Birla Navya (Drisha 1A)
by Avarna Projects · Sector 63, Gurugram
Not on our price list yet
Possession 30 Jun 2024 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 63, Gurugram3.5 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
- Carpet area
- about 1,274 sq ft
In m²
about 118.4 m², the average flat, as declared - Registered by
- AVARNA PROJECTS LLPthe company that filed it, for Avarna Projects
- 7 Sep 2019Layout plan approveddeclared to HARERA, read 29 Oct 2026
- 27 Jan 2020Registered with HARERAHARERA, read 4 Nov 2026
- 20 Feb 2020Building plans approveddeclared to HARERA, read 29 Oct 2026
- 30 Jun 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026
- 30 Dec 2025Registration valid toHARERA, read 4 Nov 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Other usesas the form names them: Residential4,690 m² · 100%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningVRV for the bed rooms and living room
- KitchenTiles / plastic paint / acrylic emulsion / equivalent
- Kitchen appliancesStandard modular kitchen cabinetry
- Lifts1 lift / PLOT
- FloorsMarble / stone / tiles / anti-skid tiles / laminated / equivalent
- WallsTiles / plastic paint / acrylic emulsion / equivalent
- BathroomsStandard sanitary fittings
- WindowsAnodised / powder coated frames with single glazing
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)3.5 km
- Delhi–Gurugram–SNB RRTS7.4 km
- Dwarka ExpresswayOpen, 17 Aug 20259.4 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 2
- Registered, no OC or CC yet: 2
- Other register states: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Adani Brahma Synergy | Same sector | — | — | 31 Dec 2026 | |
| Adani Brahma Synergy | Same sector | — | — | 30 Jun 2029 | |
| Signatureglobal (India) | Same sector | — | — | 28 Feb 2025 | |
Brahma City-J BlockNo photo on file yet | Brahma City | Same sector | — | — | 31 Mar 2022 |
Brahma City-K BlockNo photo on file yet | Brahma City | Same sector | — | — | 31 Mar 2022 |
MAHIRA HOMES-63ANo photo on file yet | Ms Czar Buildwell (P) | Same sector | — | — | — |
Samsara Part-VNo photo on file yet | Brahma City | Same sector | — | — | — |
| Signature Global | Same sector | — | — | 31 Oct 2023 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is Birla Navya (Drisha 1A) registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/391/123/2020/07, registered on 27 Jan 2020. Ended 30 Dec 2025. The register shows it as: Registration expired.
The source ↗What is the possession timeline for Birla Navya (Drisha 1A)?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 30 Jun 2024. Its registration runs to 30 Dec 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Birla Navya (Drisha 1A)?From the records · Map pin and road lines, read 6 Sep 2026
Birla Navya (Drisha 1A) is in Sector 63, Gurugram; the site address declared to HARERA is Pocket G, Birla Navya, Sector-63a, Gurugram, Haryana. In a straight line it is about 3.5 km from Sohna Elevated Corridor (NH-248A), 7.4 km from Delhi–Gurugram–SNB RRTS and 9.4 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Birla Navya (Drisha 1A)?From the records · HARERA, read 4 Nov 2026
Birla Navya (Drisha 1A) is a Avarna Projects project, registered by its company AVARNA PROJECTS LLP.
The source ↗Avarna Projects's projects and court recordThe records
What the registers hold for Birla Navya (Drisha 1A): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/391/123/2020/07: Registration expired. Ended 30 Dec 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 71 OF 2014 is on the DTCP register: Licence lapsed; the register prints its validity to 28 Jul 2026.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 7 Sep 2019, building plans 20 Feb 2020.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Registration expired
Ended 30 Dec 2025. HARERA Gurugram, read 4 Nov 2026. Source
Red flag: Licence 71 OF 2014 lapsed
Named in this project’s application. Valid to 28 Jul 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source
Red flag: Licence 104 OF 2019 lapsed
Named in this project’s application. Valid to 6 Sep 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 15 HARERA files, with the dates we read them
- Registration no.
