As listed on godrejproperties.com (“INR 5.88 Cr. onwards”), read 23 Oct 2026. Bhumiq team price list, 16 Sep 2026: an asking rate, not a registry figure.

Possession 31 Mar 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 89, Gurugram1.7 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
270–1,726 sq ft
In m²about 25–160 m², as declared
Price, as listed
From ₹5.88 Cr
Asking rate
₹16,000 a sq ft of carpet
Bhumiq team price list, 16 Sep 2026
Registered by
GODREJ PROPERTIES LTDthe company that filed it, for Godrej Highview
Timeline
  1. 1 Feb 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Mar 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

1,474homes, 270 to 1,726 sq ft of carpet area
  • Under 1,000 sq ft270–986 sq ft586
  • 1,000–1,500 sq ft1,024–1,464 sq ft744
  • 1,500–2,000 sq ft1,507–1,726 sq ft144

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 7 rows of a single unit and 267 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside57,491 m² in all, by use
  • Other usesas the form names them: Area, Hardscape, Softscape22,500 m² · 39%
  • Roads11,226 m² · 20%
  • Apartment buildings7,529 m² · 13%
  • Pavements3,554 m² · 6%
  • Parking2,850 m² · 5%
  • Green belts2,666 m² · 5%
  • Electricity sub-station2,372 m² · 4%
  • Parks and playgrounds1,928 m² · 3%
  • Club house1,565 m² · 3%
  • Sewage and waste treatment1,300 m² · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenFloor: vitrified tiles wall: ceramic tiles 2'-0" above counter & oil bound distemper ceiling: oil bound distemper
  • Lifts3 in each tower- 2 passenger and 1 service
  • FloorsVitrified tiles / ceramic tiles
  • WallsAcrylic emulsion/ oil bound distemper
  • BathroomsAll provided with standard company make
  • WindowsPowder coated aluminum / UPVC
  • Main door(laminate finish flush doors/moulded shutter with wooden frame)(prehung- LVL with laminate)
  • Water storageUnderground waster tank & overhead water tank

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 89, GurugramSector 89, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.7 km
  • Delhi–Gurugram–SNB RRTS4.3 km
  • Sohna Elevated Corridor (NH-248A)8.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 8 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 7

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Godrej Zenith registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/799/531/2024/26. Valid to 31 Mar 2031.

The source ↗
What is the possession timeline for Godrej Zenith?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2031. Its registration runs to 31 Mar 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Godrej Zenith?From the records · Map pin and road lines, read 6 Sep 2026

Godrej Zenith is in Sector 89, Gurugram; the site address declared to HARERA is Sector 89, Gurugram, Haryana. In a straight line it is about 1.7 km from Dwarka Expressway, 4.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What does a home in Godrej Zenith cost, and how does that compare nearby?From the records · godrejproperties.com, read 23 Oct 2026; Bhumiq team price list, 16 Sep 2026

The developer's website, godrejproperties.com, lists homes from ₹5.88 Cr ("INR 5.88 Cr. onwards"). The Bhumiq team's price list has ₹16,000 a sq ft of carpet area (16 Sep 2026). Prices change; ask the developer for its current price list.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty

The records

What the registers hold for Godrej Zenith: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/799/531/2024/26: Registered. Valid to 31 Mar 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 151 OF 2023 is on the DTCP register, valid to 19 Jul 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 1 Feb 2024.Declared to HARERA, read 29 Oct 2026
The court record of Godrej Highview’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 112 HARERA files, with the dates we read them
Registration no.
GGM/799/531/2024/26
Registration valid till
31 Mar 2031
Declared possession
31 Mar 2031
Asking price (indicative)
₹16,000 / sq ft of carpet area

Bhumiq team price list · as of 16 Sept 2026 · a quoted rate, not a registry figure

Declared by the promoter to HARERA

Land area
14.20625 (Acre) (57,490.65 sq m)
FAR
3.59 proposed of 3.62 permissible
licence
151 OF 2023 dated 20.07.2023
Estimated project cost
₹2148.73 crore
Cost of land
₹319.66 crore
Building plans, declared approved
1 Feb 2024
Construction to start
1 Apr 2024
Completion declared for
31 Mar 2031
Declared inventory · 120 types

Declared inventory — 120 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 35 units · 90.75 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 34 units · 67.4 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 35 units · 86.59 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 34 units · 91.57 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 33 units · 67.03 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 35 units · 86.64 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 66 units · 86.84 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 69 units · 67.4 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 13

Statutory approvals, as declared

  • I. LETTER OF INTENT (LOI) — declared: already been obtained (13 Feb 2023)
  • II. LICENCE NO. 151 OF 2023 — declared: already been obtained (20 Jul 2023)
  • III. NOC FOR HEIGHT CLEARANCE — declared: already been obtained (16 Aug 2023)
  • IV. ASSURANCE OF WATER SUPPLY — declared: already been obtained (25 Aug 2023)
  • V. ASSURANCE OF ELECTRICAL LOAD — declared: already been obtained (25 Aug 2023)
  • VI. ASSURANCE OF SEWERAGE CONNECTION — declared: already been obtained (23 Aug 2023)
  • VII. ASSURANCE OF STORM WATER CONNECTION — declared: already been obtained (23 Aug 2023)
  • VIII. ASSURANCE OF WATER SUPPLY FOR CONSTRUCTION PURPOSE — declared: already been obtained (23 Aug 2023)
  • IX. APPROVAL OF FOREST NOC — declared: already been obtained (12 May 2023)
  • X. APPROVAL OF ARAVALI NOC — declared: already been obtained (28 Jul 2023)
  • XI. APPROVAL OF ENVIRONMENT CLEARANCE — declared: already been obtained (8 Dec 2023)
  • XII. ZONING PLAN — declared: already been obtained (21 Jul 2023)
  • XIII. BUILDING PLAN APPROVAL — declared: already been obtained (1 Feb 2024)
On file with HARERA · 112 files

