106 Golf Avenue
by Empire Realtech · Sector 106, Gurugram
Not on our price list yet
Possession 28 Jul 2021 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 106, Gurugram1.2 km from Dwarka Expressway, in a straight linePrices and what changed
- Registered by
- EMPIRE REALTECH PVT. LTD.the company that filed it, for Empire Realtech
- 17 Sep 2012Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 21 Feb 2019Registered with HARERAHARERA, read 3 Nov 2026
- 30 Jun 2021Registration valid toHARERA, read 3 Nov 2026
- 28 Jul 2021Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft694–987 sq ft299
- 1,000–1,500 sq ft1,006–1,135 sq ft249
- 1,500–2,000 sq ft1,772 sq ft90
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 4 rows of a single unit, because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Air-conditioningProvision of piping and drain.
- KitchenVitrified tiles flooring, ceramic tiles TILL 600MM above counter, REST painted with oil bound distemper
- LiftsOne passenger and one service elevator in each tower
- FloorsVitrified tiles in living/dining. wooden flooring in bedrooms. ceramic tiles in servant room/store. anti-skid ceramic tiles in balconies.
- WallsInternal - acrylic/plastic emulsion paint on P.O.P. servant/store – oil bounded distemper
- BathroomsCounter top WASH basin in master toilet, single lever C.P. fittings, provision of geyser.
- WindowsUPVC windows
- Main doorSeasoned hardwood frames with polished decorative shutter.
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20251.2 km
- Delhi–Gurugram–SNB RRTS5.9 km
- Sohna Elevated Corridor (NH-248A)7.7 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Other register states: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Agrante Realty | Same sector | — | — | 31 Oct 2030 |
THE SKYLINENo photo on file yet | Mrg Castle Reality | Same sector | — | — | 30 Jun 2025 |
PLAZA 106 DDJAYNo photo on file yet | Magic Eye Developers | Same sector | — | — | 31 Dec 2024 |
| Godrej Real View Developers | Same sector | — | — | 30 Sep 2025 | |
| Godrej Real View Developers | Same sector | — | — | 30 Sep 2023 | |
No photo of the project on file yet | Mrg Group India | Same sector | — | — | 15 Nov 2027 |
No photo of the project on file yet | Mrg Group India | Same sector | — | — | 15 Nov 2027 |
No photo of the project on file yet | Agrante Realty | Same sector | — | — | 31 Dec 2030 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is 106 Golf Avenue registered with HARERA?From the records · HARERA, read 3 Nov 2026
HARERA lists it as GGM/314/46/2019/08, registered on 21 Feb 2019. The register’s record shows an end date of 30 Jun 2021. The register shows it as: Registration lapsed.
The source ↗What is the possession timeline for 106 Golf Avenue?From the records · HARERA, read 3 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 28 Jul 2021. Its registration runs to 30 Jun 2021; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around 106 Golf Avenue?From the records · Map pin and road lines, read 6 Sep 2026
106 Golf Avenue is in Sector 106, Gurugram; the site address declared to HARERA is Sector- 106, Gurugram. In a straight line it is about 1.2 km from Dwarka Expressway, 5.9 km from Delhi–Gurugram–SNB RRTS and 7.7 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building 106 Golf Avenue?From the records · HARERA, read 3 Nov 2026
106 Golf Avenue is a Empire Realtech project, registered by its company EMPIRE REALTECH PVT. LTD..
The source ↗Empire Realtech's projects and court recordThe records
What the registers hold for 106 Golf Avenue: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/314/46/2019/08: Registration lapsed. The register’s record shows an end date of 30 Jun 2021.HARERA, read 3 Nov 2026 · See it on HARERA ↗
- Land licence 69 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 2 Jul 2016.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 17 Sep 2012, building plans 17 Sep 2012.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 12 HARERA files, with the dates we read them
- Registration no.