- GGM/391/123/2020/07
- Registration date
- 27 Jan 2020
- Registration valid till
- 30 Dec 2025
- Declared possession
- 30 Jun 2024
Declared by the promoter to HARERA
- Land area
- 4689.78 (Sqr/mtrs)
- FAR
- 1.82 proposed of 2.4 permissible
- licence
- 119 of 2011(27-12-2019), 71 of 2014(28-07-2024), 104 of 2019(06-09-2024)
- Estimated project cost
- ₹118.00 crore
- Cost of land
- ₹31.13 crore
- Layout plan, declared approved (field 5a)
- 7 Sept 2019
- Building plans, declared approved
- 20 Feb 2020
- Construction to start
- 30 Jun 2020
- Completion declared for
- 30 Jun 2024
Declared inventory · 1 type
Declared inventory
- Apartment/Shops/Other Buildings · 72 units · 8,524.35 sq m carpet · 18 towers · total for 72 flats, about 118.4 m² each
Statutory approvals, as declared · 14
Statutory approvals, as declared
- I. LICENSE NO. OF `119 OF 2011 — declared: already been obtained (28 Dec 2011)
- II. LICENSE NO. OF `71 OF 2014 — declared: already been obtained (29 Jul 2014)
- III. LICENSE NO. 104 OF 2019 — declared: already been obtained (7 Sept 2019)
- IV. LAYOUT PLAN — declared: already been obtained (7 Sept 2019)
- V. ZONING PLAN — declared: already been obtained (4 Oct 2019)
- VI. ELECTRIC LOAD NOC — declared: already been obtained (7 Jun 2017)
- VII. FOREST AND ARAVALLI NOC — declared: already been obtained (18 Jun 2013)
- VIII. FOREST NOC — declared: already been obtained (29 Jul 2019)
- IX. ARAVALLI NOC — declared: already been obtained (21 Aug 2019)
- X. WATER NOC — declared: already been obtained (26 Oct 2017)
- XI. ENVIRONMENTAL CLEARANCE — declared: already been obtained (23 Oct 2013)
- XII. SERVICE PLAN ESTIMATES — declared: applied for but yet to receive (10 Dec 2019)
- XIII. REVISED ENVIRONMENTAL CLEARANCE — declared: applied for but yet to receive (12 Oct 2019)
- XIV. BUILDING PLAN — declared: applied for but yet to receive (2 Dec 2019)
On file with HARERA · 15 files
On file with HARERA (15)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileServices
Service plans
1 fileApprovals and clearances
Occupation certificate (OC)
2 filesDTCP licence
1 fileLand records
Land records
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileHARERA’s orders
HARERA’s orders
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The 3 DTCP licences named on the application
119 OF 2011 · Anant Raj Ltd. · GURGAON-MANESAR
Licence valid to 27 Dec 2027
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
71 OF 2014 · Anant Raj Ltd. · GURGAON-MANESAR
Licence valid to 28 Jul 2026
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
104 OF 2019 · Anant Raj Ltd. · GURGAON-MANESAR
Licence valid to 6 Sept 2024
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 21 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the 3 licences
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
119 OF 2011: 200 parcels, 100.2639 acres in all, in Kadarpur (hadbast 84, tehsil Wazirabad), Madabass (hadbast 87, tehsil Badshahpur) and Ulahwas (hadbast 83, tehsil Wazirabad).
The licence register prints the same licensed area, 100.26 acres.
