Skip to content

Godrej Meridien-III

by Godrej Real View Developers · Sector 106, Gurugram

Not on our price list yet

Possession 30 Sep 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 106, Gurugram1.2 km from Dwarka Expressway, in a straight linePrices and what changed
Registered
10 Feb 2020
Registered by
GODREJ REAL VIEW DEVELOPERS PRIVATE LIMITEDthe company that filed it, for Godrej Real View Developers
Timeline
  1. 21 Mar 2018Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 10 Feb 2020Registered with HARERAHARERA, read 4 Nov 2026
  3. 30 Sep 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 30 Mar 2027Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioningACS
  • KitchenGlazed ceramic tiles DADO/acrylic emulsion
  • Lifts2 lifts – 10 PAX 1 lift – 16 PAX (37 landing ) 2.5 M/S
  • FloorsBedrooms: laminated wooden floor living/ dining: marble
  • WallsAcrylic emulsion
  • BathroomsAll provided of standard company make
  • WindowsAluminium with glass
  • Main doorFlush door with veneer

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 106, GurugramSector 106, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.2 km
  • Delhi–Gurugram–SNB RRTS5.9 km
  • Sohna Elevated Corridor (NH-248A)7.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 3

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Godrej Meridien-III registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/393/125/2020/09, registered on 10 Feb 2020. Valid to 30 Mar 2027.

The source ↗
What is the possession timeline for Godrej Meridien-III?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2025. Its registration runs to 30 Mar 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Godrej Meridien-III?From the records · Map pin and road lines, read 6 Sep 2026

Godrej Meridien-III is in Sector 106, Gurugram; the site address declared to HARERA is Sector 106. In a straight line it is about 1.2 km from Dwarka Expressway, 5.9 km from Delhi–Gurugram–SNB RRTS and 7.7 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Godrej Meridien-III?From the records · HARERA, read 4 Nov 2026

Godrej Meridien-III is a Godrej Real View Developers project, registered by its company GODREJ REAL VIEW DEVELOPERS PRIVATE LIMITED.

The source ↗Godrej Real View Developers's projects and court record

The records

What the registers hold for Godrej Meridien-III: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/393/125/2020/09: Registered. Valid to 30 Mar 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 18 OF 2008 is on the DTCP register, valid to 1 Feb 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 21 Mar 2018, building plans 21 Mar 2018.Declared to HARERA, read 29 Oct 2026
The court record of Godrej Real View Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 30 Mar 2027. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 27 HARERA files, with the dates we read them
Registration no.
GGM/393/125/2020/09
Registration date
10 Feb 2020
Registration valid till
30 Mar 2027
Declared possession
30 Sept 2025

Declared by the promoter to HARERA

Land area
14.793 (Acre) (59,865.15 sq m)
FAR
the application prints 184, which is not a ratio
licence
18 of 2008 (15.02.2020)
Estimated project cost
₹727.12 crore
Cost of land
₹108.78 crore
Layout plan, declared approved (field 5a)
21 Mar 2018
Building plans, declared approved
21 Mar 2018
Construction to start
30 Sept 2020
Completion declared for
30 Sept 2025
Declared inventory · 14 types

Declared inventory — 14 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 38 units · 52,420.86 sq m carpet · 4 towers
  • Apartment/Shops/Other Buildings · 24 units · 3,311.28 sq m carpet · 4 towers
  • Apartment/Shops/Other Buildings · 66 units · 12,427.8 sq m carpet · 4 towers
  • Apartment/Shops/Other Buildings · 2 units · 209.46 sq m carpet · 4 towers
  • Apartment/Shops/Other Buildings · 2 units · 716.66 sq m carpet · 4 towers
  • Apartment/Shops/Other Buildings · 2 units · 550.92 sq m carpet · 4 towers
  • Apartment/Shops/Other Buildings · 97 units · 13,386 sq m carpet · 5 towers
  • Apartment/Shops/Other Buildings · 1 unit · 110.91 sq m carpet · 5 towers
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. LICENSE (RENEWED) — declared: already been obtained (15 Feb 2018)
  • II. ZONING PLAN APPROVAL — declared: already been obtained (25 Oct 2016)
  • III. BUILDING PLAN APPROVAL — declared: already been obtained (21 Mar 2018)
  • IV. ENVIRONMENT CLEARANCE — declared: already been obtained (4 Apr 2018)
  • V. AIRPORT AUTHORITY NOC — declared: already been obtained (14 Oct 2016)
  • VI. FIRE SCHEME APPROVAL — declared: already been obtained (18 May 2018)
  • VII. SERVICE PLAN ESTIMATE — declared: already been obtained (25 Jun 2018)
  • VIII. FOREST NOC — declared: already been obtained (18 Jul 2016)
On file with HARERA · 27 files

On file with HARERA (27)

Plans

Site plan

3 files
Approved Site Plan3 Feb 2020Superimposed Plan3 Feb 2020Approved Site Plan23 Dec 2019

Layout plan

1 file
Latest Layout Plan23 Dec 2019

Zoning plan

1 file
Zoning Plan23 Dec 2019

Demarcation plan

2 files
Demarcation Drawing3 Feb 2020Demarcation Plan23 Dec 2019

Building plans

3 files
Elevation Drawings3 Feb 2020Floor Plan Drawings3 Feb 2020Approved Building Plans, Full Set23 Dec 2019

Services

Electricity

2 files
Annexure-2 Electrical Plan3 Feb 2020Annexure-3 Lighting Plan3 Feb 2020

Roads

1 file
Annexure- 1 Road Layout Plan3 Feb 2020

Service plans

2 files
Service Estimate Drawings3 Feb 2020Service Plans on the Layout23 Dec 2019

Approvals and clearances

Occupation certificate (OC)

3 files
Occupation Certificate21 Oct 2026Occupation Certificate21 Oct 2026Occupation Certificate21 Oct 2026

DTCP licence

1 file
Licence Copy with Land Schedule23 Dec 2019

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration23 Dec 2019

Sales papers

Allotment and sale agreements

1 file
BBA3 Feb 2020

Money

Accounts and finance

3 files
Cash Flow Statement24 Dec 2019CA Certificate on the Application’s Figures23 Dec 2019Non-Default Certificate from a CA23 Dec 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit23 Dec 2019

Company papers

1 file
Board Resolution10 Feb 2020

HARERA’s orders

HARERA’s orders

1 file
Extension No. 04 of 2026 dated 12.02.202616 Feb 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

18 OF 2008 · Countrywide Promoters · GURGAON-MANESAR

Licence valid to 1 Feb 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 24 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

18 OF 2008

DTCP’s page showed no land schedule for licence 18 OF 2008 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate, residential flat
₹7,700 per sq ft

Sector 106, collector rates effective 1 Apr 2026, Gurugram tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Approved Site Plan3 Feb 2020Superimposed Plan3 Feb 2020Approved Site Plan23 Dec 2019

Layout plan

1 file
Latest Layout Plan23 Dec 2019

Building plans

3 files
Elevation Drawings3 Feb 2020Floor Plan Drawings3 Feb 2020Approved Building Plans, Full Set23 Dec 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (27 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1138 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Godrej Real View Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.