M3M SOULITUDE CENTRAL

by Adhikaansh Realtors Private Limited ,aawam Residency · Sector 89, Gurugram

Not on our price list yet

Possession 31 Jul 2030 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 89, Gurugram1.7 km from Dwarka Expressway, in a straight line
Carpet area
367–944 sq ft
In m²about 34–88 m², as declared
Registered by
AAWAM RESIDENCY PRIVATE LIMITEDthe company that filed it, for Adhikaansh Realtors Private Limited ,aawam Residency
Timeline
  1. 10 Mar 2025Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 28 Nov 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Jul 2030Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

22homes, 367 to 944 sq ft of carpet area
  • Under 1,000 sq ft367–944 sq ft22

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 8 rows of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside0.44 acres in all, by use
  • Apartment buildings0.25 acres · 57%
  • Roads0.17 acres · 39%
  • Parking0.01 acres · 2%
  • Other uses0.01 acres · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningProvision only
  • LiftsPassenger and service lift as per vertical traffic
  • FloorsBARE R.C.C SLAB
  • WallsPlaster / white finish
  • WindowsAluminium frame
  • Main doorAluminium and glass
  • Electrical fittingsLED type fittings in common area only
  • Water storageUGT

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 89, GurugramSector 89, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.7 km
  • Delhi–Gurugram–SNB RRTS4.3 km
  • Sohna Elevated Corridor (NH-248A)8.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 9 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 5

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is M3M SOULITUDE CENTRAL registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1041/773/2026/13. Valid to 31 Jul 2030.

The source ↗
What is the possession timeline for M3M SOULITUDE CENTRAL?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Jul 2030. Its registration runs to 31 Jul 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around M3M SOULITUDE CENTRAL?From the records · Map pin and road lines, read 6 Sep 2026

M3M SOULITUDE CENTRAL is in Sector 89, Gurugram; the site address declared to HARERA is Sector 89. In a straight line it is about 1.7 km from Dwarka Expressway, 4.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building M3M SOULITUDE CENTRAL?From the records · HARERA, read 4 Nov 2026

M3M SOULITUDE CENTRAL is a Adhikaansh Realtors Private Limited ,aawam Residency project, registered by its company AAWAM RESIDENCY PRIVATE LIMITED.

The source ↗Adhikaansh Realtors Private Limited ,aawam Residency's projects and court record

The records

What the registers hold for M3M SOULITUDE CENTRAL: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1041/773/2026/13: Registered. Valid to 31 Jul 2030.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 32 OF 2021 is on the DTCP register: Licence lapsed; the register prints its validity to 2 Jul 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 10 Mar 2025, building plans 28 Nov 2025.Declared to HARERA, read 29 Oct 2026
The court record of Adhikaansh Realtors Private Limited ,aawam Residency’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 32 OF 2021 lapsed

    Named in this project’s application. Valid to 2 Jul 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 45 HARERA files, with the dates we read them
Registration no.
GGM/1041/773/2026/13
Registration valid till
31 Jul 2030
Declared possession
31 Jul 2030

Declared by the promoter to HARERA

Land area
0.44 (Acre) (1,780.62 sq m)
FAR
1.46 proposed of 1.5 permissible
licence
License No- 102 of 2022 dated 27.07.2022 and License No- 32 of 2021 dated 03.07.2021
Estimated project cost
₹33.25 crore
Cost of land
₹3.40 crore
Layout plan, declared approved (field 5a)
10 Mar 2025
Building plans, declared approved
28 Nov 2025
Construction to start
1 Jan 2026
Completion declared for
31 Jul 2030
Declared inventory · 22 types

Declared inventory — 22 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 1 unit · 10.03 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 13.75 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 17.47 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 19.04 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 21.83 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 22.76 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 34.1 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 2 units · 35.3 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. LICENSE APPROVAL — declared: already been obtained (27 Jul 2022)
  • II. LICENSE APPROVAL — declared: already been obtained (3 Jul 2021)
  • III. FOREST NOC — declared: already been obtained (24 Mar 2021)
  • IV. ARAVALLI NOC — declared: already been obtained (13 Apr 2021)
  • V. BUILDING PLANS APPROVAL — declared: already been obtained (28 Nov 2025)
On file with HARERA · 45 files

On file with HARERA (45)

Plans

Site plan

1 file
Approved Site Plan23 Feb 2026

Layout plan

1 file
Latest Layout Plan23 Feb 2026

Zoning plan

1 file
Zoning Plan23 Feb 2026

Building plans

3 files
Building Plan Approval23 Feb 2026Front Elevation and Section23 Feb 2026Third and Terrace Floor Plans23 Feb 2026

Floor plans

3 files
First and Second Floor Plans23 Feb 2026Basement Plan and Ground Floor Plans23 Feb 2026Parking Plan23 Feb 2026

Services

Sewerage and drainage

4 files
Storm Water Layout Plan23 Feb 2026Assurance of Storm Water23 Feb 2026Assurance for Sewerage Connection23 Feb 2026Sewerage Layout Plan23 Feb 2026

Water supply

3 files
Domestic Water Supply Layout23 Feb 2026Assurance Drinking Water23 Feb 2026Assurance Construction Water23 Feb 2026

Electricity

1 file
Power Sanction Letter23 Feb 2026

Roads

1 file
Road Layout Plan23 Feb 2026

Service plans

1 file
Service Plan Approval23 Feb 2026

Approvals and clearances

DTCP licence

2 files
LOI23 Feb 2026Licence Copy with Land Schedule5 Jan 2026

Environment clearance

1 file
Approved Environmental Clearance23 Feb 2026

Fire safety

1 file
Fire Scheme Approval23 Feb 2026

Other NOCs and clearances

2 files
Forest NOC23 Feb 2026Road Access Permission23 Feb 2026

Land records

Land records

5 files
Shajra23 Feb 2026Revenue Record Entry of Licence and Collaboration23 Feb 2026Non Encumbrance Certificate23 Feb 2026