- 12//15/22 kanal 19 marlaKadarpur (84)
- 12//168 kanalKadarpur (84)
- 12//17/24 kanalKadarpur (84)
- 12//18/1/28 marlaKadarpur (84)
Show the other 196 parcels
- 12//23/2/24 kanal 1 marlaKadarpur (84)
- 12//25/29 marlaKadarpur (84)
- rectangle 12, kila 23/31 kanal 3 marlaKadarpur (84)
- rectangle 12, kila 247 kanal 4 marlaKadarpur (84)
- rectangle 12, kila 25/17 kanal 11 marlaKadarpur (84)
- 14//1/1/27 marlaKadarpur (84)
- 14//1/2/11 kanal 2 marlaKadarpur (84)
- 14//1/2/21 kanal 4 marlaKadarpur (84)
- 14//106 kanal 2 marlaKadarpur (84)
- 14//11/213 marlaKadarpur (84)
- 14//11/2/24 kanal 11 marlaKadarpur (84)
- 14//12/2/26 kanal 9 marlaKadarpur (84)
- 14//13/1/15 kanal 6 marlaKadarpur (84)
- 14//168 kanalKadarpur (84)
- 14//2/1/23 kanal 10 marlaKadarpur (84)
- 14//2/2/12 kanalKadarpur (84)
- 14//2/2/22 kanalKadarpur (84)
- 14//20/22 kanalKadarpur (84)
- 14//21/15 kanal 11 marlaKadarpur (84)
- 14//21/22 kanal 9 marlaKadarpur (84)
- 14//22/23 kanal 13 marlaKadarpur (84)
- 14//22/33 kanal 5 marlaKadarpur (84)
- 14//23/22 kanal 8 marlaKadarpur (84)
- 14//23/311 marlaKadarpur (84)
- 14//23/43 kanal 12 marlaKadarpur (84)
- 14//248 kanalKadarpur (84)
- 14//25/17 kanal 2 marlaKadarpur (84)
- 14//25/218 marlaKadarpur (84)
- 14//3/16 kanalKadarpur (84)
- 14//3/22 kanalKadarpur (84)
- 14//4/1/14 kanal 13 marlaKadarpur (84)
- 14//4/1/21 kanal 1 marlaKadarpur (84)
- 14//4/21 kanal 18 marlaKadarpur (84)
- 14//8/27 kanal 13 marlaKadarpur (84)
- 14//98 kanalKadarpur (84)
- rectangle 14, kila 58 kanalKadarpur (84)
- rectangle 14, kila 6/13 kanal 12 marlaKadarpur (84)
- rectangle 14, kila 15/16 kanal 9 marlaKadarpur (84)
- rectangle 14, kila 11/315 marlaKadarpur (84)
- rectangle 14, kila 19/27 kanal 16 marlaKadarpur (84)
- rectangle 14, kila 20/1/26 kanalKadarpur (84)
- rectangle 14, kila 22/11 kanal 2 marlaKadarpur (84)
- rectangle 14, kila 23/17 marlaKadarpur (84)
- 28//18 kanalKadarpur (84)
- 28//11/1/26 marlaKadarpur (84)
- 28//11/215 marlaKadarpur (84)
- 28//11/3/115 marlaKadarpur (84)
- 28//11/3/24 kanal 3 marlaKadarpur (84)
- 28//2/13 kanal 16 marlaKadarpur (84)
- 28//3/25 kanal 13 marlaKadarpur (84)
- 28//47 kanalKadarpur (84)
- 28//58 kanalKadarpur (84)
- rectangle 28, kila 98 kanalKadarpur (84)
- rectangle 28, kila 108 kanalKadarpur (84)
- rectangle 28, kila 11/1/11 kanal 12 marlaKadarpur (84)
- rectangle 28, kila 2/23 kanal 19 marlaKadarpur (84)
- rectangle 28, kila 3/11 kanal 18 marlaKadarpur (84)
- 15//1/15 kanal 8 marlaKadarpur (84)
- 15//11/1/15 kanal 16 marlaKadarpur (84)
- 15//12/1/24 kanal 4 marlaKadarpur (84)
- 15//16/27 kanal 18 marlaKadarpur (84)
- 15//17/1/2/15 kanal 6 marlaKadarpur (84)
