Suncity Avenue 76
by Suncity Projects · Sector 76, Gurugram
Not on our price list yet
Possession 30 Sep 2024 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 76, Gurugram0.9 km from Delhi–Gurugram–SNB RRTS, in a straight line
- Registered by
- SUNCITY PROJECTS PVT. LTD.the company that filed it, for Suncity Projects
- 30 Aug 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 23 Dec 2019Registered with HARERAHARERA, read 4 Nov 2026
- 30 Sep 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Other usesas the form names them: Sector, Creche10,250 m² · 25%
- Parking7,323 m² · 18%
- Roads6,714 m² · 17%
- Apartment buildings6,557 m² · 16%
- Parks and playgrounds3,081 m² · 8%
- Green belts2,720 m² · 7%
- Pavements1,691 m² · 4%
- Shops and offices926 m² · 2%
- Sewage and waste treatment692 m² · 2%
- Electricity sub-station326 m² · under 1%
- Club house190 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenFlooring /wall -tiles/IPS, tiles upto 2 FEET high above stone/RCC counter and OBD/color WASH in balance area
- LiftsStandard make
- FloorsTiles/IPS
- WallsOBD/color WASH
- BathroomsSingle bowl steel sink & CP / PVC / PTMT fittings
- WindowsUPVC/ hardwood/MS Z-section/fibre/composite/aluminium/frame windows ETC
- Main doorFlush doors
- Electrical fittingsISI marked products for wiring,switches and circuits
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Delhi–Gurugram–SNB RRTS0.9 km
- Dwarka ExpresswayOpen, 17 Aug 20251.6 km
- Sohna Elevated Corridor (NH-248A)5.5 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 1
- Other register states: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Whiteland Corporation | Same sector | — | — | 30 Jun 2031 | |
| Whiteland Corporation | Same sector | — | ₹14,000/sq ft | 30 Jun 2027 | |
No photo of the project on file yet | Pyramid Infratech | Same sector | — | — | 24 Feb 2024 |
| Whiteland Corporation | Same sector | — | — | 31 Dec 2026 | |
| Whiteland Corporation | Same sector | — | — | 31 Dec 2026 | |
TRL RESIDENTIAL PLOTTED COLONYNo photo on file yet | Trl Riceland | Same sector | — | — | 21 Oct 2022 |
| Whiteland Corporation | Same sector | Under construction | ₹15,500/sq ft | 31 Dec 2030 | |
SEASONSNo photo on file yet | Keystone World | 1.1 kmto its sector’s point | — | — | 30 Sep 2029 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is Suncity Avenue 76 registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/384/116/2019/78, registered on 23 Dec 2019. The register’s record shows an end date of 30 Sep 2024. The register shows it as: Registration lapsed.
The source ↗What is the possession timeline for Suncity Avenue 76?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 30 Sep 2024. Its registration runs to 30 Sep 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Suncity Avenue 76?From the records · Map pin and road lines, read 6 Sep 2026
Suncity Avenue 76 is in Sector 76, Gurugram; the site address declared to HARERA is Sector 76, Village Kherki Daula. In a straight line it is about 0.9 km from Delhi–Gurugram–SNB RRTS, 1.6 km from Dwarka Expressway and 5.5 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Suncity Avenue 76?From the records · HARERA, read 4 Nov 2026
Suncity Avenue 76 is a Suncity Projects project, registered by its company SUNCITY PROJECTS PVT. LTD..
The source ↗Suncity Projects's projects and court recordThe records
What the registers hold for Suncity Avenue 76: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/384/116/2019/78: Registration lapsed. The register’s record shows an end date of 30 Sep 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 34 OF 2018 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 30 May 2023.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 30 Aug 2019, building plans 30 Aug 2019.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Amber flag: Registration lapsed
The register’s record shows an end date of 30 Sep 2024. HARERA Gurugram, read 4 Nov 2026. Source
Amber flag: Licence 34 OF 2018 validity ended
Named in this project’s application. Valid to 30 May 2023. The register links a completion certificate (LC-IX), dated 27 May 2024, against this licence. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 18 HARERA files, with the dates we read them
- Registration no.
- GGM/384/116/2019/78
- Registration date
- 23 Dec 2019
- Registration valid till
- 30 Sept 2024
- Declared possession
- 30 Sept 2024
Declared by the promoter to HARERA
- Land area
- 10 (Acre) (40,468.56 sq m)
- FAR
- 2.37 proposed of 2.37 permissible
- licence
- License No. 34 of 2018 dated 31.05.2018
- Estimated project cost
- ₹251.34 crore
- Cost of land
- ₹67.00 crore
- Layout plan, declared approved (field 5a)
- 30 Aug 2019
- Building plans, declared approved
- 30 Aug 2019
- Construction to start
- 1 Oct 2019
- Completion declared for
- 30 Sept 2024
Declared inventory · 2 types
Declared inventory
- Apartment/Shops/Other Buildings · 1,464 units · 83,656.5 sq m carpet · 12 towers
- Apartment/Shops/Other Buildings · 109 units · 2,696.15 sq m carpet · 6 towers
Statutory approvals, as declared · 5
Statutory approvals, as declared
- I. TRANSFER OF LICENSE & CHANGE OF DEVELOPER IN THE NAME OF SUNCITY PROJECTS PVT. LTD. — declared: already been obtained (21 Jun 2019)
- II. ENVIRONMENT CLEARANCE — declared: already been obtained (16 Jul 2019)
- III. BUILDING PLAN APPROVAL — declared: already been obtained (30 Aug 2019)
- IV. FOREST NOC — declared: already been obtained (18 Jan 2018)
- V. ARAVALI NOC — declared: already been obtained (29 Mar 2019)
On file with HARERA · 18 files
On file with HARERA (18)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileBuilding plans
1 fileServices
Sewerage and drainage
2 filesWater supply
2 filesRoads
1 fileService plans
1 fileApprovals and clearances
DTCP licence
1 fileFire safety
1 fileOther NOCs and clearances
2 filesMoney
Accounts and finance
2 filesThe promoter’s papers
Declarations and affidavits
1 fileCompany papers
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
34 OF 2018 · Suncity Projects Pvt. Ltd · GURGAON-MANESAR
Licence valid to 30 May 2023
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 2 Sept 2019 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
34 OF 2018: 13 parcels, 10 acres in all, in Kherki Dola (hadbast 161), tehsil Manesar.
The licence register prints the same licensed area, 10 acres.
- 45//1/21 kanal
- 45//10/16 kanal 7 marla
- 45//118 kanal
- 44//128 kanal
Show the other 9 parcels
- 44//138 kanal
- 44//14/27 kanal 2 marla
- 44//15/1/22 kanal 15 marla
- 44//15/22 kanal 8 marla
- 44//17/17 kanal 8 marla
- 44//188 kanal
- 44//19/15 kanal
- 44//228 kanal
- 44//238 kanal
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Kherki Dola (hadbast 161), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 45//1/2.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹6,400 per sq ft
this sector, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Lenders that list this project
PNB Housing Finance’s approved-projects list carries “Suncity Avenue 76”, by M/s Suncity Projects Pvt. Ltd, code Gurgaon-1119-001237, approved 2019.
PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗
A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (18 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/710 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Suncity Projects
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.
