Timeline
  1. 2 Nov 2016Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 25 Apr 2022Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Dec 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside1.23 acres in all, by use
  • Apartment buildings1.23 acres · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRF airconditioning in living/dining & all bedrooms
  • KitchenModular kitchen with hob
  • Kitchen appliancesModular kitchen with hob
  • Lifts5/6 passengers
  • FloorsImported marble/vitrified tiles/ceramic tiles
  • WallsAcrylic emulsion paint
  • BathroomsJaquar or equivalent
  • WindowsClear glass aluminium windows

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 63, GurugramSector 63, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)3.5 km
  • Delhi–Gurugram–SNB RRTS7.4 km
  • Dwarka ExpresswayOpen, 17 Aug 20259.4 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 8 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 2
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is SAMSARA AVASA registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/648/380/2022/123. Valid to 31 Dec 2026.

The source ↗
What is the possession timeline for SAMSARA AVASA?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2026. Its registration runs to 31 Dec 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SAMSARA AVASA?From the records · Map pin and road lines, read 6 Sep 2026

SAMSARA AVASA is in Sector 63, Gurugram; the site address declared to HARERA is Block-L, Sector-63, Village-Ullahawas. In a straight line it is about 3.5 km from Sohna Elevated Corridor (NH-248A), 7.4 km from Delhi–Gurugram–SNB RRTS and 9.4 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SAMSARA AVASA?From the records · HARERA, read 4 Nov 2026

SAMSARA AVASA is a Adani Brahma Synergy project, registered by its company ADANI BRAHMA SYNERGY PRIVATE LIMITED.

The source ↗Adani Brahma Synergy's projects and court record

The records

What the registers hold for SAMSARA AVASA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/648/380/2022/123: Registered. Valid to 31 Dec 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 2 Nov 2016, building plans 25 Apr 2022.Declared to HARERA, read 29 Oct 2026
The court record of Adani Brahma Synergy’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 31 Dec 2026. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 64 HARERA files, with the dates we read them
Registration no.
GGM/648/380/2022/123
Registration valid till
31 Dec 2026
Declared possession
31 Dec 2026

Declared by the promoter to HARERA

Land area
1.2296 (Acre) (4,976.01 sq m)
FAR
2.3 proposed of 2.41 permissible
licence
NA
Estimated project cost
₹128.95 crore
Cost of land
₹24.56 crore
Layout plan, declared approved (field 5a)
2 Nov 2016
Building plans, declared approved
25 Apr 2022
Construction to start
1 Oct 2022
Completion declared for
31 Dec 2026
Declared inventory · 17 types

Declared inventory — 17 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 4 units · 125.966 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 126.423 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 137.864 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 131.979 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 131.979 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 131.979 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 141.132 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 4 units · 137.11 sq m carpet · 1 tower
Statutory approvals, as declared · 11

Statutory approvals, as declared

  • I. BUILDING PLAN APPROVALS — declared: already been obtained (25 Apr 2022)
  • II. CONVEYANCE DEED (L-1,L-2,L-8) — declared: already been obtained (13 Jan 2021)
  • III. CONVEYANCE DEED (L-9,L-10,L-11,L-12) — declared: already been obtained (14 Jan 2021)
  • IV. RECTIFICATION DEED (L-13,L-22) — declared: already been obtained (28 Mar 2022)
  • V. RECTIFICATION DEED (L-14,L-15,L-16,L-17,L-18,L-19,L-20,L-21) — declared: already been obtained (14 Jan 2021)
  • VI. BR-III (L-1,L-2,L-8,L-9,L-10,L-11,L-12) — declared: already been obtained (7 Apr 2022)
  • VII. BR-III (L-13) — declared: already been obtained (25 Apr 2022)
  • VIII. BR-III (L-14, L-15, L-16) — declared: already been obtained (12 Apr 2022)
  • IX. BR-III (L-17) — declared: already been obtained (13 Apr 2022)
  • X. BR-III (L-18,L-19,L-20,L-21) — declared: already been obtained (13 Apr 2022)
  • XI. BR-III (L-22) — declared: already been obtained (25 Apr 2022)
On file with HARERA · 64 files

On file with HARERA (64)

Plans

Site plan

1 file
Approved Site Plan1 Sept 2022

Layout plan

1 file
Latest Layout Plan3 Oct 2022

Zoning plan

1 file
Zoning Plan3 Oct 2022

Demarcation plan

1 file
Demarcation Plan3 Oct 2022

Building plans

22 files
BR-III-13 Oct 2022BR-III-23 Oct 2022BR-III-33 Oct 2022

Floor plans

17 files
L 1 Floor Plan Area Diagrams3 Oct 2022L 2 Floor Plan Area Diagrams3 Oct 2022L 8 Floor Plan Area Diagrams3 Oct 2022

Services

Sewerage and drainage

1 file
Assurance for Sewerage Connection3 Oct 2022

Water supply

1 file
Assurance for Supply of Water Supply3 Oct 2022

Electricity

1 file
Approval of Electrification Plan3 Oct 2022

Service plans

1 file
Service Plans on the Layout1 Sept 2022

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded5 Feb 2026

DTCP licence

1 file
Licence Copy with Land Schedule1 Sept 2022

Environment clearance

1 file
Environmental Clearance3 Oct 2022

Other NOCs and clearances

1 file
Forest NOC3 Oct 2022

Land records

Land records

5 files
Mutation Copy3 Oct 2022Jamabandi Copy3 Oct 2022Aks Sizra3 Oct 2022

Money

Accounts and finance

3 files
Non-Default Certificate from a CA3 Oct 2022CA Certificate on the Application’s Figures3 Oct 2022Cash Flow Statement1 Sept 2022

Timeline and progress

Construction schedule

1 file
PERT Chart3 Oct 2022

The promoter’s papers

Declarations and affidavits

4 files
Undertaking3 Oct 2022Promoter Affidavit3 Oct 2022Bank Undertaking3 Oct 2022The Promoter’s Declaration on Affidavit3 Oct 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared NA. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 3 Sept 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate

No one collector rate can be matched to this project's type.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “SAMSARA AVASA”, by Adani Brahma Synergy Pvt Ltd And M/S Achaleshwar Infrastructure Pvt. Ltd., code Gurgaon-0726-007499, approved 2026.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan1 Sept 2022

Layout plan

1 file
Latest Layout Plan3 Oct 2022

Building plans

22 files
BR-III-13 Oct 2022BR-III-23 Oct 2022BR-III-33 Oct 2022L 1 Section & Elevation3 Oct 2022L 2 Section & Elevation3 Oct 2022L 8 Section & Elevation3 Oct 2022

Floor plans

17 files
L 1 Floor Plan Area Diagrams3 Oct 2022L 2 Floor Plan Area Diagrams3 Oct 2022L 8 Floor Plan Area Diagrams3 Oct 2022L 9 Floor Plan Area Diagrams3 Oct 2022L 10 Floor Plan Area Diagrams3 Oct 2022L 11 Floor Plan Area Diagrams3 Oct 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (64 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2102 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Adani Brahma Synergy

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.