- 15//17/2/219 marlaKadarpur (84)
- 15//18/27 kanal 16 marlaKadarpur (84)
- 15//19/1/24 kanal 17 marlaKadarpur (84)
- 15//19/2/22 kanal 18 marlaKadarpur (84)
- 15//20/2/23 kanal 10 marlaKadarpur (84)
- 15//20/3/21 kanal 15 marlaKadarpur (84)
- 15//21/13 kanal 16 marlaKadarpur (84)
- 15//228 kanalKadarpur (84)
- 15//23/15 kanal 16 marlaKadarpur (84)
- 15//25/21 kanal 2 marlaKadarpur (84)
- 15//5/22 kanalKadarpur (84)
- 15//6/15 kanal 19 marlaKadarpur (84)
- 15//9/15 kanal 4 marlaKadarpur (84)
- rectangle 15, kila 10/27 kanal 4 marlaKadarpur (84)
- rectangle 15, kila 23/24 marlaKadarpur (84)
- rectangle 15, kila 17/1/2/218 marlaKadarpur (84)
- rectangle 15, kila 25/16 kanal 18 marlaKadarpur (84)
- rectangle 15, kila 15/2/1/21 kanal 15 marlaKadarpur (84)
- 29//1/13 kanalKadarpur (84)
- 29//108 kanalKadarpur (84)
- 29//14/14 kanal 11 marlaKadarpur (84)
- 29//14/22 kanal 13 marlaKadarpur (84)
- 29//15/12 kanal 2 marlaKadarpur (84)
- 29//15/25 kanal 10 marlaKadarpur (84)
- 29//17/15 kanal 14 marlaKadarpur (84)
- 29//3/11 kanal 7 marlaKadarpur (84)
- 29//3/26 kanal 7 marlaKadarpur (84)
- 29//3/37 marlaKadarpur (84)
- 29//4/15 kanalKadarpur (84)
- 29//4/23 kanalKadarpur (84)
- 29//5/14 kanalKadarpur (84)
- 29//68 kanalKadarpur (84)
- 29//7/2/15 marlaKadarpur (84)
- 29//7/2/28 marlaKadarpur (84)
- 29//9/22 kanal 16 marlaKadarpur (84)
- rectangle 29, kila 5/24 kanalKadarpur (84)
- rectangle 29, kila 8/1/11 kanal 7 marlaKadarpur (84)
- rectangle 29, kila 8/1/22 kanalKadarpur (84)
- 16//11/1/14 kanal 15 marlaKadarpur (84)
- 16//12/1/24 kanal 17 marlaKadarpur (84)
- 16//198 kanalKadarpur (84)
- 16//2/1/23 kanal 4 marlaKadarpur (84)
- 16//2/22 kanal 16 marlaKadarpur (84)
- 16//208 kanalKadarpur (84)
- 16//218 kanalKadarpur (84)
- 16//22/18 marlaKadarpur (84)
- 16//22/2/16 kanalKadarpur (84)
- 16//26/17 marlaKadarpur (84)
- 16//38 kanalKadarpur (84)
- 16//43 kanalKadarpur (84)
- 16//7/115 marlaKadarpur (84)
- 16//8/113 marlaKadarpur (84)
- 16//8/2/13 kanal 11 marlaKadarpur (84)
- 16//9/1/13 kanal 2 marla 5 sarsaiKadarpur (84)
- rectangle 16, kila 7/2/2/11 kanal 14 marlaKadarpur (84)
- rectangle 16, kila 7/2/1/13 kanal 1 marla 5 sarsaiKadarpur (84)
- rectangle 16, kila 14/1/2/23 kanal 4 marla 5 sarsaiKadarpur (84)
- rectangle 16, kila 1/2/1/16 marlaKadarpur (84)
- rectangle 16, kila 10/2/11 kanal 4 marlaKadarpur (84)
- 11//12/23 kanal 11 marlaKadarpur (84)
- 11//13/14 kanalKadarpur (84)
- 11//148 kanalKadarpur (84)
- 11//15/11 kanal 16 marlaKadarpur (84)
- 11//208 kanalKadarpur (84)
- 11//4/218 marlaKadarpur (84)
- 11//78 kanalKadarpur (84)
- 11//8/1/24 marlaKadarpur (84)
- 11//8/24 kanal 8 marlaKadarpur (84)
