CHINTAMANIS

by Aviana Greens Estates · Sector 103, Gurugram

Not on our price list yet

Possession 11 Sep 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 103, Gurugram0.9 km from Dwarka Expressway, in a straight line
Carpet area
993–2,319 sq ft
In m²about 92–215 m², as declared
Registered by
AVIANA GREENS ESTATES PVT LTDthe company that filed it, for Aviana Greens Estates
Timeline
  1. 12 Nov 2021Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 13 Jan 2023Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 11 Sep 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 10 Nov 2026Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

312homes, 993 to 2,319 sq ft of carpet area
  • Under 1,000 sq ft993 sq ft144
  • 1,000–1,500 sq ft1,040–1,433 sq ft152
  • 1,500–2,000 sq ft1,593–1,852 sq ft12
  • 2,000–2,500 sq ft2,319 sq ft4

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 49 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside4.292 acres in all, by use
  • Roads1.532 acres · 36%
  • Parks and playgrounds1.106 acres · 26%
  • Parking0.796 acres · 19%
  • Apartment buildings0.642 acres · 15%
  • Other usesas the form names them: Storm water drainage, STP (sewage treatment plant), UGT (underground water tank)0.168 acres · 4%
  • Electricity sub-station0.04 acres · under 1%
  • Sewage and waste treatment0.008 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenISI marked
  • LiftsAs per standerds
  • WardrobesWooden
  • FloorsVitrified tiles
  • WallsOBD
  • BathroomsISI marked
  • WindowsMS
  • Main doorHard wood

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 103, GurugramSector 103, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.9 km
  • Delhi–Gurugram–SNB RRTS6.3 km
  • Sohna Elevated Corridor (NH-248A)7.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is CHINTAMANIS registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/675/407/2023/19. Valid to 10 Nov 2026.

The source ↗
What is the possession timeline for CHINTAMANIS?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 11 Sep 2026. Its registration runs to 10 Nov 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around CHINTAMANIS?From the records · Map pin and road lines, read 6 Sep 2026

CHINTAMANIS is in Sector 103, Gurugram; the site address declared to HARERA is Sector 103,Vill Daultabad, Gurugram. In a straight line it is about 0.9 km from Dwarka Expressway, 6.3 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building CHINTAMANIS?From the records · HARERA, read 4 Nov 2026

CHINTAMANIS is a Aviana Greens Estates project, registered by its company AVIANA GREENS ESTATES PVT LTD.

The source ↗Aviana Greens Estates's projects and court record

The records

What the registers hold for CHINTAMANIS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/675/407/2023/19: Registered. Valid to 10 Nov 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 97 OF 2021 is on the DTCP register: Licence ends soon; the register prints its validity to 11 Nov 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 12 Nov 2021, building plans 13 Jan 2023.Declared to HARERA, read 29 Oct 2026
The court record of Aviana Greens Estates’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 10 Nov 2026. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 97 OF 2021 ends soon

    Named in this project’s application. Valid to 11 Nov 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 54 HARERA files, with the dates we read them
Registration no.
GGM/675/407/2023/19
Registration valid till
10 Nov 2026
Declared possession
11 Sept 2026

Declared by the promoter to HARERA

Land area
4.1875 (Acre) (16,946.21 sq m)
FAR
2.62 proposed of 2.62 permissible
licence
LICENCE NO 97 OF 2021 DATED 12-11-2021
Estimated project cost
₹308.60 crore
Cost of land
₹54.33 crore
Layout plan, declared approved (field 5a)
12 Nov 2021
Building plans, declared approved
13 Jan 2023
Construction to start
1 May 2023
Completion declared for
11 Sept 2026
Declared inventory · 10 types

Declared inventory — 10 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 76 units · 133.17 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 125.35 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 215.46 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 36 units · 112.51 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 172.08 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 36 units · 96.61 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 162.56 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 144 units · 92.28 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. LICENCE NO 97 OF 2021 DATED 12-11-2021 BY TOWN AND COUNTRY PLANNING — declared: already been obtained (12 Nov 2021)
On file with HARERA · 54 files

