Not on our price list yet
Possession 30 Jun 2026 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 113, Gurugram0.6 km from Dwarka Expressway, in a straight linePrices and what changed
- Carpet area
- about 890 sq ft
In m²
about 82.7 m², the average flat, as declared - Registered by
- UNION BUILDMART PRIVATE LIMITEDthe company that filed it, for M3M India
- 18 Jan 2022Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 30 Jun 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026
- 29 Jun 2027Registration valid toHARERA, read 4 Nov 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Parks and playgrounds2.248 acres · 46%
- Roads1.262 acres · 26%
- Other usesas the form names them: Open0.679 acres · 14%
- Apartment buildings0.667 acres · 14%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Lifts3 lift per tower
- FloorsVitrified tiles/laminated wooden floor/ceramic tile
- WallsPlaster with OBD
- WindowsGlass with aluminium framing sliding
- Main doorHard wood door frame with flush door /laminate
- Electrical fittingsAs per approved make
- Gas pipelineService provider
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20250.6 km
- Delhi–Gurugram–SNB RRTS5.0 km
- Sohna Elevated Corridor (NH-248A)9.3 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 4
- Registered, no OC or CC yet: 9
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
SMARTWORLD ONE DXP PHASE-2No photo on file yet | Nourish Developers | Same sector | — | — | 31 Aug 2031 |
No photo of the project on file yet | Union Buildmart | Same sector | — | — | 29 Feb 2032 |
SMARTWORLD ONE DXP STREETNo photo on file yet | Nourish Developers | Same sector | — | — | 31 Dec 2027 |
| Union Buildmart | Same sector | — | — | 31 Dec 2026 | |
| Union Buildmart | Same sector | — | — | 31 Mar 2027 | |
| M3M India | Same sector | Under construction | ₹22,000/sq ft | 29 Feb 2032 | |
![]() | Smartworld Developers | Same sector | Under construction | ₹17,000/sq ft | 31 Dec 2027 |
| Emaar India | 1.1 kmto its sector’s point | — | — | 31 Mar 2029 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is M3M Capital registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/531/263/2022/06. Valid to 29 Jun 2027.
The source ↗What is the possession timeline for M3M Capital?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 30 Jun 2026. Its registration runs to 29 Jun 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around M3M Capital?From the records · Map pin and road lines, read 6 Sep 2026
M3M Capital is in Sector 113, Gurugram; the site address declared to HARERA is Sector -113, Gurugram Manesar Urban Complex, Gurugram, Haryana.. In a straight line it is about 0.6 km from Dwarka Expressway, 5.0 km from Delhi–Gurugram–SNB RRTS and 9.3 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building M3M Capital?From the records · HARERA, read 4 Nov 2026
M3M Capital is a M3M India project, registered by its company UNION BUILDMART PRIVATE LIMITED.
The source ↗M3M India's projects and court recordThe records
What the registers hold for M3M Capital: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/531/263/2022/06: Registered. Valid to 29 Jun 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 106 OF 2021 is on the DTCP register: Licence ends soon; the register prints its validity to 15 Dec 2026.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 18 Jan 2022, building plans 18 Jan 2022.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Amber flag: Licence 106 OF 2021 ends soon
Named in this project’s application. Valid to 15 Dec 2026. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 37 HARERA files, with the dates we read them
- Registration no.
- GGM/531/263/2022/06
- Registration valid till
- 29 Jun 2027
- Declared possession
- 30 Jun 2026
Declared by the promoter to HARERA
- Land area
- 4.856 (Acre) (19,651.53 sq m)
- FAR
- 1.25 proposed
- licence
- 106 of 2021 dated 16.12.2021
- Estimated project cost
- ₹599.66 crore
- Cost of land
- ₹122.74 crore
- Layout plan, declared approved (field 5a)
- 18 Jan 2022
- Building plans, declared approved
- 18 Jan 2022
- Construction to start
- 18 Jan 2022
- Completion declared for
- 30 Jun 2026
Declared inventory · 5 types
Declared inventory
- Apartment/Shops/Other Buildings · 136 units · 11,147.61 sq m carpet · 1 tower · total for 136 flats, about 82 m² each
- Apartment/Shops/Other Buildings · 136 units · 11,819.48 sq m carpet · 1 tower · total for 136 flats, about 86.9 m² each
- Apartment/Shops/Other Buildings · 144 units · 11,718.03 sq m carpet · 1 tower · total for 144 flats, about 81.4 m² each
- Apartment/Shops/Other Buildings · 144 units · 11,718.03 sq m carpet · 1 tower · total for 144 flats, about 81.4 m² each
- Apartment/Shops/Other Buildings · 84 units · 6,830.42 sq m carpet · 1 tower · total for 84 flats, about 81.3 m² each
Statutory approvals, as declared · 4
Statutory approvals, as declared
- I. LICENCE — declared: already been obtained (16 Dec 2021)
- II. BUILDING PLAN APPROVAL — declared: already been obtained (18 Jan 2022)
- III. FOREST NOC — declared: already been obtained (7 Aug 2018)
- IV. ARAVALI NOC — declared: already been obtained (27 Aug 2018)
On file with HARERA · 37 files
On file with HARERA (37)
Plans
Site plan
2 filesLayout plan
3 filesZoning plan
1 fileDemarcation plan
1 fileBuilding plans
8 filesFloor plans
3 filesServices
Sewerage and drainage
2 filesWater supply
2 filesRoads
1 fileLandscape and green areas
1 fileApprovals and clearances
Occupation certificate (OC)
1 fileDTCP licence
1 fileFire safety
2 filesLand records
Land records
2 filesMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileCompany papers
1 fileHARERA’s orders
HARERA’s orders
2 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
106 OF 2021 · Union Buildmart Pvt. Ltd. · GURGAON-MANESAR
Licence valid to 15 Dec 2026
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 20 Jan 2022 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
106 OF 2021
DTCP’s page showed no land schedule for licence 106 OF 2021 when Bhumiq read it on 18 Oct 2026. verify at source
- Collector rate, residential flat
- ₹7,700 per sq ft
Sector 113, collector rates effective 1 Apr 2026, Gurugram tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
3 filesBuilding plans
8 filesFloor plans
3 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (37 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1847 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on M3M India
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.