WAL SERENIA 92 ( VERDE 92 )

by Wal Developments · Sector 92, Gurugram

Not on our price list yet

Possession 31 Mar 2029 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 92, Gurugram4.8 km from Dwarka Expressway, in a straight line
Carpet area
about 574 sq ft
In m²about 53.4 m², the average flat, as declared
Registered by
WAL DEVELOPMENTS PRIVATE LIMITEDthe company that filed it, for Wal Developments
Timeline
  1. 23 Jan 2025Layout and building plans approveddeclared to HARERA, read 8 Oct 2026
  2. 31 Mar 2029Possession, as declareddeclared to HARERA, read 8 Oct 2026
  3. 9 Jul 2029Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside18,514 m² in all, by use
  • Apartment buildings5,794 m² · 31%
  • Roads4,224 m² · 23%
  • Parking3,188 m² · 17%
  • Shops and offices2,340 m² · 13%
  • Green belts886 m² · 5%
  • Other usesas the form names them: Meter room parking access basement ramp865 m² · 5%
  • Parks and playgrounds650 m² · 4%
  • Sewage and waste treatment450 m² · 2%
  • Electricity sub-station117 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 8 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenStone counter - top with 2 FEET tiles above the counter. the floors are finished with tiles
  • Lifts13 lifts, in which 07 are passangers and remaining 06 are stretchers lift
  • FloorsTiles-600X600 MM vitrfied and 300X300 ceramic
  • WallsExternal walls-APEX/weather exterior texture emulsion paint and internal walls-whitewash/colour WASH
  • BathroomsCP fittings and fixtures ISI marked
  • WindowsMS/ aluminium windows with glass 4/5/6 MM
  • Main doorMS/ PVC door frame & flush door shutters are finished with enamel paint
  • Electrical fittingsISI marked fittings

The developer’s specifications in the HARERA application, declared to HARERA, read 8 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 92, GurugramSector 92, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20254.8 km
  • Delhi–Gurugram–SNB RRTS5.2 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is WAL SERENIA 92 ( VERDE 92 ) registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as RC NO. GGM/938/670/2025/41 IS HEREBY SUPERSEDED BY RC NO. GM/938/670/2025/41/SS(1)/1. Valid to 9 Jul 2029.

The source ↗
What is the possession timeline for WAL SERENIA 92 ( VERDE 92 )?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2029. Its registration runs to 9 Jul 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around WAL SERENIA 92 ( VERDE 92 )?From the records · Map pin and road lines, read 6 Sep 2026

WAL SERENIA 92 ( VERDE 92 ) is in Sector 92, Gurugram; the site address declared to HARERA is Village Dhorka, Sector-92, Gurugram. In a straight line it is about 4.8 km from Dwarka Expressway and 5.2 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building WAL SERENIA 92 ( VERDE 92 )?From the records · HARERA, read 3 Nov 2026

WAL SERENIA 92 ( VERDE 92 ) is a Wal Developments project, registered by its company WAL DEVELOPMENTS PRIVATE LIMITED.

The source ↗Wal Developments's projects and court record

The records

What the registers hold for WAL SERENIA 92 ( VERDE 92 ): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration RC NO. GGM/938/670/2025/41 IS HEREBY SUPERSEDED BY RC NO. GM/938/670/2025/41/SS(1)/1: Registered. Valid to 9 Jul 2029.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 77 OF 2024 is on the DTCP register, valid to 9 Jul 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 23 Jan 2025, building plans 23 Jan 2025.Declared to HARERA, read 8 Oct 2026
The court record of Wal Developments’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 36 HARERA files, with the dates we read them
Registration no.
RC NO. GGM/938/670/2025/41 IS HEREBY SUPERSEDED BY RC NO. GM/938/670/2025/41/SS(1)/1
Registration valid till
9 Jul 2029
Declared possession
31 Mar 2029

Declared by the promoter to HARERA

Land area
4.575 (Acre) (18,514.37 sq m)
FAR
2.4 proposed of 2.4 permissible
licence
77 OF 2024 DATED 10/07/2024
Estimated project cost
₹264.94 crore
Cost of land
₹91.69 crore
Layout plan, declared approved (field 5a)
23 Jan 2025
Building plans, declared approved
23 Jan 2025
Construction to start
1 Apr 2025
Completion declared for
31 Mar 2029
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 632 units · 36,692.7 sq m carpet · 6 towers · total for 632 flats, about 58.1 m² each
  • Apartment/Shops/Other Buildings · 105 units · 2,631.11 sq m carpet · 1 tower · total for 105 flats, about 25.1 m² each
Statutory approvals, as declared · 16

