About this project

Key facts

Location
Sector 89, Gurugram1.7 km from Dwarka Expressway, in a straight linePrices and what changed
Registered
23 Jan 2019
Registered by
RADHA ESTATES PVT. LTD. ,ORRIS INFRASTRUCTURES PVT. LTD. & THREE C SHELTERS PVT. LTD.the company that filed it, for Radha Estates
Timeline
  1. 23 Jan 2019Registered with HARERAHARERA, read 5 Nov 2026
  2. 31 Dec 2020Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenCeramic tiles on floor and walls
  • LiftsLifts from KONE and johnson
  • FloorsVetrified tiles and ceramic tiles
  • WallsOBD paint
  • BathroomsChina WARE from hindware and CP fitting from jaguar
  • WindowsUPVC
  • Main doorVeneered flush door (38MM)
  • Electrical fittingsModular switches from C&S and ABB

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 89, GurugramSector 89, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.7 km
  • Delhi–Gurugram–SNB RRTS4.3 km
  • Sohna Elevated Corridor (NH-248A)8.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Greenopolis registered with HARERA?From the records · HARERA, read 5 Nov 2026

HARERA lists it as GGM/311/43/2019/05, registered on 23 Jan 2019. The register’s record shows an end date of 31 Dec 2020. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for Greenopolis?From the records · HARERA, read 5 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2020. Its registration runs to 31 Dec 2020; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Greenopolis?From the records · Map pin and road lines, read 6 Sep 2026

Greenopolis is in Sector 89, Gurugram; the site address declared to HARERA is Sector-89, Manesar, Gurugram. In a straight line it is about 1.7 km from Dwarka Expressway, 4.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Greenopolis?From the records · HARERA, read 5 Nov 2026

Greenopolis is a Radha Estates project, registered by its company RADHA ESTATES PVT. LTD. ,ORRIS INFRASTRUCTURES PVT. LTD. & THREE C SHELTERS PVT. LTD..

The source ↗Radha Estates's projects and court record

The records

What the registers hold for Greenopolis: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/311/43/2019/05: Registration lapsed. The register’s record shows an end date of 31 Dec 2020.HARERA, read 5 Nov 2026 · See it on HARERA ↗
  • Land licence 115 OF 2011 is on the DTCP register: Licence lapsed; the register prints its validity to 22 Dec 2024.DTCP, read 3 Nov 2026
The court record of Radha Estates’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 115 OF 2011 lapsed

    Named in this project’s application. Valid to 22 Dec 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Dec 2020. HARERA Gurugram, read 5 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 6 HARERA files, with the dates we read them
Registration no.
GGM/311/43/2019/05
Registration date
23 Jan 2019
Registration valid till
31 Dec 2020
Declared possession
31 Dec 2020

Declared by the promoter to HARERA

Land area
37.218 (Acre) (1,50,615.9 sq m)
FAR
1.75 proposed
licence
115 of 2011 renewed upto 22/12/2019
Estimated project cost
₹1197.00 crore
Cost of land
₹115.71 crore
Construction to start
1 Dec 2013
Completion declared for
31 Dec 2020
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. ENVIRONMENT CLEARANCE — declared: already been obtained (4 Sept 2013)
On file with HARERA · 6 files

On file with HARERA (6)

Plans

Site plan

1 file
Approved Site Plan22 Jan 2019

Layout plan

1 file
Latest Layout Plan22 Jan 2019

Services

Service plans

1 file
Service Plans on the Layout22 Jan 2019

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule22 Jan 2019

Money

Accounts and finance

1 file
Non-Default Certificate from a CA22 Jan 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit22 Jan 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

115 OF 2011 · Orris Infrastructure · GURGAON-MANESAR

Licence valid to 22 Dec 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 22 Jan 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 5 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

115 OF 2011: 92 parcels, 47.2188 acres in all, in Badha (hadbast 113, tehsil Manesar) and Hayatpur (hadbast 114, tehsil Harsaru).

The licence register prints the same licensed area, 47.22 acres.

