Skip to content

ASPEN ONE

by Whiteland Corporation · Sector 76, Gurugram-Manesar

Not on our price list yet

Possession 30 Jun 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 76, Gurugram-Manesar0.8 km from Delhi–Gurugram–SNB RRTS, in a straight linePrices and what changed
Carpet area
1,256–1,430 sq ft
In m²about 117–133 m², as declared
Registered by
WHITELAND CORPORATION PVT LTDthe company that filed it, for Whiteland Corporation
Timeline
  1. 16 May 2024Building plans approveddeclared to HARERA, read 5 Nov 2026
  2. 30 Jun 2031Possession, as declareddeclared to HARERA, read 5 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

252homes, 1,256 to 1,430 sq ft of carpet area
  • 1,000–1,500 sq ft1,256–1,430 sq ft252

Carpet area per home, as declared to HARERA (read 5 Nov 2026), in sq ft. Left out: 48 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.316 acres in all, by use
  • Parks and playgrounds0.732 acres · 32%
  • Other uses0.58 acres · 25%
  • Pavements0.515 acres · 22%
  • Apartment buildings0.298 acres · 13%
  • Roads0.191 acres · 8%

The land-use table of the HARERA application, declared to HARERA, read 5 Nov 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningYes
  • KitchenSink & counter
  • LiftsYes
  • FloorsYes
  • WallsOBD, emulsion
  • BathroomsYes
  • WindowsYes
  • Main doorYes

The developer’s specifications in the HARERA application, declared to HARERA, read 5 Nov 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 76, Gurugram-ManesarThe licensed land, as mapped by DTCP (read 5 Nov 2026) · tcpharyana.gov.inOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS0.8 km
  • Dwarka ExpresswayOpen, 17 Aug 20251.3 km
  • Sohna Elevated Corridor (NH-248A)5.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 12 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 3
  • Registered, no OC or CC yet: 9

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is ASPEN ONE registered with HARERA?From the records · HARERA, read 5 Nov 2026

HARERA lists it as GGM/827/559/2024/54. Valid to 30 Jun 2031.

The source ↗
What is the possession timeline for ASPEN ONE?From the records · HARERA, read 5 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2031. Its registration runs to 30 Jun 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ASPEN ONE?From the records · Map pin and road lines, read 6 Sep 2026

ASPEN ONE is in Sector 76, Gurugram-Manesar; the site address declared to HARERA is Darbaripur Road Sector-76. In a straight line it is about 0.8 km from Delhi–Gurugram–SNB RRTS, 1.3 km from Dwarka Expressway and 5.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ASPEN ONE?From the records · HARERA, read 5 Nov 2026

ASPEN ONE is a Whiteland Corporation project, registered by its company WHITELAND CORPORATION PVT LTD.

The source ↗Whiteland Corporation's projects and court record

The records

What the registers hold for ASPEN ONE: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/827/559/2024/54: Registered. Valid to 30 Jun 2031.HARERA, read 5 Nov 2026 · See it on HARERA ↗
  • Land licence 172 OF 2023 is on the DTCP register, valid to 24 Aug 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 16 May 2024.Declared to HARERA, read 5 Nov 2026
The court record of Whiteland Corporation’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 42 HARERA files, with the dates we read them
Registration no.
GGM/827/559/2024/54
Registration valid till
30 Jun 2031
Declared possession
30 Jun 2031

Declared by the promoter to HARERA

Land area
2.3159 (Acre) (9,372.11 sq m)
FAR
2.58 proposed of 2.59 permissible
licence
172 of 2023(25-08-2023)
Estimated project cost
₹606.52 crore
Cost of land
₹27.70 crore
Building plans, declared approved
16 May 2024
Construction to start
1 Jul 2024
Completion declared for
30 Jun 2031
Declared inventory · 5 types

