Skip to content

M3M MANSION PH-2

by Union Buildmart · Sector 113, Gurugram

Not on our price list yet

Possession 29 Feb 2032 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 113, Gurugram0.6 km from Dwarka Expressway, in a straight line
Carpet area
1,495–4,165 sq ft
In m²about 139–387 m², as declared
Registered by
UNION BUILDMART PRIVATE LIMITEDthe company that filed it, for Union Buildmart
Timeline
  1. 27 Jan 2025Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 28 Feb 2031Registration valid toHARERA, read 4 Nov 2026
  3. 29 Feb 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

242homes, 1,495 to 4,165 sq ft of carpet area
  • 1,000–1,500 sq ft1,495 sq ft60
  • 1,500–2,000 sq ft1,520–1,955 sq ft67
  • 2,000–2,500 sq ft2,022–2,035 sq ft113
  • 3,000 sq ft and above4,165 sq ft2

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 2 rows of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside1.515 acres in all, by use
  • Apartment buildings1.515 acres · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenCombination of tiles and plaster with fittings
  • LiftsLifts as per building plans
  • FloorsVitrified tiles/laminatedwooden floor/ceramic tile
  • WallsPlaster with OBD or above
  • BathroomsCP fittings & chinaware
  • WindowsGlass with aluminium / UPVC
  • Main doorHard wood door frame withflush door /laminate
  • Electrical fittingsAs per approved make

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 113, GurugramSector 113, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.6 km
  • Delhi–Gurugram–SNB RRTS5.0 km
  • Sohna Elevated Corridor (NH-248A)9.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is M3M MANSION PH-2 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/916/648/2025/19. Valid to 28 Feb 2031.

The source ↗
What is the possession timeline for M3M MANSION PH-2?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 29 Feb 2032. Its registration runs to 28 Feb 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around M3M MANSION PH-2?From the records · Map pin and road lines, read 6 Sep 2026

M3M MANSION PH-2 is in Sector 113, Gurugram; the site address declared to HARERA is Sector 113, Vill Chauma,Gurugram. In a straight line it is about 0.6 km from Dwarka Expressway, 5.0 km from Delhi–Gurugram–SNB RRTS and 9.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building M3M MANSION PH-2?From the records · HARERA, read 4 Nov 2026

M3M MANSION PH-2 is a Union Buildmart project, registered by its company UNION BUILDMART PRIVATE LIMITED.

The source ↗Union Buildmart's projects and court record

The records

What the registers hold for M3M MANSION PH-2: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/916/648/2025/19: Registered. Valid to 28 Feb 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 229 OF 2023 is on the DTCP register, valid to 1 Nov 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 27 Jan 2025, building plans 27 Jan 2025.Declared to HARERA, read 29 Oct 2026
The court record of Union Buildmart’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 62 HARERA files, with the dates we read them
Registration no.
GGM/916/648/2025/19
Registration valid till
28 Feb 2031
Declared possession
29 Feb 2032

Declared by the promoter to HARERA

Land area
1.515 (Acre) (6,130.99 sq m)
FAR
5.09 proposed of 5.12 permissible
licence
DTCP License no 229 of 2023 dated 02.11.2023
Estimated project cost
₹1120.38 crore
Cost of land
₹368.86 crore
Layout plan, declared approved (field 5a)
27 Jan 2025
Building plans, declared approved
27 Jan 2025
Construction to start
1 Feb 2025
Completion declared for
29 Feb 2032
Declared inventory · 10 types

