Skip to content

SIGNATURE GLOBAL CITY 63A (1)

by Signatureglobal (India) · Sector 63, Gurugram

Not on our price list yet

Possession 28 Feb 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 63, Gurugram3.5 km from Sohna Elevated Corridor (NH-248A), in a straight line
Carpet area
584–7,787 sq ft
In m²about 54–723 m², as declared
Registered by
SIGNATUREGLOBAL (INDIA) LIMITEDthe company that filed it, for Signatureglobal (India)
Timeline
  1. 20 Dec 2021Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 5 May 2022Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 28 Feb 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 26 Feb 2027Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

205homes, 584 to 7,787 sq ft of carpet area
  • Under 1,000 sq ft584–950 sq ft148
  • 3,000 sq ft and above7,787 sq ft57

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioningISI marked
  • KitchenTiles / acrylic emulsion / equivalent
  • Kitchen appliancesCP fittings ISI marked
  • Lifts1 lift / PLOT
  • FloorsMarble / stone I tiles I anti-skid tiles / laminated I equivalent
  • WallsTiles I acrylic emulsion I equivalent /OBD
  • BathroomsStandard sanitary & CP fittings
  • WindowsUPVC / aluminium

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 63, GurugramSector 63, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)3.5 km
  • Delhi–Gurugram–SNB RRTS7.4 km
  • Dwarka ExpresswayOpen, 17 Aug 20259.4 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 9 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 7
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is SIGNATURE GLOBAL CITY 63A (1) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/581/313/2022/56. Valid to 26 Feb 2027.

The source ↗
What is the possession timeline for SIGNATURE GLOBAL CITY 63A (1)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 28 Feb 2025. Its registration runs to 26 Feb 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SIGNATURE GLOBAL CITY 63A (1)?From the records · Map pin and road lines, read 6 Sep 2026

SIGNATURE GLOBAL CITY 63A (1) is in Sector 63, Gurugram; the site address declared to HARERA is Village Kadarpur Sector 63. In a straight line it is about 3.5 km from Sohna Elevated Corridor (NH-248A), 7.4 km from Delhi–Gurugram–SNB RRTS and 9.4 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SIGNATURE GLOBAL CITY 63A (1)?From the records · HARERA, read 4 Nov 2026

SIGNATURE GLOBAL CITY 63A (1) is a Signatureglobal (India) project, registered by its company SIGNATUREGLOBAL (INDIA) LIMITED.

The source ↗Signatureglobal (India)'s projects and court record

The records

What the registers hold for SIGNATURE GLOBAL CITY 63A (1): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/581/313/2022/56: Registered. Valid to 26 Feb 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 110 OF 2021 is on the DTCP register: Licence ends soon; the register prints its validity to 16 Dec 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 20 Dec 2021, building plans 5 May 2022.Declared to HARERA, read 29 Oct 2026
The court record of Signatureglobal (India)’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 26 Feb 2027. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 110 OF 2021 ends soon

    Named in this project’s application. Valid to 16 Dec 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 11 HARERA files, with the dates we read them
Registration no.
GGM/581/313/2022/56
Registration valid till
26 Feb 2027
Declared possession
28 Feb 2025

Declared by the promoter to HARERA

Land area
5.0125 (Acre) (20,284.87 sq m)
FAR
2.47 proposed of 2.64 permissible
licence
110 of 2021 dated 17.12.2021
Estimated project cost
₹192.68 crore
Cost of land
₹29.05 crore
Layout plan, declared approved (field 5a)
20 Dec 2021
Building plans, declared approved
5 May 2022
Construction to start
1 Apr 2022
Completion declared for
28 Feb 2025
Declared inventory · 4 types

Declared inventory

  • Apartment/Shops/Other Buildings · 52 units · 88.25 sq m carpet · 13 towers · one flat
  • Apartment/Shops/Other Buildings · 80 units · 71.924 sq m carpet · 20 towers · one flat
  • Apartment/Shops/Other Buildings · 16 units · 54.23 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 57 units · 723.421 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. 110 OF 2021 — declared: already been obtained (17 Dec 2021)
  • II. ZOINING PLAN MEMO NO. 8147 — declared: already been obtained (1 Feb 2022)
  • III. ELECTRICAL LOAD CH40/DGR-26B — declared: already been obtained (14 Jan 2022)
  • IV. WATER SUPPLY MEMO NO: EE(PROJ)/GMDA/2022/44 — declared: already been obtained (13 Jan 2022)
On file with HARERA · 11 files

On file with HARERA (11)

Plans

Site plan

1 file
Approved Site Plan2 May 2022

Layout plan

1 file
Latest Layout Plan2 May 2022

Zoning plan

1 file
Zoning Plan2 May 2022

Demarcation plan

1 file
Demarcation Plan2 May 2022

Services

Service plans

1 file
Service Plans on the Layout2 May 2022

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule2 May 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration2 May 2022

Money

Accounts and finance

1 file
Non-Default Certificate from a CA2 May 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit2 May 2022

HARERA’s orders

HARERA’s orders

1 file
Extension No. 28 of 2025 dated 26.06.202527 Jun 2025

Other filings

Other filings

1 file
PROJECT CONTINUATION- RC/REP/HARERA/GGM/56 of 2022/7(3)/98/2026/03 DATED 03.02.20269 Apr 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

110 OF 2021 · SIGNATURE GLOBAL (INDIA) PVT. LTD. · GURGAON-MANESAR

Licence valid to 16 Dec 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 2 May 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

110 OF 2021: 10 parcels, 5.0125 acres in all, in Kadarpur (hadbast 84), tehsil Wazirabad.

The licence register prints the same licensed area, 5.0125 acres.

  • 11//23/25 kanal
  • 15//13/1/13 kanal 5 marla
  • 15//14/1/12 marla
  • 15//14/1/3/12 kanal 14 marla
Show the other 6 parcels
  • 15//3/25 kanal
  • 15//4/12 kanal 5 marla
  • 15//4/23 kanal 12 marla
  • 15//5/12 kanal 14 marla
  • 15//77 kanal 10 marla
  • 15//88 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Kadarpur (hadbast 84), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 11//23/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “SIGNATURE GLOBAL CITY 63A (1)”, by M/s. Signatureglobal (India) Private Limited, code Gurgaon-0426-007197, approved 2026.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan2 May 2022

Layout plan

1 file
Latest Layout Plan2 May 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (11 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1945 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Signatureglobal (India)

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.