Pyramid Pride
by Pyramid Infratech · Sector 76, Gurugram
Not on our price list yet
Possession 24 Feb 2024 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 76, Gurugram0.9 km from Delhi–Gurugram–SNB RRTS, in a straight line
- Registered by
- PYRAMID INFRATECH PVT. LTD.the company that filed it, for Pyramid Infratech
- 8 May 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 24 May 2019Registered with HARERAHARERA, read 4 Nov 2026
- 24 Feb 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft273–599 sq ft732
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 48 units under 25 m², because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Parking9,578 m² · 47%
- Parks and playgrounds4,055 m² · 20%
- Apartment buildings2,816 m² · 14%
- Roads2,697 m² · 13%
- Other usesas the form names them: Area, Community, Rain924 m² · 5%
- Electricity sub-station147 m² · under 1%
- Sewage and waste treatment17 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenStone counter with tile
- FloorsI PS flooring
- WallsOBD paint
- BathroomsPVC
- WindowsGlass panels
- Main doorSKIN door
- Water storageOver HEAD tank
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Delhi–Gurugram–SNB RRTS0.9 km
- Dwarka ExpresswayOpen, 17 Aug 20251.6 km
- Sohna Elevated Corridor (NH-248A)5.5 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 9
- Other register states: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Whiteland Corporation | Same sector | — | — | 30 Jun 2031 | |
Suncity Avenue 76No photo on file yet | Suncity Projects | Same sector | — | — | 30 Sep 2024 |
| Whiteland Corporation | Same sector | — | ₹14,000/sq ft | 30 Jun 2027 | |
| Whiteland Corporation | Same sector | — | — | 31 Dec 2026 | |
| Whiteland Corporation | Same sector | — | — | 31 Dec 2026 | |
TRL RESIDENTIAL PLOTTED COLONYNo photo on file yet | Trl Riceland | Same sector | — | — | 21 Oct 2022 |
| Whiteland Corporation | Same sector | Under construction | ₹15,500/sq ft | 31 Dec 2030 | |
SEASONSNo photo on file yet | Keystone World | 1.1 kmto its sector’s point | — | — | 30 Sep 2029 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is Pyramid Pride registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/332/64/2019/26, registered on 24 May 2019. Ended 24 Feb 2024. The register shows it as: Registration expired.
The source ↗What is the possession timeline for Pyramid Pride?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 24 Feb 2024. Its registration runs to 24 Feb 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Pyramid Pride?From the records · Map pin and road lines, read 6 Sep 2026
Pyramid Pride is in Sector 76, Gurugram; the site address declared to HARERA is Sector-76, Gurugram. In a straight line it is about 0.9 km from Delhi–Gurugram–SNB RRTS, 1.6 km from Dwarka Expressway and 5.5 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Pyramid Pride?From the records · HARERA, read 4 Nov 2026
Pyramid Pride is a Pyramid Infratech project, registered by its company PYRAMID INFRATECH PVT. LTD..
The source ↗Pyramid Infratech's projects and court recordThe records
What the registers hold for Pyramid Pride: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/332/64/2019/26: Registration expired. Ended 24 Feb 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 26 OF 2019 is on the DTCP register: Licence ends soon; the register prints its validity to 24 Feb 2027.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 8 May 2019, building plans 8 May 2019.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 34 HARERA files, with the dates we read them
- Registration no.
- GGM/332/64/2019/26
- Registration date
- 24 May 2019
- Registration valid till
- 24 Feb 2024
- Declared possession
- 24 Feb 2024
Declared by the promoter to HARERA
- Land area
- 5 (Acre) (20,234.28 sq m)
- FAR
- 2.25 proposed of 2.25 permissible
- licence
- 26 OF 2019
- Estimated project cost
- ₹155.65 crore
- Cost of land
- ₹61.41 crore
- Layout plan, declared approved (field 5a)
- 8 May 2019
- Building plans, declared approved
- 8 May 2019
- Construction to start
- 17 Jun 2019
- Completion declared for
- 24 Feb 2024
Declared inventory · 12 types
Declared inventory — 12 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 354 units · 54.919 sq m carpet · 7 towers · one flat
- Apartment/Shops/Other Buildings · 184 units · 53.933 sq m carpet · 7 towers · one flat
- Apartment/Shops/Other Buildings · 92 units · 53.723 sq m carpet · 7 towers · one flat
- Apartment/Shops/Other Buildings · 92 units · 55.605 sq m carpet · 7 towers · one flat
- Apartment/Shops/Other Buildings · 12 units · 22.265 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 2 units · 25.32 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 8 units · 28.37 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 2 units · 16.76 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 4
Statutory approvals, as declared
- I. LICENSE APPROVAL — declared: already been obtained (25 Feb 2019)
- II. ZONING PLAN APPROVAL — declared: already been obtained (27 Feb 2019)
- III. BUILDING PLAN / SITE PLAN APPROVAL — declared: already been obtained (8 May 2019)
- IV. ENVIRONMENT CLEARANCE APPROVAL BASED ON LATEST APPROVED BUILDING PLAN — declared: applied for but yet to receive
On file with HARERA · 34 files
On file with HARERA (34)
Plans
Site plan
2 filesLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileServices
Service plans
1 fileApprovals and clearances
Occupation certificate (OC)
1 fileDTCP licence
3 filesEnvironment clearance
1 fileOther NOCs and clearances
7 filesLand records
Land records
5 filesMoney
Accounts and finance
4 filesThe promoter’s papers
Declarations and affidavits
4 filesCompany papers
1 fileHARERA’s orders
HARERA’s orders
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
26 OF 2019 · Pyramid Infratech Pvt Ltd · GURGAON-MANESAR
Licence valid to 24 Feb 2027
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 12 May 2019 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
26 OF 2019: 10 parcels, 5 acres in all, in Kherki Dola (hadbast 161), tehsil Manesar.
The licence register prints the same licensed area, 5 acres.
- 43//12/16 kanal 8 marla
- 43//13/17 kanal 18 marla
- 43//13/22 marla
- 43//14 min7 kanal 13 marla
Show the other 6 parcels
- 43//188 kanal
- 43//22/13 kanal 8 marla
- 43//23/13 kanal 11 marla
- 43//8/2/21 kanal 4 marla
- 43//9/24 marla
- 43//12/21 kanal 12 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Kherki Dola (hadbast 161), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 43//12/1.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹6,400 per sq ft
this sector, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (34 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/630 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Pyramid Infratech
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.