Possession 30 Sep 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 76, Gurugram0.9 km from Delhi–Gurugram–SNB RRTS, in a straight line
Registered
23 Dec 2019
Registered by
SUNCITY PROJECTS PVT. LTD.the company that filed it, for Suncity Projects
Timeline
  1. 30 Aug 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 23 Dec 2019Registered with HARERAHARERA, read 4 Nov 2026
  3. 30 Sep 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside40,469 m² in all, by use
  • Other usesas the form names them: Sector, Creche10,250 m² · 25%
  • Parking7,323 m² · 18%
  • Roads6,714 m² · 17%
  • Apartment buildings6,557 m² · 16%
  • Parks and playgrounds3,081 m² · 8%
  • Green belts2,720 m² · 7%
  • Pavements1,691 m² · 4%
  • Shops and offices926 m² · 2%
  • Sewage and waste treatment692 m² · 2%
  • Electricity sub-station326 m² · under 1%
  • Club house190 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenFlooring /wall -tiles/IPS, tiles upto 2 FEET high above stone/RCC counter and OBD/color WASH in balance area
  • LiftsStandard make
  • FloorsTiles/IPS
  • WallsOBD/color WASH
  • BathroomsSingle bowl steel sink & CP / PVC / PTMT fittings
  • WindowsUPVC/ hardwood/MS Z-section/fibre/composite/aluminium/frame windows ETC
  • Main doorFlush doors
  • Electrical fittingsISI marked products for wiring,switches and circuits

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 76, GurugramSector 76, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS0.9 km
  • Dwarka ExpresswayOpen, 17 Aug 20251.6 km
  • Sohna Elevated Corridor (NH-248A)5.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Suncity Avenue 76 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/384/116/2019/78, registered on 23 Dec 2019. The register’s record shows an end date of 30 Sep 2024. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for Suncity Avenue 76?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2024. Its registration runs to 30 Sep 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Suncity Avenue 76?From the records · Map pin and road lines, read 6 Sep 2026

Suncity Avenue 76 is in Sector 76, Gurugram; the site address declared to HARERA is Sector 76, Village Kherki Daula. In a straight line it is about 0.9 km from Delhi–Gurugram–SNB RRTS, 1.6 km from Dwarka Expressway and 5.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Suncity Avenue 76?From the records · HARERA, read 4 Nov 2026

Suncity Avenue 76 is a Suncity Projects project, registered by its company SUNCITY PROJECTS PVT. LTD..

The source ↗Suncity Projects's projects and court record

The records

What the registers hold for Suncity Avenue 76: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/384/116/2019/78: Registration lapsed. The register’s record shows an end date of 30 Sep 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 34 OF 2018 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 30 May 2023.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 30 Aug 2019, building plans 30 Aug 2019.Declared to HARERA, read 29 Oct 2026
The court record of Suncity Projects’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 30 Sep 2024. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 34 OF 2018 validity ended

    Named in this project’s application. Valid to 30 May 2023. The register links a completion certificate (LC-IX), dated 27 May 2024, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 18 HARERA files, with the dates we read them
Registration no.
GGM/384/116/2019/78
Registration date
23 Dec 2019
Registration valid till
30 Sept 2024
Declared possession
30 Sept 2024

Declared by the promoter to HARERA

Land area
10 (Acre) (40,468.56 sq m)
FAR
2.37 proposed of 2.37 permissible
licence
License No. 34 of 2018 dated 31.05.2018
Estimated project cost
₹251.34 crore
Cost of land
₹67.00 crore
Layout plan, declared approved (field 5a)
30 Aug 2019
Building plans, declared approved
30 Aug 2019
Construction to start
1 Oct 2019
Completion declared for
30 Sept 2024
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 1,464 units · 83,656.5 sq m carpet · 12 towers
  • Apartment/Shops/Other Buildings · 109 units · 2,696.15 sq m carpet · 6 towers
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. TRANSFER OF LICENSE & CHANGE OF DEVELOPER IN THE NAME OF SUNCITY PROJECTS PVT. LTD. — declared: already been obtained (21 Jun 2019)
  • II. ENVIRONMENT CLEARANCE — declared: already been obtained (16 Jul 2019)
  • III. BUILDING PLAN APPROVAL — declared: already been obtained (30 Aug 2019)
  • IV. FOREST NOC — declared: already been obtained (18 Jan 2018)
  • V. ARAVALI NOC — declared: already been obtained (29 Mar 2019)
On file with HARERA · 18 files

On file with HARERA (18)

Plans

Site plan

1 file
Approved Site Plan24 Jun 2019

Layout plan

1 file
Latest Layout Plan2 Sept 2019

Zoning plan

1 file
Zoning Plan24 Jun 2019

Building plans

1 file
Approved Building Plans, Full Set2 Sept 2019

Services

Sewerage and drainage

2 files
Storm19 Oct 2019Sewer15 Oct 2019

Water supply

2 files
Water Supply19 Oct 2019Flushing Water15 Oct 2019

Roads

1 file
Road Layout15 Oct 2019

Service plans

1 file
Service Estimate19 Oct 2019

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule24 Jun 2019

Fire safety

1 file
Fire Fighting15 Oct 2019

Other NOCs and clearances

2 files
Forest NOC24 Jun 2019Aravali NOC24 Jun 2019

Money

Accounts and finance

2 files
C A Certificate for Estimated Cost2 Sept 2019Non-Default Certificate from a CA27 Jun 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit25 Jun 2019

Company papers

1 file
Board Resolution –Authorization Letter24 Jun 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

34 OF 2018 · Suncity Projects Pvt. Ltd · GURGAON-MANESAR

Licence valid to 30 May 2023

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 2 Sept 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

34 OF 2018: 13 parcels, 10 acres in all, in Kherki Dola (hadbast 161), tehsil Manesar.

The licence register prints the same licensed area, 10 acres.

  • 45//1/21 kanal
  • 45//10/16 kanal 7 marla
  • 45//118 kanal
  • 44//128 kanal
Show the other 9 parcels
  • 44//138 kanal
  • 44//14/27 kanal 2 marla
  • 44//15/1/22 kanal 15 marla
  • 44//15/22 kanal 8 marla
  • 44//17/17 kanal 8 marla
  • 44//188 kanal
  • 44//19/15 kanal
  • 44//228 kanal
  • 44//238 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Kherki Dola (hadbast 161), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 45//1/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,400 per sq ft

this sector, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “Suncity Avenue 76”, by M/s Suncity Projects Pvt. Ltd, code Gurgaon-1119-001237, approved 2019.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan24 Jun 2019

Layout plan

1 file
Latest Layout Plan2 Sept 2019

Building plans

1 file
Approved Building Plans, Full Set2 Sept 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (18 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/710 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Suncity Projects

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.