On file with HARERA (112)

Plans

Site plan

2 files
Site Plan29 Feb 2024Approved Site Plan5 Feb 2024

Layout plan

2 files
Copy of Superimposed Demarcation Plan on Approved Layout Plan29 Feb 2024Latest Layout Plan31 Jan 2024

Zoning plan

1 file
Zoning Plan29 Feb 2024

Demarcation plan

1 file
Demarcation Plan29 Feb 2024

Building plans

45 files
TOWER3 Refuge (20TH and 30TH),TERRACE Floor and Oht Lvl Plan29 Feb 2024Commercial and Retail 13th Floor Plan and Terrace29 Feb 2024TOWER9 ELEVATION229 Feb 2024

Floor plans

35 files
School and EWS Typical Floor Plan - 5th to 20th Floor29 Feb 2024Commercial BASEMENT229 Feb 2024TOWER9 Ground Floor Plan29 Feb 2024

Services

Sewerage and drainage

3 files
Assurance STP Treated Water for Construction29 Feb 2024Approval of Sewerage Assurance18 Jan 2024Approval of Storm Water Assurance18 Jan 2024

Water supply

2 files
Approval of Water Assurance18 Jan 2024Approval of Supply of Treated Water for Construction18 Jan 2024

Electricity

2 files
Assurance of Electrical29 Feb 2024Approval of Electrical Assurance18 Jan 2024

Approvals and clearances

DTCP licence

3 files
LOI29 Feb 2024LC IV and Bilateral Agreements29 Feb 2024Licence Copy with Land Schedule18 Jan 2024

Environment clearance

1 file
Environment Clearance18 Jan 2024

Other NOCs and clearances

3 files
Forest NOC18 Jan 2024Aravali NOC18 Jan 2024NOC for Height Clearance18 Jan 2024

Land records

Land records

2 files
Revenue Record Entry of Licence and Collaboration29 Feb 2024NEC Hayatpur29 Feb 2024

Money

Accounts and finance

6 files
CA Certificate for Financial & Inventory Details29 Feb 2024Cash Flow Statement29 Feb 2024CA Certificate for Cost Incurred29 Feb 2024

The promoter’s papers

Declarations and affidavits

3 files
The Promoter’s Declaration on Affidavit29 Feb 2024Affidavit of Promoter Regarding Arrangement with the Bank of Master Account29 Feb 2024Bank Undertaking29 Feb 2024

Other filings

Other filings

1 file
Community Building Staircase Exit Width Calculations29 Feb 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

151 OF 2023 · Godrej Properties Ltd. · GURGAON-MANESAR

Licence valid to 19 Jul 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 9 Feb 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

151 OF 2023: 26 parcels, 14.2063 acres in all, in Hayatpur (hadbast 114), tehsil Harsaru.

The licence register prints the same licensed area, 14.2063 acres.

  • 68//22/14 kanal 4 marla
  • 68//22/23 kanal 2 marla
  • 68//23/12 kanal 11 marla
  • 71//2/1/23 kanal 15 marla
Show the other 22 parcels
  • 71//2/2/21 kanal 13 marla
  • 71//3/1/11 kanal 13 marla
  • 71//3/1/3/19 marla
  • 71//9/1/11 kanal 2 marla
  • 68//12/11 kanal 16 marla
  • 68//12/26 kanal 4 marla
  • 68//198 kanal
  • 69//12/25 kanal 6 marla
  • 69//138 kanal
  • 69//14/14 kanal 13 marla
  • 69//158 kanal
  • 69//16/27 kanal 18 marla
  • 69//17/12 kanal 8 marla
  • 69//19/13 kanal 10 marla
  • 69//4/34 kanal
  • 69//6/11 kanal 4 marla
  • 69//6/26 kanal 16 marla
  • 69//78 kanal
  • 68//118 kanal
  • 68//20/13 kanal 7 marla
  • 68//9/24 kanal 13 marla
  • rectangle 68, kila 10/2/23 kanal 9 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Hayatpur (hadbast 114), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 68//22/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹7,000 per sq ft

Sector 89, collector rates effective 1 Apr 2026, Harsaru tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “Godrej Zenith”, by M/s. Godrej Properties Limited, code Gurgaon-0624-005030, approved 2024.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan29 Feb 2024Approved Site Plan5 Feb 2024

Layout plan

2 files
Copy of Superimposed Demarcation Plan on Approved Layout Plan29 Feb 2024Latest Layout Plan31 Jan 2024

Building plans

45 files
TOWER3 Refuge (20TH and 30TH),TERRACE Floor and Oht Lvl Plan29 Feb 2024Commercial and Retail 13th Floor Plan and Terrace29 Feb 2024TOWER9 ELEVATION229 Feb 2024Commercial Elevation29 Feb 2024Ews,school Section29 Feb 2024Commercial Section29 Feb 2024

Floor plans

35 files
School and EWS Typical Floor Plan - 5th to 20th Floor29 Feb 2024Commercial BASEMENT229 Feb 2024TOWER9 Ground Floor Plan29 Feb 2024BASEMENT129 Feb 2024Commercial and Retail Second Floor Plan29 Feb 2024TOWER1 Ground Floor Plan29 Feb 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (112 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2772 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Godrej Highview

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

From ₹5.88 CrBook a site visitAsk

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.