Signature Global Prime
by Signature Global · Sector 63, Gurugram
Not on our price list yet
Possession 31 Oct 2023 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 63, Gurugram3.5 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
- Carpet area
- about 583 sq ft
In m²
about 54.2 m², the average flat, as declared - Registered by
- SIGNATUREGLOBAL (INDIA) PRIVATE LIMITEDthe company that filed it, for Signature Global
- 30 Sep 2019Layout plan approveddeclared to HARERA, read 29 Oct 2026
- 11 Oct 2019Building plans approveddeclared to HARERA, read 29 Oct 2026
- 14 Nov 2019Registered with HARERAHARERA, read 4 Nov 2026
- 31 Oct 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026
- 28 Apr 2025Registration valid toHARERA, read 4 Nov 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads2.481 acres · 50%
- Apartment buildings1.01 acres · 20%
- Green belts0.783 acres · 16%
- Sewage and waste treatment0.434 acres · 9%
- Other uses0.194 acres · 4%
- Club house0.092 acres · 2%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenISI marked
- LiftsISI marked
- FloorsVitrified & ceramic tiles
- WallsOBD
- BathroomsISI marked
- WindowsAluminiumn/UPVC
- Main doorFlush door
- Electrical fittingsISI marked
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)3.5 km
- Delhi–Gurugram–SNB RRTS7.4 km
- Dwarka ExpresswayOpen, 17 Aug 20259.4 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 6
- Registered, no OC or CC yet: 5
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Adani Brahma Synergy | Same sector | — | — | 31 Dec 2026 | |
| Adani Brahma Synergy | Same sector | — | — | 30 Jun 2029 | |
| Signatureglobal (India) | Same sector | — | — | 28 Feb 2025 | |
Brahma City-J BlockNo photo on file yet | Brahma City | Same sector | — | — | 31 Mar 2022 |
| Avarna Projects | Same sector | — | — | 30 Jun 2024 | |
Brahma City-K BlockNo photo on file yet | Brahma City | Same sector | — | — | 31 Mar 2022 |
MAHIRA HOMES-63ANo photo on file yet | Ms Czar Buildwell (P) | Same sector | — | — | — |
Samsara Part-VNo photo on file yet | Brahma City | Same sector | — | — | — |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is Signature Global Prime registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/374/106/2019/68, registered on 14 Nov 2019. Ended 28 Apr 2025. The register shows it as: Registration expired.
The source ↗What is the possession timeline for Signature Global Prime?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Oct 2023. Its registration runs to 28 Apr 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Signature Global Prime?From the records · Map pin and road lines, read 6 Sep 2026
Signature Global Prime is in Sector 63, Gurugram; the site address declared to HARERA is Village Kadarpur, Sector 63agurugram-Manesar Urban Complex,Dist.Gurugram, Haryana. In a straight line it is about 3.5 km from Sohna Elevated Corridor (NH-248A), 7.4 km from Delhi–Gurugram–SNB RRTS and 9.4 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Signature Global Prime?From the records · HARERA, read 4 Nov 2026
Signature Global Prime is a Signature Global project, registered by its company SIGNATUREGLOBAL (INDIA) PRIVATE LIMITED.
The source ↗Signature Global's projects and court recordThe records
What the registers hold for Signature Global Prime: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/374/106/2019/68: Registration expired. Ended 28 Apr 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 69 OF 2019 is on the DTCP register: Licence ends soon; the register prints its validity to 10 Dec 2026.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 30 Sep 2019, building plans 11 Oct 2019.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 25 HARERA files, with the dates we read them
- Registration no.
- GGM/374/106/2019/68
- Registration date
- 14 Nov 2019
- Registration valid till
- 28 Apr 2025
- Declared possession
- 31 Oct 2023
Declared by the promoter to HARERA
- Land area
- 5 (Acre) (20,234.28 sq m)
- FAR
- the application prints 236.97, which is not a ratio
- licence
- 69 of 2019 dated 26/06/2019
- Estimated project cost
- ₹181.62 crore
- Cost of land
- ₹33.76 crore
- Layout plan, declared approved (field 5a)
- 30 Sept 2019
- Building plans, declared approved
- 11 Oct 2019
- Construction to start
- 1 Nov 2019
- Completion declared for
- 31 Oct 2023
Declared inventory · 6 types
Declared inventory
- Apartment/Shops/Other Buildings · 160 units · 8,620.399 sq m carpet · 1 tower · total for 160 flats, about 53.9 m² each
- Apartment/Shops/Other Buildings · 160 units · 8,620.399 sq m carpet · 1 tower · total for 160 flats, about 53.9 m² each
- Apartment/Shops/Other Buildings · 120 units · 6,465.299 sq m carpet · 1 tower · total for 120 flats, about 53.9 m² each
- Apartment/Shops/Other Buildings · 120 units · 6,465.299 sq m carpet · 1 tower · total for 120 flats, about 53.9 m² each
- Apartment/Shops/Other Buildings · 120 units · 6,465.299 sq m carpet · 1 tower · total for 120 flats, about 53.9 m² each
- Apartment/Shops/Other Buildings · 34 units · 2,038.805 sq m carpet · 1 tower · total for 34 flats, about 60 m² each
Statutory approvals, as declared · 6
Statutory approvals, as declared
- I. LICENSE 69 OF 2019 — declared: already been obtained (26 Jun 2019)
- II. 3860 — declared: already been obtained (26 Aug 2019)
- III. GMDA/SEW/ 2019/2239 — declared: already been obtained (30 Aug 2019)
- IV. MEMO NO. CH 30/DGR-26B — declared: already been obtained (11 Sept 2019)
- V. DRG.NO. DTCP 7034 — declared: already been obtained (27 Jun 2019)
- VI. PALM/NORTH/B/090619/428127 — declared: already been obtained (6 Sept 2019)
On file with HARERA · 25 files
On file with HARERA (25)
Plans
Site plan
1 fileLayout plan
1 fileDemarcation plan
1 fileBuilding plans
9 filesFloor plans
3 filesApprovals and clearances
Occupation certificate (OC)
1 fileCompletion certificate (CC)
1 fileDTCP licence
1 fileFire safety
1 fileLand records
Land records
2 filesMoney
Accounts and finance
1 fileThe promoter’s papers
Declarations and affidavits
1 fileHARERA’s orders
HARERA’s orders
1 fileOther filings
Other filings
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
69 OF 2019 · SIGNATURE GLOBAL (INDIA) PVT. LTD. · GURGAON-MANESAR
Licence valid to 10 Dec 2026
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 26 Sept 2019 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
69 OF 2019: 9 parcels, 5 acres in all, in Kadarpur (hadbast 84), tehsil Wazirabad.
The licence register prints the same licensed area, 5 acres.
- 11//176 kanal
- 11//188 kanal
- 11//198 kanal
- 11//24/13 kanal
Show the other 5 parcels
- 11//24/23 kanal
- 15//4/1 min1 kanal 11 marla
- 15//5/1 min3 kanal 6 marla
- 16//10/2/22 kanal 13 marla
- 16//1/2/1/24 kanal 10 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Kadarpur (hadbast 84), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 11//17.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹9,900 per sq ft
Sector 63, collector rates effective 1 Apr 2026, Wazirabad tehsil. 2 tehsil lists price this sector; this is the higher. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
9 filesFloor plans
3 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (25 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/870 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Signature Global
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.