On file with HARERA (54)

Plans

Site plan

2 files
First Floor Level Site Plan5 Jun 2023Approved Site Plan5 Jun 2023

Layout plan

1 file
Latest Layout Plan5 Jun 2023

Zoning plan

1 file
Zoning Plan21 Dec 2022

Building plans

13 files
Tower A - 22ND, Terrace & Mumty Floor Plans & Area Diagram5 Jun 2023Tower A Section5 Jun 2023Tower C ELEVATIONS15 Jun 2023

Floor plans

12 files
Tower C1 & C2 - 19th & 20th Floor Plan & Area Diagram12 Jul 2023Tower's Unit Carpet Area Detail5 Jun 2023Tower D - Floor Plans & Area Diagram5 Jun 2023

Services

Sewerage and drainage

2 files
Sewerage Plan5 Jun 2023Storm Water Drainage Plan5 Jun 2023

Water supply

9 files
Tower A - Terrace Plan & Plumbing Layout5 Jun 2023Tower B - Terrace Plan & Plumbing Layout5 Jun 2023Domestic Water Supply5 Jun 2023

Electricity

1 file
Street Light Plan5 Jun 2023

Roads

1 file
Road Pavement Plan5 Jun 2023

Landscape and green areas

1 file
Landscape Plan5 Jun 2023

Service plans

3 files
Stilt Site Service Plan5 Jun 2023Solid Waste Management Plan5 Jun 2023Service Plans on the Layout21 Dec 2022

Approvals and clearances

DTCP licence

3 files
Addendum to the Registration Certificate-Additional License and Revision in Building Plans1 Apr 2026LOI5 Jun 2023Licence Copy with Land Schedule21 Dec 2022

Other NOCs and clearances

1 file
Airport Height Clearance5 Jun 2023

Money

Accounts and finance

2 files
Cash Flow Statement5 Jun 2023Non-Default Certificate from a CA5 Jun 2023

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit23 Jun 2023

Other filings

Other filings

1 file
Aviana BR-35 Jun 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

97 OF 2021 · Aviana Green Estates Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 11 Nov 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 22 Dec 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

97 OF 2021: 8 parcels, 4.1875 acres in all, in Daultabad (hadbast 53), tehsil Kadipur.

The licence register prints the same licensed area, 4.1875 acres.

  • 74//23/32 kanal 6 marla
  • 74//24/3/11 kanal 7 marla
  • 74//24/3/217 marla
  • 80//1/12 kanal
Show the other 4 parcels
  • 80//1/26 kanal
  • 80//108 kanal
  • 80//28 kanal
  • 80//3/15 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Daultabad (hadbast 53), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 74//23/3.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
First Floor Level Site Plan5 Jun 2023Approved Site Plan5 Jun 2023

Layout plan

1 file
Latest Layout Plan5 Jun 2023

Building plans

13 files
Tower A - 22ND, Terrace & Mumty Floor Plans & Area Diagram5 Jun 2023Tower A Section5 Jun 2023Tower C ELEVATIONS15 Jun 2023Tower C ELEVATIONS25 Jun 2023Tower A ELEVATIONS25 Jun 2023Tower B Section5 Jun 2023

Floor plans

12 files
Tower C1 & C2 - 19th & 20th Floor Plan & Area Diagram12 Jul 2023Tower's Unit Carpet Area Detail5 Jun 2023Tower D - Floor Plans & Area Diagram5 Jun 2023Tower B - Stilt Floor Plan & Area Diagram5 Jun 2023Tower B - 1st to 18th Floor Plans & Area Diagram5 Jun 2023Tower C1-C2 - Stilt, 1st to 18th Floor Plans & Area Diagram5 Jun 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (54 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2239 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Aviana Greens Estates

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.