Centrum Park (Ph-II)

by Selene Constructions · Sector 103, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 103, Gurugram0.9 km from Dwarka Expressway, in a straight linePrices and what changed
Land
89282.758 (Sqr/mtrs)
Registered
8 Jan 2018
Registered by
SELENE CONSTRUCTIONS LIMITEDthe company that filed it, for Selene Constructions
Timeline
  1. 23 Aug 2013Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 8 Jan 2018Registered with HARERAHARERA, read 4 Nov 2026
  3. 31 Oct 2018Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Kitchen- antiskid tiles at floor - ceramic tile DADO with acrylic emulsion paint. - granite counter and SS sink with CP fittings
  • Kitchen appliancesSS sink of standard make.
  • Lifts- passenger / service lifts provided
  • Floors- ceramic/ vitrified tiles - laminated wooden flooring
  • Walls- acrylic emulsion paint - oil BOND distemper
  • Bathrooms- antiskid tiles at floor - ceramic tile DADO with acrylic emulsion paint. - CP fittings china WARE, modular switches
  • Windows- UPVC
  • Main door- wooden flush door

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 103, GurugramSector 103, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.9 km
  • Delhi–Gurugram–SNB RRTS6.3 km
  • Sohna Elevated Corridor (NH-248A)7.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Centrum Park (Ph-II) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 10 OF 2018, registered on 8 Jan 2018. Ended 31 Oct 2018. The register shows it as: Registration expired.

The source ↗
How is the connectivity around Centrum Park (Ph-II)?From the records · Map pin and road lines, read 6 Sep 2026

Centrum Park (Ph-II) is in Sector 103, Gurugram; the site address declared to HARERA is Sector-103, Village Daultabad, District Gurugram, Haryana. In a straight line it is about 0.9 km from Dwarka Expressway, 6.3 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Centrum Park (Ph-II)?From the records · HARERA, read 4 Nov 2026

Centrum Park (Ph-II) is a Selene Constructions project, registered by its company SELENE CONSTRUCTIONS LIMITED.

The source ↗Selene Constructions's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Centrum Park (Ph-II): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 10 OF 2018: Registration expired. Ended 31 Oct 2018.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 252 OF 2007 is on the DTCP register: Licence lapsed; the register prints its validity to 1 Nov 2024.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 23 Aug 2013, building plans 23 Aug 2013.Declared to HARERA, read 29 Oct 2026
The court record of Selene Constructions’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Oct 2018. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 252 OF 2007 lapsed

    Named in this project’s application. Valid to 1 Nov 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Red flag: Licence 50 OF 2011 lapsed

    Named in this project’s application. Valid to 4 Jun 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Red flag: Licence 63 OF 2012 lapsed

    Named in this project’s application. Valid to 18 Jun 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 34 HARERA files, with the dates we read them
Registration no.
10 OF 2018
Registration date
8 Jan 2018
Registration valid till
31 Oct 2018

Declared by the promoter to HARERA

Land area
89282.758 (Sqr/mtrs)
FAR
1.75 proposed of 1.75 permissible
licence
252 of 2007 dated 2.11.2007 50 of 2011 dated 5.06.2011 63 of 2012 dated 19.06.2012
Estimated project cost
₹358.60 crore
Cost of land
₹38.04 crore
Layout plan, declared approved (field 5a)
23 Aug 2013
Building plans, declared approved
23 Aug 2013
Declared inventory · 12 types

Declared inventory — 12 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type B-2 BED+S-79 · 24 units
  • APARTMENT/SHOPS/OTHER BUILDINGS Type B-2-BED-74 · 11 units
  • APARTMENT/SHOPS/OTHER BUILDINGS Type B-2-BED-75 · 11 units
  • APARTMENT/SHOPS/OTHER BUILDINGS Type G1-4 BED -166 · 55 units
  • APARTMENT/SHOPS/OTHER BUILDINGS Type G1-DUPLEX--243 · 4 units
  • APARTMENT/SHOPS/OTHER BUILDINGS Type G1-PH-269 · 4 units
  • APARTMENT/SHOPS/OTHER BUILDINGS Type G2-4 BED -166 · 80 units
  • APARTMENT/SHOPS/OTHER BUILDINGS Type G2-DUPLEX--243 · 8 units
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. ENVIRONMENT CLEARANCE APPROVAL — declared: already been obtained (1 Oct 2013)
  • II. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (2 Aug 2017)
  • III. FIRE SCHEME APPROVAL — declared: already been obtained (11 Dec 2013)
  • IV. SERVICE PLAN ESTIMATES APPROVAL — declared: already been obtained (5 Jan 2015)
  • V. LICENSE APPROVAL — declared: already been obtained (9 Jun 2012)
  • VI. ZONING PLAN APPROVAL — declared: already been obtained (20 Jun 2012)
  • VII. BUILDING PLAN / SITE PLAN APPROVAL — declared: already been obtained (23 Aug 2013)
On file with HARERA · 34 files

On file with HARERA (34)