Statutory approvals, as declared

  • I. LICENCE — declared: already been obtained (10 Jul 2024)
  • II. BUILDING PLAN — declared: already been obtained (23 Jan 2025)
  • III. DEMARCATION CUM ZONING PLAN — declared: already been obtained (17 Jan 2025)
  • IV. ENVIORNMENT CLEARANCE — declared: already been obtained (24 Jan 2025)
  • V. AIRPORTS AUTHORITY OF INDIA NOC — declared: already been obtained (26 Sept 2024)
  • VI. ARAVALI NOC — declared: already been obtained (19 Sept 2024)
  • VII. FOREST NOC — declared: already been obtained (9 Feb 2024)
  • VIII. FRESH WATER SUPPLY ASSURANCE — declared: already been obtained (30 Jul 2024)
  • IX. SEWARAGE CONNECTION ASSURANCE — declared: already been obtained (30 Jul 2024)
  • X. STORM WATER ASSURANCE — declared: already been obtained (30 Jul 2024)
  • XI. STP TREATED WATER ASSURANCE — declared: already been obtained (30 Jul 2024)
  • XII. NOC TREATED WASTE WATER FOR CONNECTION ASSURANCE — declared: already been obtained (26 Nov 2024)
  • XIII. POWER ASSURANCE — declared: already been obtained (23 Jul 2024)
  • XIV. FIRE FIGHTING SCHEME — declared: applied for but yet to receive (6 Feb 2025)
  • XV. MINING NOC — declared: yet to file for approval (17 Feb 2025)
  • XVI. CTE — declared: yet to file for approval (17 Feb 2025)
On file with HARERA · 36 files

On file with HARERA (36)

Plans

Site plan

2 files
Site Plan2 Apr 2025Approved Site Plan28 Jan 2025

Layout plan

1 file
Latest Layout Plan28 Jan 2025

Zoning plan

2 files
Revised Demarcation Cum Zoning Plan2 Apr 2025Zoning Plan30 Jan 2025

Demarcation plan

1 file
Demarcation Plan28 Jan 2025

Building plans

3 files
Building Plan- HSVP Approval Letter2 Apr 2025Building Plan Approval Letter2 Apr 2025Approved Building Plans, Full Set30 Jan 2025

Services

Sewerage and drainage

4 files
Building Plan Approval Letter from STP Gurgaon2 Apr 2025Assurance- Sewerage Connection2 Apr 2025Building Plan- STP Revised Drawings Approval Letter2 Apr 2025Assurance- STP Treated Water2 Apr 2025

Water supply

1 file
Assurance- Fresh Water Supply2 Apr 2025

Electricity

1 file
Power Assurance2 Apr 2025

Service plans

1 file
Service Plans on the Layout29 Jan 2025

Approvals and clearances

DTCP licence

2 files
LOI2 Apr 2025Licence Copy with Land Schedule2 Apr 2025

Environment clearance

1 file
Environment Clearance- Wal Developments2 Apr 2025

Fire safety

2 files
Fire Scheme Approval Letter2 Apr 2025Building Plan- Fire Dept. Approval Letter2 Apr 2025

Other NOCs and clearances

6 files
Forest NOC2 Apr 2025NOC AAI2 Apr 2025Arravali NOC2 Apr 2025

Land records

Land records

5 files
Mutation2 Apr 2025Sijra2 Apr 2025Title Search Report2 Apr 2025

Money

Accounts and finance

2 files
Non-Default Certificate from a CA29 Jan 2025CA Certificate on the Application’s Figures29 Jan 2025

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit11 Feb 2025

Other filings

Other filings

1 file
RC No. GGM/938/670/2025/41 dated 01.05.2025 is hereby superseded by RC No. GM/938/670/2025/41/SS(1)/1 dated 10.08.202618 Aug 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

77 OF 2024 · Wal Developments Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 9 Jul 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 11 Feb 2025 · read 8 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

77 OF 2024: 10 parcels, 4.575 acres in all, in Dhorka (hadbast 120), tehsil Harsaru.

The licence register prints the same licensed area, 4.575 acres.

  • 36//16/27 kanal 9 marla
  • 36//1718 marla
  • 36//24/25 kanal 13 marla
  • 36//258 kanal
Show the other 6 parcels
  • 37//21/13 kanal 8 marla
  • 38//1/13 kanal 8 marla
  • 38//10/2/11 kanal 3 marla
  • 39//4/213 marla
  • 39//5/15 kanal 17 marla
  • 39//6/13 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Dhorka (hadbast 120), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 36//16/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan2 Apr 2025Approved Site Plan28 Jan 2025

Layout plan

1 file
Latest Layout Plan28 Jan 2025

Building plans

3 files
Building Plan- HSVP Approval Letter2 Apr 2025Building Plan Approval Letter2 Apr 2025Approved Building Plans, Full Set30 Jan 2025

Among the uploads Bhumiq read from HARERA's page on 8 Oct 2026 (36 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3320 · read 8 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Wal Developments

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.