- 11//9/2/1/14 marla 5 sarsaiKadarpur (84)
- rectangle 11, kila 218 kanalKadarpur (84)
- rectangle 11, kila 22/12 kanalKadarpur (84)
- rectangle 11, kila 6/2/24 marlaKadarpur (84)
- rectangle 11, kila 11/25 kanal 11 marlaKadarpur (84)
- 10//10/15 kanal 16 marlaKadarpur (84)
- 10//12/14 kanal 4 marlaKadarpur (84)
- 10//239 kanal 12 marlaKadarpur (84)
- 10//96 kanal 3 marlaKadarpur (84)
- rectangle 10, kila 11/1/215 marlaKadarpur (84)
- rectangle 10, kila 11/2/11 kanal 3 marlaKadarpur (84)
- rectangle 10, kila 20/1/33 kanal 7 marlaKadarpur (84)
- rectangle 10, kila 11/2/32 kanal 4 marlaKadarpur (84)
- rectangle 10, kila 19/2/1/12 kanal 8 marlaKadarpur (84)
- rectangle 10, kila 20/1/11 marlaKadarpur (84)
- rectangle 10, kila 12/22 kanal 14 marlaKadarpur (84)
- rectangle 10, kila 183 kanal 19 marlaKadarpur (84)
- rectangle 10, kila 19/13 kanal 16 marlaKadarpur (84)
- rectangle 10, kila 22/26 kanalKadarpur (84)
- 13//16/23 kanal 8 marlaKadarpur (84)
- 46//161 kanal 11 marlaMadabass (87)
- 46//17/17 kanal 4 marlaMadabass (87)
- 29//1/25 kanalUlahwas (83)
- rectangle 29, kila 28 kanalUlahwas (83)
- rectangle 29, kila 8/2/21 kanal 16 marlaUlahwas (83)
- rectangle 29, kila 9/15 kanal 4 marlaUlahwas (83)
- 38//13/22 kanal 19 marlaUlahwas (83)
- 38//147 kanal 7 marlaUlahwas (83)
- 38//17/16 kanal 16 marlaUlahwas (83)
- 38//17/21 kanal 4 marlaUlahwas (83)
- 38//18/1 min east3 kanal 2 marlaUlahwas (83)
- 38//24/116 marlaUlahwas (83)
- 38//24/27 kanal 4 marlaUlahwas (83)
- 38//25/12 kanal 13 marlaUlahwas (83)
- 38//25/24 kanal 15 marlaUlahwas (83)
- 38//7/1/28 marlaUlahwas (83)
- 38//7/21 kanal 17 marlaUlahwas (83)
- 42//10/23 kanal 7 marlaUlahwas (83)
- 42//11/13 kanal 11 marlaUlahwas (83)
- 42//4/3/118 marlaUlahwas (83)
- 42//4/41 kanal 9 marlaUlahwas (83)
- 42//55 kanal 12 marlaUlahwas (83)
- 42//61 kanal 16 marlaUlahwas (83)
- rectangle 42, kila 4/33 kanal 3 marlaUlahwas (83)
- 40//206 kanal 18 marlaUlahwas (83)
- 40//21/1/18 marlaUlahwas (83)
- rectangle 40, kila 21/12 kanal 2 marlaUlahwas (83)
- 43//14/2/25 kanal 2 marlaUlahwas (83)
- 43//15/12 kanal 16 marlaUlahwas (83)
- 43//15/25 kanal 4 marlaUlahwas (83)
- 43//16/12 kanal 16 marlaUlahwas (83)
- 43//17/15 kanal 2 marlaUlahwas (83)
- 43//248 kanalUlahwas (83)
- 46//4/1/25 kanal 16 marlaUlahwas (83)
- 39//138 kanalUlahwas (83)
- 39//148 kanalUlahwas (83)
- 39//158 kanalUlahwas (83)
- 39//168 kanalUlahwas (83)
- 39//17/1/13 kanal 2 marlaUlahwas (83)
- 39//18/13 kanal 6 marlaUlahwas (83)
- 39//24/22 kanal 12 marlaUlahwas (83)
- 39//258 kanalUlahwas (83)
- 39//68 kanalUlahwas (83)
- 39//78 kanalUlahwas (83)
- 39//8/14 kanalUlahwas (83)
- rectangle 39, kila 8/33 kanalUlahwas (83)
