Skip to content

Affordable Group Housing Colony

by Lotus Realtech · Sector 111, Gurugram

Not on our price list yet

Possession 30 Sep 2021 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 111, Gurugram0.5 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
337–606 sq ft
In m²about 31–56 m², as declared
Registered
18 Sep 2017
Registered by
LOTUS REALTECH PVT LTDthe company that filed it, for Lotus Realtech
Timeline
  1. 22 Oct 2014Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 18 Sep 2017Registered with HARERAHARERA, read 3 Nov 2026
  3. 30 Sep 2021Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 30 Dec 2021Registration valid toHARERA, read 3 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

812homes, 337 to 606 sq ft of carpet area
  • Under 1,000 sq ft337–606 sq ft812

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside5.094 acres in all, by use
  • Apartment buildings1.515 acres · 30%
  • Roads1.395 acres · 27%
  • Other usesas the form names them: Rain0.729 acres · 14%
  • Parks and playgrounds0.556 acres · 11%
  • Parking0.323 acres · 6%
  • Green belts0.285 acres · 6%
  • Shops and offices0.199 acres · 4%
  • Club house0.092 acres · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningNot provided
  • KitchenTiles upto 2 FEET high above marble counter & oil bound distemper in balance area
  • Kitchen appliancesNot provided
  • LiftsOne in each tower
  • WardrobesNot provided
  • FloorsTiles
  • WallsOil bound distemper
  • BathroomsCP fittings

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 111, GurugramSector 111, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.5 km
  • Delhi–Gurugram–SNB RRTS4.0 km
  • Sohna Elevated Corridor (NH-248A)8.6 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Affordable Group Housing Colony registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as 214 OF 2017, registered on 18 Sep 2017. Ended 30 Dec 2021. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Affordable Group Housing Colony?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2021. Its registration runs to 30 Dec 2021; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Affordable Group Housing Colony?From the records · Map pin and road lines, read 6 Sep 2026

Affordable Group Housing Colony is in Sector 111, Gurugram; the site address declared to HARERA is Village Chauma , Sector-111 , Gurugram. In a straight line it is about 0.5 km from Dwarka Expressway, 4.0 km from Delhi–Gurugram–SNB RRTS and 8.6 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Affordable Group Housing Colony?From the records · HARERA, read 3 Nov 2026

Affordable Group Housing Colony is a Lotus Realtech project, registered by its company LOTUS REALTECH PVT LTD.

The source ↗Lotus Realtech's projects and court record

The records

What the registers hold for Affordable Group Housing Colony: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 214 OF 2017: Registration expired. Ended 30 Dec 2021.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 47 OF 2014 is on the DTCP register: Licence lapsed; the register prints its validity to 31 May 2021.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 22 Oct 2014, building plans 22 Oct 2014.Declared to HARERA, read 29 Oct 2026
The court record of Lotus Realtech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 30 Dec 2021. HARERA Gurugram, read 3 Nov 2026. Source

  • Red flag: Licence 47 OF 2014 lapsed

    Named in this project’s application. Valid to 31 May 2021; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 32 HARERA files, with the dates we read them
Registration no.
214 OF 2017
Registration date
18 Sept 2017
Registration valid till
30 Dec 2021
Declared possession
30 Sept 2021

Declared by the promoter to HARERA

Land area
5.09375 (Acre) (20,613.67 sq m)
FAR
3.98 proposed of 2.25 permissible
licence
47 of 2014
Estimated project cost
₹152.02 crore
Cost of land
₹46.89 crore
Layout plan, declared approved (field 5a)
22 Oct 2014
Building plans, declared approved
22 Oct 2014
Completion declared for
30 Sept 2021
Declared inventory · 7 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type A1 · 390 units · 56.257 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type A2 · 200 units · 31.305 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type A3 · 200 units · 33.093 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type A4 · 10 units · 38.841 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type A5 · 4 units · 36.429 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type A6 · 4 units · 36.222 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type A7 · 4 units · 38.654 sq m carpet · one flat
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. ENVIRONMENTAL CLEARANCE — declared: already been obtained (1 Jul 2016)
  • II. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (16 Mar 2015)
  • III. BUILDING APPROVAL LETTER — declared: already been obtained (22 Oct 2014)
  • IV. FOREST NOC — declared: already been obtained (30 Oct 2015)
  • V. LICENCE — declared: already been obtained (18 Jun 2014)
  • VI. COOLABORATION AGREEMENT — declared: already been obtained (14 Aug 2013)
On file with HARERA · 32 files

On file with HARERA (32)

Plans

Site plan

1 file
Approved Site Plan3 Dec 2019

Layout plan

1 file
Latest Layout Plan3 Dec 2019

Zoning plan

1 file
Zoning Plan3 Dec 2019

Demarcation plan

1 file
Demarcation Plan10 Feb 2020

Building plans

3 files
Elevation & Section 310 Feb 2020Commercial Elevation & Section10 Feb 2020Approved Building Plans, Full Set3 Dec 2019

Floor plans

3 files
Commercial Block Floor Plan10 Feb 2020Floor Plan10 Feb 2020Floor Plan 310 Feb 2020

Services

Service plans

3 files
Service Estimate10 Feb 2020Service Plan Approval Letter10 Feb 2020Service Plans on the Layout3 Dec 2019

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded9 Oct 2025

DTCP licence

3 files
LC IV10 Feb 2020LOI10 Feb 2020Licence Copy with Land Schedule3 Dec 2019

Environment clearance

1 file
Environment Clearance10 Feb 2020

Fire safety

1 file
Fire Scheme Approval10 Feb 2020

Other NOCs and clearances

2 files
AAI Clearance10 Feb 2020Forest NOC10 Feb 2020

Land records

Land records

2 files
Revenue Record Entry of Licence and Collaboration10 Feb 2020Non Encumbrance Certificate10 Feb 2020

Sales papers

Allotment and sale agreements

1 file
Draft of Builder Buyer Agreement4 Dec 2019

Money

Accounts and finance

4 files
Demand Draft Detail10 Feb 2020Cash Flow Statement4 Dec 2019CA Certificate on the Application’s Figures3 Dec 2019Non-Default Certificate from a CA3 Dec 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit10 Feb 2020

Company papers

1 file
Details of Authorized Signatory10 Feb 2020

HARERA’s orders

HARERA’s orders

1 file
Extension No. 03 of 2021 Dated 01.02.202113 Jul 2022

Other filings

Other filings

1 file
Community Hall10 Feb 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

47 OF 2014 · Lotus Realtech Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 31 May 2021

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 4 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

47 OF 2014: 7 parcels, 5.0938 acres in all, in Choma (hadbast 62), tehsil Gurgaon.

The licence register prints the same licensed area, 5.09 acres.

  • 39//138 kanal
  • 39//148 kanal
  • 39//17/11 kanal 7 marla
  • 39//17/26 kanal 13 marla
Show the other 3 parcels
  • 39//187 kanal 4 marla
  • 39//234 kanal 1 marla
  • 39//245 kanal 10 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Choma (hadbast 62), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 39//13.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹7,700 per sq ft

Sector 111, collector rates effective 1 Apr 2026, Gurugram tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan3 Dec 2019

Layout plan

1 file
Latest Layout Plan3 Dec 2019

Building plans

3 files
Elevation & Section 310 Feb 2020Commercial Elevation & Section10 Feb 2020Approved Building Plans, Full Set3 Dec 2019

Floor plans

3 files
Commercial Block Floor Plan10 Feb 2020Floor Plan10 Feb 2020Floor Plan 310 Feb 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (32 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1016 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Lotus Realtech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.