Pyramid Pride

by Pyramid Infratech · Sector 76, Gurugram

Not on our price list yet

Possession 24 Feb 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 76, Gurugram0.9 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
273–599 sq ft
In m²about 25–56 m², as declared
Registered
24 May 2019
Registered by
PYRAMID INFRATECH PVT. LTD.the company that filed it, for Pyramid Infratech
Timeline
  1. 8 May 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 24 May 2019Registered with HARERAHARERA, read 4 Nov 2026
  3. 24 Feb 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

732homes, 273 to 599 sq ft of carpet area
  • Under 1,000 sq ft273–599 sq ft732

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 48 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside20,234 m² in all, by use
  • Parking9,578 m² · 47%
  • Parks and playgrounds4,055 m² · 20%
  • Apartment buildings2,816 m² · 14%
  • Roads2,697 m² · 13%
  • Other usesas the form names them: Area, Community, Rain924 m² · 5%
  • Electricity sub-station147 m² · under 1%
  • Sewage and waste treatment17 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenStone counter with tile
  • FloorsI PS flooring
  • WallsOBD paint
  • BathroomsPVC
  • WindowsGlass panels
  • Main doorSKIN door
  • Water storageOver HEAD tank

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 76, GurugramSector 76, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS0.9 km
  • Dwarka ExpresswayOpen, 17 Aug 20251.6 km
  • Sohna Elevated Corridor (NH-248A)5.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 10 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 9
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Pyramid Pride registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/332/64/2019/26, registered on 24 May 2019. Ended 24 Feb 2024. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Pyramid Pride?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 24 Feb 2024. Its registration runs to 24 Feb 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Pyramid Pride?From the records · Map pin and road lines, read 6 Sep 2026

Pyramid Pride is in Sector 76, Gurugram; the site address declared to HARERA is Sector-76, Gurugram. In a straight line it is about 0.9 km from Delhi–Gurugram–SNB RRTS, 1.6 km from Dwarka Expressway and 5.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Pyramid Pride?From the records · HARERA, read 4 Nov 2026

Pyramid Pride is a Pyramid Infratech project, registered by its company PYRAMID INFRATECH PVT. LTD..

The source ↗Pyramid Infratech's projects and court record

The records

What the registers hold for Pyramid Pride: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/332/64/2019/26: Registration expired. Ended 24 Feb 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 26 OF 2019 is on the DTCP register: Licence ends soon; the register prints its validity to 24 Feb 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 8 May 2019, building plans 8 May 2019.Declared to HARERA, read 29 Oct 2026
The court record of Pyramid Infratech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 24 Feb 2024. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 26 OF 2019 ends soon

    Named in this project’s application. Valid to 24 Feb 2027. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 34 HARERA files, with the dates we read them
Registration no.
GGM/332/64/2019/26
Registration date
24 May 2019
Registration valid till
24 Feb 2024
Declared possession
24 Feb 2024

Declared by the promoter to HARERA

Land area
5 (Acre) (20,234.28 sq m)
FAR
2.25 proposed of 2.25 permissible
licence
26 OF 2019
Estimated project cost
₹155.65 crore
Cost of land
₹61.41 crore
Layout plan, declared approved (field 5a)
8 May 2019
Building plans, declared approved
8 May 2019
Construction to start
17 Jun 2019
Completion declared for
24 Feb 2024
Declared inventory · 12 types

Declared inventory — 12 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 354 units · 54.919 sq m carpet · 7 towers · one flat
  • Apartment/Shops/Other Buildings · 184 units · 53.933 sq m carpet · 7 towers · one flat
  • Apartment/Shops/Other Buildings · 92 units · 53.723 sq m carpet · 7 towers · one flat
  • Apartment/Shops/Other Buildings · 92 units · 55.605 sq m carpet · 7 towers · one flat
  • Apartment/Shops/Other Buildings · 12 units · 22.265 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 25.32 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 8 units · 28.37 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 2 units · 16.76 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. LICENSE APPROVAL — declared: already been obtained (25 Feb 2019)
  • II. ZONING PLAN APPROVAL — declared: already been obtained (27 Feb 2019)
  • III. BUILDING PLAN / SITE PLAN APPROVAL — declared: already been obtained (8 May 2019)
  • IV. ENVIRONMENT CLEARANCE APPROVAL BASED ON LATEST APPROVED BUILDING PLAN — declared: applied for but yet to receive
On file with HARERA · 34 files

On file with HARERA (34)

Plans

Site plan

2 files
Approved Site Plan12 May 2019Approved Site Plan12 May 2019

Layout plan

1 file
Latest Layout Plan12 May 2019

Zoning plan

1 file
Zoning Plan12 May 2019

Demarcation plan

1 file
Demarcation Plan12 May 2019

Building plans

1 file
Approved Building Plans, Full Set12 May 2019

Services

Service plans

1 file
Service Plans on the Layout12 May 2019

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded4 Jun 2026

DTCP licence

3 files
LOI12 May 2019LC IV LC IV A12 May 2019Licence Copy with Land Schedule12 May 2019

Environment clearance

1 file
EC Acknowledgement12 May 2019

Other NOCs and clearances

7 files
NOC DHBVN12 May 2019NOC Height Clearence Acknowledgement12 May 2019NOC Forest12 May 2019

Land records

Land records

5 files
Revenue Record Entry of Licence and Collaboration12 May 2019Collaboration Agreements12 May 2019Land Ownership Report12 May 2019

Money

Accounts and finance

4 files
Non-Default Certificate from a CA12 May 2019Cash Flow Statement12 May 2019CA Certificate on the Application’s Figures12 May 2019Project Report12 May 2019

The promoter’s papers

Declarations and affidavits

4 files
Affidavit of Promoter with the Bank of Master Account12 May 2019Tree Cutting Affidavit12 May 2019Bank Undertaking of Master Account12 May 2019The Promoter’s Declaration on Affidavit12 May 2019

Company papers

1 file
MOA & AOA12 May 2019

HARERA’s orders

HARERA’s orders

1 file
Revised Registration Certificate16 Jun 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

26 OF 2019 · Pyramid Infratech Pvt Ltd · GURGAON-MANESAR

Licence valid to 24 Feb 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 12 May 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

26 OF 2019: 10 parcels, 5 acres in all, in Kherki Dola (hadbast 161), tehsil Manesar.

The licence register prints the same licensed area, 5 acres.

  • 43//12/16 kanal 8 marla
  • 43//13/17 kanal 18 marla
  • 43//13/22 marla
  • 43//14 min7 kanal 13 marla
Show the other 6 parcels
  • 43//188 kanal
  • 43//22/13 kanal 8 marla
  • 43//23/13 kanal 11 marla
  • 43//8/2/21 kanal 4 marla
  • 43//9/24 marla
  • 43//12/21 kanal 12 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Kherki Dola (hadbast 161), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 43//12/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,400 per sq ft

this sector, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Approved Site Plan12 May 2019Approved Site Plan12 May 2019

Layout plan

1 file
Latest Layout Plan12 May 2019

Building plans

1 file
Approved Building Plans, Full Set12 May 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (34 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/630 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pyramid Infratech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.