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
71 OF 2014: 26 parcels, 7.8625 acres in all, in Kadarpur (hadbast 84) and Ulahwas (hadbast 83), tehsil Wazirabad.
The licence register prints the same licensed area, 7.86 acres.
- 29//7/1/15 kanal 13 marlaKadarpur (84)
- 14//1/1/11 kanal 10 marlaKadarpur (84)
- 14//13/2/16 marlaKadarpur (84)
- 14//18/3/2/2 min3 kanalKadarpur (84)
Show the other 22 parcels
- 14//2/1/110 marlaKadarpur (84)
- 11//10/2 min2 kanal 17 marlaKadarpur (84)
- 11//11/11 kanal 15 marlaKadarpur (84)
- 11//6/2/16 kanalKadarpur (84)
- 10//1/24 kanal 1 marlaKadarpur (84)
- 15//1/22 kanal 3 marlaKadarpur (84)
- 15//11/1/213 marlaKadarpur (84)
- 15//12/1/12 kanal 5 marlaKadarpur (84)
- 15//2 min1 kanal 7 marlaKadarpur (84)
- 15//261 kanal 2 marlaKadarpur (84)
- 15//9/22 kanal 16 marlaKadarpur (84)
- 15//10/116 marlaKadarpur (84)
- 16//8/2/2/1/1 min1 kanal 7 marlaKadarpur (84)
- 4//12/12 kanal 2 marlaKadarpur (84)
- 4//13/1/12 kanal 2 marlaKadarpur (84)
- 4//13/2/11 kanal 14 marlaKadarpur (84)
- rectangle 15, kila 23/31 kanal 13 marlaKadarpur (84)
- rectangle 15, kila 24/2/22 kanal 18 marlaKadarpur (84)
- rectangle 15, kila 24/14 kanal 10 marlaKadarpur (84)
- 12//23/2/110 marlaKadarpur (84)
- 40//118 kanalUlahwas (83)
- 40//12/11 kanal 8 marlaUlahwas (83)
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
104 OF 2019: 8 parcels, 2.0812 acres in all, in Kadarpur (hadbast 84) and Ulahwas (hadbast 83), tehsil Wazirabad.
The licence register prints the same licensed area, 2.0813 acres.
- 15//20/1/22 kanal 11 marlaKadarpur (84)
- 15//21/24 kanal 4 marlaKadarpur (84)
- 4//12/23 kanal 10 marlaKadarpur (84)
- 4//13/1/22 kanal 2 marlaKadarpur (84)
Show the other 4 parcels
- 4//13/2/21 kanal 14 marlaKadarpur (84)
- 38//16/212 marlaUlahwas (83)
- 39//8/21 kanalUlahwas (83)
- 40//12/21 kanalUlahwas (83)
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village you want: Kadarpur (hadbast 84, tehsil Wazirabad), Madabass (hadbast 87, tehsil Badshahpur) or Ulahwas (hadbast 83, tehsil Wazirabad). The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 12//15/2.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹9,900 per sq ft
Sector 63, collector rates effective 1 Apr 2026, Wazirabad tehsil. 2 tehsil lists price this sector; this is the higher. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (15 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1118 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Avarna Projects
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.