ANANTAVILASA
by Mnb Build Fab · Sector 56, Gurugram
Not on our price list yet
Possession 31 Dec 2030 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 56, Gurugram5.8 km from Sohna Elevated Corridor (NH-248A), in a straight line
- Registered by
- MNB BUILD FAB PRIVATE LIMITEDthe company that filed it, for Mnb Build Fab
- 10 Oct 2024Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Dec 2030Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 1,500–2,000 sq ft1,701–1,761 sq ft72
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 2 rows of a single unit, because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings1,376 m² · 40%
- Pavements1,189 m² · 35%
- Green belts516 m² · 15%
- Other uses258 m² · 8%
- Sewage and waste treatment91 m² · 3%
- Electricity sub-station9 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningAs per ISI specifications
- KitchenModular kitchen
- WardrobesAs per ISI specifications
- FloorsGood quality italian stone
- WallsPlastic paint
- BathroomsCP fittings
- WindowsUPVC
- Main doorFlush doors 30MM thick with 1MM sunmica
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)5.8 km
- Delhi–Gurugram–SNB RRTS6.2 km
- Dwarka ExpresswayOpen, 17 Aug 202510.8 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Registered, no OC or CC yet: 2
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
TREVOC ROYAL RESIDENCESNo photo on file yet | Jhs Estate | Same sector | — | — | 6 Feb 2030 |
Splendor SpectrumoneNo photo on file yet | Splendor Buildwell | 1.4 kmto its sector’s point | — | — | 20 Nov 2018 |
| Oberoi | 1.4 kmto its sector’s point | — | — | 31 Dec 2033 | |
| Oberoi | 1.4 kmto its sector’s point | — | — | 31 Dec 2033 | |
| Oberoi | 1.4 kmto its sector’s point | — | — | 31 Dec 2033 | |
| Oberoi | 1.4 kmto its sector’s point | — | — | 31 Dec 2033 | |
| Oberoi | 1.4 kmto its sector’s point | — | — | 31 Dec 2033 | |
![]() | Oberoi | 1.4 kmto its sector’s point | New launch | ₹35,000/sq ft | 31 Dec 2033 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is ANANTAVILASA registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/899/631/2025/02. Valid to 31 Dec 2030.
The source ↗What is the possession timeline for ANANTAVILASA?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2030. Its registration runs to 31 Dec 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around ANANTAVILASA?From the records · Map pin and road lines, read 6 Sep 2026
ANANTAVILASA is in Sector 56, Gurugram; the site address declared to HARERA is Gh26a, Sector 56, Urban Estate-Ii, Gurugram, Haryana. In a straight line it is about 5.8 km from Sohna Elevated Corridor (NH-248A), 6.2 km from Delhi–Gurugram–SNB RRTS and 10.8 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building ANANTAVILASA?From the records · HARERA, read 4 Nov 2026
ANANTAVILASA is a Mnb Build Fab project, registered by its company MNB BUILD FAB PRIVATE LIMITED.
The source ↗Mnb Build Fab's projects and court recordThe records
What the registers hold for ANANTAVILASA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/899/631/2025/02: Registered. Valid to 31 Dec 2030.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Plans approved, as the developer declared: layout plan 10 Oct 2024, building plans 10 Oct 2024.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 53 HARERA files, with the dates we read them
- Registration no.
- GGM/899/631/2025/02
- Registration valid till
- 31 Dec 2030
- Declared possession
- 31 Dec 2030
Declared by the promoter to HARERA
- Land area
- 3438.75 (Sqr/mtrs)
- FAR
- 4.12 proposed of 4.12 permissible
- licence
- The land for the project was allotted by the Haryana Shehri Vikas Pradhikaran (HSVP) to the Promoter through an e-auction process on a freehold basis, vide Allotment Letter dated 29.09.2023 ( Vide Memo No. ZO002/EO018/UE029/GALOT/0000001157) for the development of group housing tower thereon.
- Estimated project cost
- ₹263.44 crore
- Cost of land
- ₹67.99 crore
- Layout plan, declared approved (field 5a)
- 10 Oct 2024
- Building plans, declared approved
- 10 Oct 2024
- Construction to start
- 1 Jan 2025
- Completion declared for
- 31 Dec 2030
Declared inventory · 7 types
Declared inventory
- Apartment/Shops/Other Buildings · 14 units · 162.56 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 15 units · 163.57 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 15 units · 162.56 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 14 units · 163.06 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 14 units · 158.05 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 1 unit · 162.56 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 1 unit · 163.06 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 15
Statutory approvals, as declared
- I. ASSURANCE FOR SEWERAGE CONNECTION FOR DISCHARGE OF 50 KLD SURPLUS DOMESTIC TREATED EFFLUENT. — declared: already been obtained (22 Jul 2024)
- II. ASSURANCE FOR STORM WATER CONNECTION OF PROPOSED GROUP HOUSING PROJECT. — declared: already been obtained (22 Jul 2024)
- III. NO OBJECTION CERTIFICATE FOR HIGHT CLEARANCE — declared: already been obtained (20 Aug 2024)
- IV. NO OBJECTION CERTIFICATE FOR FIRE — declared: already been obtained (24 Feb 2024)
- V. ENVIRONMENT CLEARANCE — declared: already been obtained (29 Oct 2024)
- VI. MINING PERMISSION — declared: already been obtained (5 Nov 2024)
- VII. TREE CUTTING PERMISSION — declared: already been obtained (19 Dec 2023)
- VIII. GREEN RATING FOR INTEGRATED HABITAT ASSESSMENT — declared: already been obtained (5 Aug 2024)
- IX. BUILDING PLAN — declared: already been obtained (10 Oct 2024)
- X. ASSURANCE FOR WATER SUPPLY 5 KLD FOR DOMESTIC PURPOSE. — declared: already been obtained (23 Jul 2024)
- XI. ASSURANCE FOR SUPPLY OF 30 KLD STP TREATED WATER FOR CONSTRUCTION OF GROUP HOUSING PROJECT. — declared: already been obtained (22 Jul 2024)
- XII. SITE PLAN — declared: already been obtained (10 Oct 2024)
- XIII. POSSESSION CERTIFICATE — declared: already been obtained (8 Nov 2023)
- XIV. NON ENCUMBRANCE CERTIFICATE — declared: already been obtained (10 Sept 2024)
- XV. LETTER OF INTENT — declared: already been obtained (8 Nov 2023)
On file with HARERA · 53 files
On file with HARERA (53)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
4 filesFloor plans
9 filesServices
Service plans
1 fileApprovals and clearances
DTCP licence
2 filesOther NOCs and clearances
4 filesLand records
Land records
2 filesSales papers
Allotment and sale agreements
6 filesMoney
Accounts and finance
8 filesTimeline and progress
Construction schedule
1 fileProgress and photographs
1 fileThe promoter’s papers
Declarations and affidavits
5 filesCompany papers
2 filesOther filings
Other filings
4 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared The land for the project was allotted by the Haryana Shehri Vikas Pradhikaran (HSVP) to the Promoter through an e-auction process on a freehold basis, vide Allotment Letter dated 29.09.2023 ( Vide Memo No. ZO002/EO018/UE029/GALOT/0000001157) for the development of group housing tower thereon.. We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Gurugram bench · submitted 4 Nov 2024 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
4 filesFloor plans
9 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (53 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3057 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Mnb Build Fab
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.