Declared inventory

  • Apartment/Shops/Other Buildings · 42 units · 127.19 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 119 units · 116.79 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 8 units · 116.68 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 83 units · 132.84 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 48 units · 18.2 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (25 Aug 2023)
  • II. LOI — declared: already been obtained (3 Aug 2023)
  • III. BUILDING PLAN — declared: already been obtained (16 May 2024)
  • IV. AAI — declared: already been obtained (19 Mar 2024)
  • V. POWERLOAD ASSURANCE — declared: already been obtained (22 Feb 2024)
  • VI. SEWAGE ASSURANCE — declared: already been obtained (11 Dec 2023)
  • VII. STORM ASSURANCE — declared: already been obtained (12 Dec 2023)
  • VIII. WATER ASSURANCE — declared: already been obtained (15 Dec 2023)
  • IX. ZONING — declared: already been obtained (25 Aug 2023)
  • X. FOREST NOC — declared: already been obtained (7 Sept 2022)
On file with HARERA · 42 files

On file with HARERA (42)

Plans

Site plan

1 file
Approved Site Plan6 Jun 2024

Layout plan

2 files
Latest Layout Plan6 Jun 2024Demarcation Superimosed on the Layout Plan6 Jun 2024

Zoning plan

1 file
Zoning Plan5 Dec 2023

Demarcation plan

1 file
Demarcation Plan18 Dec 2023

Building plans

7 files
Section Elevation & Terrace6 Jun 2024Elevation Section Tower-106 Jun 2024Approved Building Plans, Full Set6 Jun 2024

Floor plans

10 files
Ground & Tpic. EWS6 Jun 2024Floor Plan Area Cal. Tower-116 Jun 2024Ground & Tpic. Tower-116 Jun 2024

Services

Sewerage and drainage

2 files
Assurance for Sewerage Connection6 Jun 2024Assurance Storm Water6 Jun 2024

Water supply

1 file
Assurance for Water Supply6 Jun 2024

Electricity

1 file
Assurance Electrical Load6 Jun 2024

Service plans

1 file
Service Plans on the Layout6 Jun 2024

Approvals and clearances

DTCP licence

3 files
LC IV6 Jun 2024LOI6 Jun 2024Licence Copy with Land Schedule5 Dec 2023

Other NOCs and clearances

2 files
Airport Height Clearance6 Jun 2024Forest NOC6 Jun 2024

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration5 Dec 2023

Sales papers

Payment plan

1 file
Payment Plan6 Jun 2024

Money

Accounts and finance

6 files
Cash Flow Statement6 Jun 2024CA Net Worth Certificate6 Jun 2024CA Certificate Inventory6 Jun 2024

The promoter’s papers

Declarations and affidavits

2 files
The Promoter’s Declaration on Affidavit6 Jun 2024Bank Undertaking6 Jun 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

172 OF 2023 · Whiteland Corporation Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 24 Aug 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 21 Dec 2023 · read 5 Nov 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 5 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

172 OF 2023: 4 parcels, 2.316 acres in all, in Kherki Dola (hadbast 161), tehsil Manesar.

The licence register prints the same licensed area, 2.3159 acres.

  • 43//15/17 kanal 7 marla
  • 44//10/23 kanal
  • 44//11/16 kanal 18 marla 5 sarsai
  • 44//20/21 kanal 5 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Kherki Dola (hadbast 161), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 43//15/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type. See the collector rates for Sector 76.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan6 Jun 2024

Layout plan

2 files
Latest Layout Plan6 Jun 2024Demarcation Superimosed on the Layout Plan6 Jun 2024

Building plans

7 files
Section Elevation & Terrace6 Jun 2024Elevation Section Tower-106 Jun 2024Approved Building Plans, Full Set6 Jun 2024Elevation Section Tower-116 Jun 2024Section Elevation, Terrace EWS6 Jun 2024Elevation Tower-116 Jun 2024Elevation Tower-106 Jun 2024

Floor plans

10 files
Ground & Tpic. EWS6 Jun 2024Floor Plan Area Cal. Tower-116 Jun 2024Ground & Tpic. Tower-116 Jun 2024Floor Plan School6 Jun 2024Basement 1 Plan6 Jun 2024Floor Plan and Area Cal. Tower-106 Jun 2024

Payment plan

1 file
Payment Plan6 Jun 2024

source: https://haryanarera.gov.in/view_project/project_preview_open/2604 · read 5 Nov 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Whiteland Corporation

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.