Skip to content

ANANTAVILASA

by Mnb Build Fab · Sector 56, Gurugram

Not on our price list yet

Possession 31 Dec 2030 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 56, Gurugram5.8 km from Sohna Elevated Corridor (NH-248A), in a straight line
Carpet area
1,701–1,761 sq ft
In m²about 158–164 m², as declared
Registered by
MNB BUILD FAB PRIVATE LIMITEDthe company that filed it, for Mnb Build Fab
Timeline
  1. 10 Oct 2024Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2030Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

72homes, 1,701 to 1,761 sq ft of carpet area
  • 1,500–2,000 sq ft1,701–1,761 sq ft72

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 2 rows of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside3,439 m² in all, by use
  • Apartment buildings1,376 m² · 40%
  • Pavements1,189 m² · 35%
  • Green belts516 m² · 15%
  • Other uses258 m² · 8%
  • Sewage and waste treatment91 m² · 3%
  • Electricity sub-station9 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningAs per ISI specifications
  • KitchenModular kitchen
  • WardrobesAs per ISI specifications
  • FloorsGood quality italian stone
  • WallsPlastic paint
  • BathroomsCP fittings
  • WindowsUPVC
  • Main doorFlush doors 30MM thick with 1MM sunmica

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 56, GurugramSector 56, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)5.8 km
  • Delhi–Gurugram–SNB RRTS6.2 km
  • Dwarka ExpresswayOpen, 17 Aug 202510.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is ANANTAVILASA registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/899/631/2025/02. Valid to 31 Dec 2030.

The source ↗
What is the possession timeline for ANANTAVILASA?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2030. Its registration runs to 31 Dec 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ANANTAVILASA?From the records · Map pin and road lines, read 6 Sep 2026

ANANTAVILASA is in Sector 56, Gurugram; the site address declared to HARERA is Gh26a, Sector 56, Urban Estate-Ii, Gurugram, Haryana. In a straight line it is about 5.8 km from Sohna Elevated Corridor (NH-248A), 6.2 km from Delhi–Gurugram–SNB RRTS and 10.8 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ANANTAVILASA?From the records · HARERA, read 4 Nov 2026

ANANTAVILASA is a Mnb Build Fab project, registered by its company MNB BUILD FAB PRIVATE LIMITED.

The source ↗Mnb Build Fab's projects and court record

The records

What the registers hold for ANANTAVILASA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/899/631/2025/02: Registered. Valid to 31 Dec 2030.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 10 Oct 2024, building plans 10 Oct 2024.Declared to HARERA, read 29 Oct 2026
The court record of Mnb Build Fab’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 53 HARERA files, with the dates we read them
Registration no.
GGM/899/631/2025/02
Registration valid till
31 Dec 2030
Declared possession
31 Dec 2030

Declared by the promoter to HARERA

Land area
3438.75 (Sqr/mtrs)
FAR
4.12 proposed of 4.12 permissible
licence
The land for the project was allotted by the Haryana Shehri Vikas Pradhikaran (HSVP) to the Promoter through an e-auction process on a freehold basis, vide Allotment Letter dated 29.09.2023 ( Vide Memo No. ZO002/EO018/UE029/GALOT/0000001157) for the development of group housing tower thereon.
Estimated project cost
₹263.44 crore
Cost of land
₹67.99 crore
Layout plan, declared approved (field 5a)
10 Oct 2024
Building plans, declared approved
10 Oct 2024
Construction to start
1 Jan 2025
Completion declared for
31 Dec 2030
Declared inventory · 7 types

Declared inventory

  • Apartment/Shops/Other Buildings · 14 units · 162.56 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 15 units · 163.57 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 15 units · 162.56 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 14 units · 163.06 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 14 units · 158.05 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 162.56 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 163.06 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 15