- GGM/314/46/2019/08
- Registration date
- 21 Feb 2019
- Registration valid till
- 30 Jun 2021
- Declared possession
- 28 Jul 2021
Declared by the promoter to HARERA
- Land area
- 12.344 (Acre) (49,954.4 sq m)
- FAR
- the application prints 175, which is not a ratio
- licence
- 69 of 2012
- Estimated project cost
- ₹567.78 crore
- Cost of land
- ₹62.00 crore
- Layout plan, declared approved (field 5a)
- 17 Sept 2012
- Building plans, declared approved
- 17 Sept 2012
- Completion declared for
- 28 Jul 2021
Declared inventory · 29 types
Declared inventory — 29 types declared, first 8 shown
- APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-A - 3B+3T+SQ(1) · 50 units · 105.3 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-A - 3B+3T (L1) · 21 units · 93.5 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-A - 3B+3T (L2) · 21 units · 91.65 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-B -2B+2T · 60 units · 64.48 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-B -3B+3T · 15 units · 84.47 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-B -3B+3T(1) · 15 units · 84.84 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-C - 3B+3T+SQ. · 15 units · 105.46 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER-C - 3B+3T (L2C) · 15 units · 93.5 sq m carpet · one flat
Statutory approvals, as declared · 6
Statutory approvals, as declared
- I. FIRE FIGHTING SCHEME — declared: already been obtained (23 Mar 2013)
- II. SERVICE ESTIMATE — declared: already been obtained (21 May 2013)
- III. HEIGHT CLEARANCE — declared: already been obtained (7 Aug 2012)
- IV. FOREST NOC — declared: already been obtained (8 Aug 2012)
- V. ARAVALI NOC — declared: already been obtained (28 Dec 2012)
- VI. WATER NOC — declared: already been obtained (13 Sept 2012)
On file with HARERA · 12 files
On file with HARERA (12)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileServices
Service plans
1 fileApprovals and clearances
DTCP licence
1 fileLand records
Land records
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
69 OF 2012 · Empire Realtech · GURGAON-MANESAR
Licence valid to 2 Jul 2016
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 20 Nov 2018 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
69 OF 2012: 45 parcels, 12.3437 acres in all, in Daultabad (hadbast 53), tehsil Kadipur.
The licence register prints the same licensed area, 12.34 acres.
- 48//1/18 marla
- 48//1/2/13 kanal 6 marla
- 48//1/2/2/15 marla
- 48//1/2/2/22 marla
Show the other 41 parcels
- 48//1/2/2/2/1area printed as 0
- 48//1/2/3/15 marla
- 48//1/2/3/26 marla
- 48//1/2/3/310 marla
- 48//1/2/4/13 marla
- 48//1/2/4/25 marla
- 48//1/2/4/25 marla
- 48//10/1/14 marla
- 48//10/1/2/13 marla
- 48//10/1/2/22 marla
- 48//10/1/2/3/15 marla
- 48//10/1/2/3/25 marla
- 48//10/1/2/42 marla
- 48//10/1/2/519 marla
- 48//10/26 kanal
- 48//2/1/1/11 marla
- 48//2/1/1/2/11 kanal
- 48//2/1/1/2/21 kanal 2 marla
- 48//2/1/23 marla
- 48//2/1/3/11 kanal 13 marla
- 48//2/1/3/22 marla
- 48//2/22 kanal 18 marla
- 48//26/113 marla
- 48//26/27 marla
- 48//38 kanal
- 48//9/2/110 marla
- 48//9/2/2/11 kanal 1 marla
- 48//9/2/2/21 kanal 1 marla
- 48//9/2/31 kanal 14 marla
- 45//14/25 kanal 6 marla
- 45//168 kanal
- 45//178 kanal
- 45//188 kanal
- 45//21/2/13 kanal 14 marla
- 45//21/2/26 marla
- 45//21/2/3/11 kanal 5 marla
- 45//228 kanal
- 45//238 kanal
- 45//246 kanal 12 marla
- 45//257 kanal 2 marla
- 45//3110 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Daultabad (hadbast 53), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 48//1/1.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹7,700 per sq ft
Sector 106, collector rates effective 1 Apr 2026, Gurugram tehsil. 2 tehsil lists price this sector; this is the higher. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (12 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/233 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Empire Realtech
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