  • 3//14 kanal 7 marlaBadha (113)
  • 3//10/1/1/16 kanal 17 marlaBadha (113)
  • 3//10/1/29 marlaBadha (113)
  • 3//10/218 marlaBadha (113)
Show the other 88 parcels
  • 3//118 kanalBadha (113)
  • 3//128 kanalBadha (113)
  • 3//198 kanalBadha (113)
  • 3//208 kanalBadha (113)
  • 3//9/1/19 kanal 6 marlaBadha (113)
  • 3//9/1/29 marlaBadha (113)
  • 3//9/218 marlaBadha (113)
  • 4//14min3 kanal 6 marlaBadha (113)
  • 4//158 kanalBadha (113)
  • 4//16min7 kanal 7 marlaBadha (113)
  • 4//17min5 marlaBadha (113)
  • 56//24/24 kanal 3 marlaHayatpur (114)
  • 56//258 kanalHayatpur (114)
  • 57//54 kanal 11 marlaHayatpur (114)
  • 58//18 kanalHayatpur (114)
  • 58//102 kanal 9 marlaHayatpur (114)
  • 58//13/12 kanal 13 marlaHayatpur (114)
  • 58//13/2/111 marlaHayatpur (114)
  • 58//13/2/21 kanal 3 marlaHayatpur (114)
  • 58//14/12 kanalHayatpur (114)
  • 58//14/2/16 kanal 2 marlaHayatpur (114)
  • 58//14/2/311 marlaHayatpur (114)
  • 58//15/1/11 kanal 14 marlaHayatpur (114)
  • 58//15/2/11 kanal 16 marlaHayatpur (114)
  • 58//15/2/316 marlaHayatpur (114)
  • 58//15/3/112 marlaHayatpur (114)
  • 58//15/3/31 kanalHayatpur (114)
  • 58//16/12 kanal 7 marlaHayatpur (114)
  • 58//16/23 kanal 2 marlaHayatpur (114)
  • 58//16/3/21 kanal 6 marlaHayatpur (114)
  • 58//2/24 kanalHayatpur (114)
  • 58//3/11 kanal 16 marlaHayatpur (114)
  • 58//3/25 kanal 16 marlaHayatpur (114)
  • 58//4/24 kanalHayatpur (114)
  • 58//5/14 kanalHayatpur (114)
  • 58//5/24 kanalHayatpur (114)
  • 58//6/15 kanal 18 marlaHayatpur (114)
  • 58//6/319 marlaHayatpur (114)
  • 58//77 kanal 11 marlaHayatpur (114)
  • 58//8/11 kanal 15 marlaHayatpur (114)
  • 58//8/29 marlaHayatpur (114)
  • 58//8/34 kanal 18 marlaHayatpur (114)
  • 58//97 kanal 9 marlaHayatpur (114)
  • 59//117 kanal 11 marlaHayatpur (114)
  • 59//127 kanal 11 marlaHayatpur (114)
  • 59//14/25 kanal 10 marlaHayatpur (114)
  • 59//14/22 marlaHayatpur (114)
  • 59//158 kanalHayatpur (114)
  • 59//168 kanalHayatpur (114)
  • 59//178 kanalHayatpur (114)
  • 59//18/13 kanal 16 marlaHayatpur (114)
  • 59//24/15 kanal 2 marlaHayatpur (114)
  • 59//258 kanalHayatpur (114)
  • 59//48 kanalHayatpur (114)
  • 59//58 kanalHayatpur (114)
  • 59//68 kanalHayatpur (114)
  • 59//7/12 kanal 2 marlaHayatpur (114)
  • 59//8/11 kanal 18 marlaHayatpur (114)
  • 59//98 kanalHayatpur (114)
  • 69//1/12 kanalHayatpur (114)
  • 69//10/1/33 kanal 4 marlaHayatpur (114)
  • 69//11/1/17 marlaHayatpur (114)
  • 69//11/1/33 kanal 18 marlaHayatpur (114)
  • 69//11/2/2/22 kanal 4 marlaHayatpur (114)
  • 69//14/23 kanal 7 marlaHayatpur (114)
  • 69//17/25 kanalHayatpur (114)
  • 69//17/212 marlaHayatpur (114)
  • 69//188 kanalHayatpur (114)
  • 69//19/24 kanal 2 marlaHayatpur (114)
  • 69//20/16 kanalHayatpur (114)
  • 69//20/22 kanalHayatpur (114)
  • 69//213 kanal 18 marlaHayatpur (114)
  • 69//22/14 kanal 19 marlaHayatpur (114)
  • 69//22/22 kanal 12 marlaHayatpur (114)
  • 69//238 kanalHayatpur (114)
  • 69//247 kanal 15 marlaHayatpur (114)
  • 69//245 marlaHayatpur (114)
  • 69//25/17 kanal 16 marlaHayatpur (114)
  • 60//11/14 kanal 13 marlaHayatpur (114)
  • 60//11/23 kanal 7 marlaHayatpur (114)
  • 60//20/21 kanal 6 marlaHayatpur (114)
  • 60//21/16 kanal 8 marlaHayatpur (114)
  • 60//21/21 kanal 12 marlaHayatpur (114)
  • 60//22/1/14 marlaHayatpur (114)
  • 70//21 kanal 5 marlaHayatpur (114)
  • 70//3/13 kanal 15 marlaHayatpur (114)
  • 70//3/2/19 marlaHayatpur (114)
  • 70//4/11 kanal 16 marlaHayatpur (114)

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village you want: Badha (hadbast 113, tehsil Manesar) or Hayatpur (hadbast 114, tehsil Harsaru). The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 3//1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹7,000 per sq ft

Sector 89, collector rates effective 1 Apr 2026, Harsaru tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan22 Jan 2019

Layout plan

1 file
Latest Layout Plan22 Jan 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (6 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/389 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Radha Estates

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.