Declared inventory — 10 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 60 units · 138.89 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 30 units · 141.21 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 30 units · 141.68 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 4 units · 158.33 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 3 units · 181.59 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 60 units · 187.85 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 53 units · 189.06 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 284.68 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. LICENSE APPROVAL — declared: already been obtained (2 Nov 2023)
  • II. LOI APPROVAL — declared: already been obtained (18 Apr 2023)
  • III. CONSTRUCTION WATER ASSURANCE — declared: already been obtained (1 Dec 2023)
  • IV. DRINKING WATER ASSURANCE — declared: already been obtained (1 Dec 2023)
  • V. STORM WATER CONNECTION ASSURANCE — declared: already been obtained (7 Nov 2023)
  • VI. SEWERAGE CONNECTION ASSURANCE — declared: already been obtained (1 Dec 2023)
  • VII. ENVIRONMENT CLEARANCE — declared: already been obtained (19 May 2024)
  • VIII. FOREST NOC — declared: already been obtained (7 Aug 2018)
  • IX. BUILDING PLAN APPROVAL (BRIII) — declared: already been obtained (27 Jan 2025)
  • X. ROAD ACCESS PERMISSION — declared: already been obtained (29 May 2024)
On file with HARERA · 62 files

On file with HARERA (62)

Plans

Site plan

3 files
Site Plan with Services18 Feb 2025Site Plan18 Feb 2025Approved Site Plan24 Jan 2025

Layout plan

13 files
T-B Second Floor Layout18 Feb 2025T-B First Floor Layout18 Feb 2025T-A Stilt Level Layout18 Feb 2025

Zoning plan

1 file
Revised Zoning Plan18 Feb 2025

Demarcation plan

1 file
Demarcation Plan18 Feb 2025

Building plans

16 files
T-A Elevation-218 Feb 2025Structural Plan-118 Feb 2025Structural Plan-418 Feb 2025

Floor plans

2 files
T-A Typical 3rd to 18TH, 20th to 26th Floor Plan18 Feb 2025T-B Penthouse Floor18 Feb 2025

Services

Sewerage and drainage

2 files
Sewragw Connection Assurance24 Jan 2025Storm Water Connection Assurance24 Jan 2025

Water supply

2 files
Construction Water Assurance24 Jan 2025Drinking Water Assurance24 Jan 2025

Service plans

1 file
Service Plans & Estimates Application18 Feb 2025

Approvals and clearances

DTCP licence

5 files
LOI18 Feb 2025License18 Feb 2025Licence Copy with Land Schedule24 Jan 2025

Environment clearance

2 files
Environment Clearance18 Feb 2025EC24 Jan 2025

Fire safety

1 file
Fire Scheme Application18 Feb 2025

Other NOCs and clearances

2 files
Aravali NOC24 Jan 2025Forest NOC24 Jan 2025

Land records

Land records

7 files
Jamabandi18 Feb 2025Mutation18 Feb 2025Rapat18 Feb 2025

Money

Accounts and finance

1 file
Non-Default Certificate from a CA24 Jan 2025

The promoter’s papers

Declarations and affidavits

2 files
Rep-II18 Feb 2025The Promoter’s Declaration on Affidavit24 Jan 2025

HARERA’s orders

HARERA’s orders

1 file
Amendment in the Registration Certificate- Change of name of the group housing project from "M3M Mansion Ph-2" to "M3M St. Andrews at SCDA"5 Jun 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

229 OF 2023 · Union Buildmart Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 1 Nov 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 24 Jan 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

229 OF 2023

DTCP’s page showed no land schedule for licence 229 OF 2023 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Site Plan with Services18 Feb 2025Site Plan18 Feb 2025Approved Site Plan24 Jan 2025

Layout plan

13 files
T-B Second Floor Layout18 Feb 2025T-B First Floor Layout18 Feb 2025T-A Stilt Level Layout18 Feb 2025T-A 27TH,28TH &30TH; Floor Layout18 Feb 2025T-A Second Floor Layout18 Feb 2025T-B TYPICAL(19TH,29TH) Floor Layout18 Feb 2025

Building plans

16 files
T-A Elevation-218 Feb 2025Structural Plan-118 Feb 2025Structural Plan-418 Feb 2025Structural Plan-618 Feb 2025T-B Elevation Plan-218 Feb 2025T-B Terrace & Mumty Plan18 Feb 2025

Floor plans

2 files
T-A Typical 3rd to 18TH, 20th to 26th Floor Plan18 Feb 2025T-B Penthouse Floor18 Feb 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (62 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3280 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Union Buildmart

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.