Sales papers

Allotment and sale agreements

3 files
Draft Allotment Letter23 Feb 2026Draft Conveyance Deed23 Feb 2026Draft BBA23 Feb 2026

Money

Accounts and finance

6 files
Cash Flow Statement23 Feb 2026CA Net Worth Certificate23 Feb 2026CA Certificate Cost Incurred23 Feb 2026

Timeline and progress

Construction schedule

1 file
PERT Chart23 Feb 2026

The promoter’s papers

Declarations and affidavits

5 files
Affidavit Powerline Shifting23 Feb 2026Draft Application Form23 Feb 2026Affidavit Tree Cutting23 Feb 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

102 OF 2022 · Adhikaansh Realtors Private Limited · GURGAON-MANESAR

Licence valid to 26 Jul 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

32 OF 2021 · Adhikaansh Realtors Private Limited · GURGAON-MANESAR

Licence valid to 2 Jul 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 6 Jan 2026 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

102 OF 2022: 9 parcels, 5.125 acres in all, in Hayatpur (hadbast 114), tehsil Harsaru.

The licence register prints the same licensed area, 5.125 acres.

  • 60//1/16 kanal 2 marla
  • 60//10/21 marla
  • 60//2/11 kanal 6 marla
  • 28//11/23 kanal 7 marla
Show the other 5 parcels
  • 28//19/23 kanal 3 marla
  • 28//208 kanal
  • 28//217 kanal 7 marla
  • 28//226 kanal 19 marla
  • 29//25/24 kanal 15 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

32 OF 2021: 84 parcels, 52.275 acres in all, in Hayatpur (hadbast 114), tehsil Harsaru.

The licence register prints the same licensed area, 52.275 acres.

  • 6//128 kanal
  • 6//138 kanal
  • 6//14/16 kanal 7 marla
  • 6//14/21 kanal 13 marla
Show the other 80 parcels
  • 6//15/11 kanal 14 marla
  • 6//15/2/21 kanal 13 marla
  • 6//168 kanal
  • 6//178 kanal
  • 6//18/17 kanal
  • 6//19/16 kanal
  • 6//20/16 kanal
  • 6//248 kanal
  • 6//25/14 kanal
  • 6//25/24 kanal
  • 6//47 kanal 7 marla
  • 6//5/11 kanal 7 marla
  • 6//6/1/21 kanal 10 marla
  • 6//6/2/112 marla
  • 6//78 kanal
  • 17//11/26 kanal 18 marla
  • 17//128 kanal
  • 17//138 kanal
  • 17//148 kanal
  • 17//15/14 kanal 16 marla
  • 17//15/23 kanal 4 marla
  • 17//16/14 kanal 8 marla
  • 17//16/23 kanal 12 marla
  • 17//17/12 kanal 2 marla
  • 17//188 kanal
  • 17//197 kanal
  • 17//191 kanal
  • 17//23/119 marla
  • 17//24/12 kanal 2 marla
  • 17//25/11 kanal
  • 17//25/22 kanal
  • 17//25/35 kanal
  • 17//3/25 kanal 9 marla
  • 17//4/12 kanal 17 marla
  • 17//4/23 kanal 2 marla
  • 17//5/12 kanal 12 marla
  • 17//5/25 kanal 8 marla
  • 17//6/12 kanal 11 marla
  • 17//6/25 kanal 9 marla
  • 17//78 kanal
  • 17//87 kanal 14 marla
  • 28//148 kanal
  • 28//17/24 kanal
  • 28//18/17 kanal 11 marla
  • 28//18/29 marla
  • 28//23/13 kanal 19 marla
  • 28//24/1/11 kanal 12 marla
  • 28//3/12 kanal 13 marla
  • 28//48 kanal
  • 28//5/15 kanal 4 marla
  • 28//6/2/13 kanal
  • 28//6/2/23 kanal 17 marla
  • 28//77 kanal 11 marla
  • 29//13/19 marla
  • 29//13/34 kanal 17 marla
  • 29//14/17 kanal 19 marla
  • 29//16/1/23 kanal
  • 29//16/2/24 kanal 2 marla
  • 29//178 kanal
  • 29//18/15 kanal 6 marla
  • 29//3/24 kanal 18 marla
  • 29//48 kanal
  • 29//5/14 kanal
  • 29//5/2/12 kanal
  • 29//5/2/22 kanal
  • 29//6/1/14 kanal 14 marla
  • 29//7/37 kanal 7 marla
  • 29//8/17 kanal 6 marla
  • 18//118 kanal
  • 18//13/218 marla
  • 18//178 kanal
  • 18//187 kanal 12 marla
  • 18//198 kanal
  • 18//208 kanal
  • 18//21/14 kanal
  • 18//21/24 kanal
  • 18//22/16 kanal
  • 18//237 kanal 12 marla
  • 18//24/16 kanal
  • 6//23/2/24 kanal 2 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Hayatpur (hadbast 114), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 60//1/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan23 Feb 2026

Layout plan

1 file
Latest Layout Plan23 Feb 2026

Building plans

3 files
Building Plan Approval23 Feb 2026Front Elevation and Section23 Feb 2026Third and Terrace Floor Plans23 Feb 2026

Floor plans

3 files
First and Second Floor Plans23 Feb 2026Basement Plan and Ground Floor Plans23 Feb 2026Parking Plan23 Feb 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (45 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3913 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Adhikaansh Realtors Private Limited ,aawam Residency

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.