Skip to content

THE WALK

by Mrg Group India · Sector 106, Gurugram

Not on our price list yet

Possession 15 Nov 2027 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 106, Gurugram1.2 km from Dwarka Expressway, in a straight line
Carpet area
274–601 sq ft
In m²25.4–55.9 m², as declared
Registered by
MRG GROUP INDIA PRIVATE LIMITEDthe company that filed it, for Mrg Group India
Timeline
  1. 23 Nov 2022Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 22 Nov 2023Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 15 Nov 2027Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside0.22 acres in all, by use
  • Other uses0.14 acres · 64%
  • Apartment buildings0.08 acres · 36%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • LiftsLifts
  • WindowsAluminium/glass
  • Electrical fittings2.5 to 4.00 MM ,polycab or equivalent

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 106, GurugramSector 106, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.2 km
  • Delhi–Gurugram–SNB RRTS5.9 km
  • Sohna Elevated Corridor (NH-248A)7.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is THE WALK registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/810/542/2024/37. Valid to 15 Nov 2027.

The source ↗
What is the possession timeline for THE WALK?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 15 Nov 2027. Its registration runs to 15 Nov 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around THE WALK?From the records · Map pin and road lines, read 6 Sep 2026

THE WALK is in Sector 106, Gurugram; the site address declared to HARERA is Sector-106, Gurugram. In a straight line it is about 1.2 km from Dwarka Expressway, 5.9 km from Delhi–Gurugram–SNB RRTS and 7.7 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building THE WALK?From the records · HARERA, read 4 Nov 2026

THE WALK is a Mrg Group India project, registered by its company MRG GROUP INDIA PRIVATE LIMITED.

The source ↗Mrg Group India's projects and court record

The records

What the registers hold for THE WALK: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/810/542/2024/37: Registered. Valid to 15 Nov 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 192 OF 2022 is on the DTCP register, valid to 22 Nov 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 23 Nov 2022, building plans 22 Nov 2023.Declared to HARERA, read 29 Oct 2026
The court record of Mrg Group India’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 21 HARERA files, with the dates we read them
Registration no.
GGM/810/542/2024/37
Registration valid till
15 Nov 2027
Declared possession
15 Nov 2027

Declared by the promoter to HARERA

Land area
0.2195 (Acre) (888.28 sq m)
FAR
the application prints 137, which is not a ratio
licence
192 of 2022 dated 23.11.2022
Estimated project cost
₹19.04 crore
Cost of land
₹2.42 crore
Layout plan, declared approved (field 5a)
23 Nov 2022
Building plans, declared approved
22 Nov 2023
Construction to start
16 Jul 2024
Completion declared for
15 Nov 2027
Declared inventory · 32 types

Declared inventory — 32 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 1 unit · 35.94 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 36.01 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 34.31 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 32.61 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 27.11 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 25.41 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 23.71 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 22.06 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENSE NO 192 OF 2022 DATED 23-11-2022 — declared: already been obtained (23 Nov 2022)
  • II. BUILDING PLANS — declared: already been obtained (22 Nov 2023)
  • III. ZONING PLANS — declared: already been obtained (23 Jun 2023)
On file with HARERA · 21 files

On file with HARERA (21)

Plans

Site plan

1 file
Approved Site Plan18 Dec 2023

Layout plan

1 file
Latest Layout Plan12 Jun 2024

Zoning plan

1 file
Zoning Plan12 Jun 2024

Demarcation plan

1 file
Demarcation Plan18 Dec 2023

Building plans

4 files
Approved Building Plans, Full Set12 Jun 2024Section Elevation Plan12 Jun 2024Terrace Plan12 Jun 2024X Section12 Jun 2024

Floor plans

2 files
First & Second Floor12 Jun 2024Mezzanine Floor12 Jun 2024

Services

Service plans

1 file
Service Plans on the Layout18 Dec 2023

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule17 Dec 2023

Land records

Land records

3 files
Jamabandi Attested on 15-02-202412 Jun 2024NEC12 Jun 2024Mutation Attested on 15-02-202412 Jun 2024

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures12 Jun 2024Cash Flow Statement12 Jun 2024Non-Default Certificate from a CA12 Jun 2024

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit18 Dec 2023

Other filings

Other filings

2 files
Upper Ground12 Jun 2024Lower Ground12 Jun 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

192 OF 2022 · MRG GROUP INDIA PVT.LTD. · GURGAON-MANESAR

Licence valid to 22 Nov 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 18 Dec 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

192 OF 2022: 16 parcels, 8.1687 acres in all, in Babupur (hadbast 60), tehsil Gurgaon.

The licence register prints the same licensed area, 8.1688 acres.

  • 19//15/16 marla
  • 19//63 marla
  • 20//10/1/42 kanal 15 marla
  • 20//118 kanal
Show the other 12 parcels
  • 20//12/12 kanal 8 marla
  • 20//12/24 kanal 4 marla
  • 20//192 kanal 4 marla
  • 20//20/12 kanal 13 marla
  • 20//20/25 kanal 7 marla
  • 20//21/13 kanal 11 marla
  • 20//228 kanal
  • 20//9/1/1418 marla
  • 28//28 kanal
  • 28//38 kanal
  • 28//48 kanal
  • 28//9/118 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Babupur (hadbast 60), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 19//15/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan18 Dec 2023

Layout plan

1 file
Latest Layout Plan12 Jun 2024

Building plans

4 files
Approved Building Plans, Full Set12 Jun 2024Section Elevation Plan12 Jun 2024Terrace Plan12 Jun 2024X Section12 Jun 2024

Floor plans

2 files
First & Second Floor12 Jun 2024Mezzanine Floor12 Jun 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (21 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2731 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Mrg Group India

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.