Plans

Site plan

1 file
Approved Site Plan30 Dec 2019

Layout plan

1 file
Latest Layout Plan30 Dec 2019

Zoning plan

1 file
Zoning Plan30 Dec 2019

Demarcation plan

1 file
Demarcation Plan30 Dec 2019

Building plans

7 files
Tower G1 Section30 Dec 2019Tower B Elevation30 Dec 2019Tower B Section30 Dec 2019

Floor plans

7 files
Tower B Typical Plan30 Dec 2019Tower G1 Typical Floor Plan30 Dec 2019Basement Part -130 Dec 2019

Services

Sewerage and drainage

1 file
Strom Water30 Dec 2019

Water supply

1 file
Water Supply30 Dec 2019

Electricity

2 files
Electrical Scheme30 Dec 2019Street Lighting Plan30 Dec 2019

Roads

1 file
Road30 Dec 2019

Service plans

1 file
Service Plans on the Layout30 Dec 2019

Approvals and clearances

Occupation certificate (OC)

2 files
Oc uploaded for Tower G1, G2, G3 and B8 Aug 2023OC uploaded8 Aug 2023

DTCP licence

1 file
Licence Copy with Land Schedule30 Dec 2019

Fire safety

1 file
Fire Fighting30 Dec 2019

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures30 Dec 2019Cash Flow Statement30 Dec 2019Non-Default Certificate from a CA30 Dec 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit30 Dec 2019

Other filings

Other filings

2 files
Community Building30 Dec 2019Community Building30 Dec 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 3 DTCP licences named on the application

252 OF 2007 · Selene construction · GURGAON-MANESAR

Licence valid to 1 Nov 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

50 OF 2011 · Selene Constructions Ltd. · GURGAON-MANESAR

Licence valid to 4 Jun 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

63 OF 2012 · Selene Constructions · GURGAON-MANESAR

Licence valid to 18 Jun 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 30 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 3 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

252 OF 2007: 33 parcels, 17.0812 acres in all, in Daultabad (hadbast 53), tehsil Kadipur.

The licence register prints the same licensed area, 17.08 acres.

  • 52//118 kanal
  • 52//12/13 kanal 4 marla
  • 52//12/24 kanal 16 marla
  • 52//13/13 kanal 12 marla
Show the other 29 parcels
  • 52//13/24 kanal 8 marla
  • 52//18/14 kanal
  • 52//18/23 kanal 12 marla
  • 52//19/1/11 kanal 4 marla
  • 52//19/1/21 kanal 5 marla
  • 52//19/25 kanal 11 marla
  • 52//2/17 marla
  • 52//2/26 kanal 15 marla
  • 52//21/24 kanal 9 marla
  • 52//227 kanal 7 marla
  • 52//2710 marla
  • 52//2810 marla
  • 52//3/13 kanal 4 marla
  • 52//3/23 kanal 18 marla
  • 52//7/22 kanal 12 marla
  • 52//8/13 kanal 18 marla
  • 52//8/23 kanal 12 marla
  • 52//9/11 kanal 5 marla
  • 52//9/25 kanal 17 marla
  • 52//9/31 marla
  • 52//9/47 marla
  • 53//158 kanal
  • 53//168 kanal
  • 53//248 kanal
  • 53//257 kanal 10 marla
  • 53//2710 marla
  • 71//48 kanal
  • 71//58 kanal
  • 71//6/14 kanal 9 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

50 OF 2011: 9 parcels, 1.9563 acres in all, in Daultabad (hadbast 53), tehsil Kadipur.

The licence register prints the same licensed area, 1.9563 acres.

  • 52//20/17 kanal 13 marla
  • 52//20/27 marla
  • 52//21/1/12 kanal 14 marla
  • 52//21/1/22 marla
Show the other 5 parcels
  • 52//3210 marla
  • 52//3110 marla
  • 72//1/21 kanal 5 marla
  • 72//1/31 kanal 6 marla
  • 72//1/41 kanal 6 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

63 OF 2012: 5 parcels, 3.025 acres in all, in Daultabad (hadbast 53), tehsil Kadipur.

The licence register prints the same licensed area, 3.03 acres.

  • 52//237 kanal 11 marla
  • 72//1/52 kanal 9 marla
  • 72//2/12 kanal 13 marla
  • 72//2/2/14 kanal
Show the other 1 parcel
  • 72//3/17 kanal 11 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Daultabad (hadbast 53), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 52//11.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,000 per sq ft

Sector 103, collector rates effective 1 Apr 2026, Kadipur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan30 Dec 2019

Layout plan

1 file
Latest Layout Plan30 Dec 2019

Building plans

7 files
Tower G1 Section30 Dec 2019Tower B Elevation30 Dec 2019Tower B Section30 Dec 2019Tower G2 G3 Elevations30 Dec 2019Tower G2 G3 Section30 Dec 2019Approved Building Plans, Full Set30 Dec 2019Tower G1 Elevation30 Dec 2019

Floor plans

7 files
Tower B Typical Plan30 Dec 2019Tower G1 Typical Floor Plan30 Dec 2019Basement Part -130 Dec 2019Basement Part -230 Dec 2019Tower G2 G3 Typical30 Dec 2019Tower G2 G3 Ground to 2nd30 Dec 2019Towr G1 Ground Floor30 Dec 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (34 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1158 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Selene Constructions

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.