest NOC12 Feb 2020Airport Height Clearance NOC12 Feb 2020

Land records

Land records

3 files
Aks Shejra with Land Details11 Jan 20209 Revenue Records Sale Deed Etc11 Jan 2020Encumbrances11 Jan 2020

Sales papers

Allotment and sale agreements

5 files
Agreement for Sale11 Jan 2020AFS Commercial Final11 Jan 2020Time Period Commited to Allottee11 Jan 2020

Brochure and specifications

1 file
Advertisement11 Jan 2020

Money

Accounts and finance

9 files
Details of Separate Bank Account11 Mar 2020CA Certificate on the Application’s Figures12 Feb 2020Cash Flow Statement12 Feb 2020

Timeline and progress

Construction schedule

1 file
Development Work Plan11 Jan 2020

The promoter’s papers

Declarations and affidavits

4 files
The Promoter’s Declaration on Affidavit12 Feb 2020Rep I (Old)11 Jan 2020Booking Application Form11 Jan 2020Rep II11 Jan 2020

Company papers

5 files
Detail of Authorised Signatory12 Feb 2020Shareholders11 Jan 2020MOA and AOA11 Jan 2020

HARERA’s orders

HARERA’s orders

1 file
2 Registration Certificate11 Jan 2020

Other filings

Other filings

9 files
Block 4 Ele 1 and 313 Jan 2020Enargy Center13 Jan 2020Block 4 Ele 2 and 4 Sec A and B13 Jan 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

5 OF 2015 · Vatika One-on-One Pvt. Ltd. (Earlier known as Calder Developers Pvt. Ltd.) · GURGAON-MANESAR

Licence valid to 5 Aug 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 13 Jan 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

5 OF 2015: 17 parcels, 12.1312 acres in all, in Salokhera (hadbast 72), tehsil Wazirabad.

The licence register prints the same licensed area, 12.13 acres.

  • 7//21/2/11 marla
  • 11//102 kanal 5 marla
  • 11//4/24 kanal
  • 11//58 kanal
Show the other 13 parcels
  • 11//7/14 kanal
  • 11//3/23 kanal 12 marla
  • 11//4/14 kanal
  • 11//6/14 kanal 4 marla
  • 11//1/22 kanal 16 marla
  • 8//148 kanal
  • 8//158 kanal
  • 8//168 kanal
  • 8//178 kanal
  • 8//248 kanal
  • 8//258 kanal
  • 8//67 kanal 7 marla
  • 8//78 kanal 16 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Salokhera (hadbast 72), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 7//21/2/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,74,600 per sq yd

this sector, collector rates effective 1 Apr 2026, Gurugram tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

4 files
Location Plan11 Jan 2020Sectorial Map11 Jan 2020Site Plan11 Jan 2020Approved Site Plan21 Dec 2019

Layout plan

1 file
Latest Layout Plan21 Dec 2019

Building plans

11 files
Block 3 Elevation Abcd13 Jan 2020Block 2 Terrace and Lmr Floor Plan13 Jan 2020Block 5 Elevation Abcd13 Jan 2020Block 5 Terrace and Lmr Floor Plan13 Jan 2020Block 3 Terrace and Lmr Floor Plan13 Jan 2020Block 4 Terrace and Lmr Floor Plan13 Jan 2020

Floor plans

23 files
Details of Units with Construction Stages20 Feb 2020Basement 1 Floor Plan Area Calculation13 Jan 2020Enargy Center 2nd Mazzenine Floor Plans13 Jan 2020Block 3 2nd 3rd 4th Floor Plans13 Jan 2020Block 5 5th 6th Floor Plans13 Jan 2020Block 5 Area Calculation Al Floor Plan13 Jan 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (90 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1097 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Vatika One On One

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.