Statutory approvals, as declared

  • I. ASSURANCE FOR SEWERAGE CONNECTION FOR DISCHARGE OF 50 KLD SURPLUS DOMESTIC TREATED EFFLUENT. — declared: already been obtained (22 Jul 2024)
  • II. ASSURANCE FOR STORM WATER CONNECTION OF PROPOSED GROUP HOUSING PROJECT. — declared: already been obtained (22 Jul 2024)
  • III. NO OBJECTION CERTIFICATE FOR HIGHT CLEARANCE — declared: already been obtained (20 Aug 2024)
  • IV. NO OBJECTION CERTIFICATE FOR FIRE — declared: already been obtained (24 Feb 2024)
  • V. ENVIRONMENT CLEARANCE — declared: already been obtained (29 Oct 2024)
  • VI. MINING PERMISSION — declared: already been obtained (5 Nov 2024)
  • VII. TREE CUTTING PERMISSION — declared: already been obtained (19 Dec 2023)
  • VIII. GREEN RATING FOR INTEGRATED HABITAT ASSESSMENT — declared: already been obtained (5 Aug 2024)
  • IX. BUILDING PLAN — declared: already been obtained (10 Oct 2024)
  • X. ASSURANCE FOR WATER SUPPLY 5 KLD FOR DOMESTIC PURPOSE. — declared: already been obtained (23 Jul 2024)
  • XI. ASSURANCE FOR SUPPLY OF 30 KLD STP TREATED WATER FOR CONSTRUCTION OF GROUP HOUSING PROJECT. — declared: already been obtained (22 Jul 2024)
  • XII. SITE PLAN — declared: already been obtained (10 Oct 2024)
  • XIII. POSSESSION CERTIFICATE — declared: already been obtained (8 Nov 2023)
  • XIV. NON ENCUMBRANCE CERTIFICATE — declared: already been obtained (10 Sept 2024)
  • XV. LETTER OF INTENT — declared: already been obtained (8 Nov 2023)
On file with HARERA · 53 files

On file with HARERA (53)

Plans

Site plan

1 file
Approved Site Plan22 Oct 2024

Layout plan

1 file
Latest Layout Plan22 Oct 2024

Zoning plan

1 file
Zoning Plan21 Oct 2024

Demarcation plan

1 file
Demarcation Plan21 Oct 2024

Building plans

4 files
Elevation Plan 'C' and 'D'15 Jan 2025Elevation Plan 'A' and 'B'15 Jan 2025Section Plan15 Jan 2025Approved Building Plans, Full Set21 Oct 2024

Floor plans

9 files
Basement 3 -Plan15 Jan 20254th Floor to 14th Floor15 Jan 2025Basement 1 -Plan15 Jan 2025

Services

Service plans

1 file
Service Plans on the Layout22 Oct 2024

Approvals and clearances

DTCP licence

2 files
Letter of Intent by HSVP15 Jan 2025Licence Copy with Land Schedule1 Sept 2024

Other NOCs and clearances

4 files
HSVP Permission for Third Party Rights Creation15 Jan 2025Envirment Clearence1 Nov 2024Permission for Felling of Trees1 Sept 2024Airports Authority of India - Height Clearance1 Sept 2024

Land records

Land records

2 files
NEC - Tehsildar15 Jan 2025Title Search Report - Latest15 Jan 2025

Sales papers

Allotment and sale agreements

6 files
Allottee- Agreement for Sale15 Jan 2025Allottee- Allotment Letter15 Jan 2025Possession Certificate by HSVP15 Jan 2025

Money

Accounts and finance

8 files
Allotee -Payment Receipt15 Jan 2025Net Worth Certificate15 Jan 2025Non-Default Certificate from a CA15 Jan 2025

Timeline and progress

Construction schedule

1 file
PERT Chart15 Jan 2025

Progress and photographs

1 file
Statement of Quarterly Estimated Expend15 Jan 2025

The promoter’s papers

Declarations and affidavits

5 files
Affidavit 4(2)(L)(D)15 Jan 2025Bank Undertaking15 Jan 2025Affidavit Cum Declaration for Paid EDC IDC15 Jan 2025

Company papers

2 files
Certificate of Incorporation - Mnb Build Fab15 Jan 2025Coi, Dissolution and Conversion Certificate22 Oct 2024

Other filings

Other filings

4 files
Clearification15 Jan 2025Griha Green Rating 4 Star15 Jan 2025Various Approvals from HSVP15 Jan 2025Stair Case Area15 Jan 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared The land for the project was allotted by the Haryana Shehri Vikas Pradhikaran (HSVP) to the Promoter through an e-auction process on a freehold basis, vide Allotment Letter dated 29.09.2023 ( Vide Memo No. ZO002/EO018/UE029/GALOT/0000001157) for the development of group housing tower thereon.. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 4 Nov 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan22 Oct 2024

Layout plan

1 file
Latest Layout Plan22 Oct 2024

Building plans

4 files
Elevation Plan 'C' and 'D'15 Jan 2025Elevation Plan 'A' and 'B'15 Jan 2025Section Plan15 Jan 2025Approved Building Plans, Full Set21 Oct 2024

Floor plans

9 files
Basement 3 -Plan15 Jan 20254th Floor to 14th Floor15 Jan 2025Basement 1 -Plan15 Jan 20252nd Floor15 Jan 20251st Floor15 Jan 2025Ground Floor Plan15 Jan 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (53 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3057 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Mnb Build Fab

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.