Skip to content

INDEPENDENT FLOORS AT DLF ALAMEDA, SEC 73

by DLF Home Developers · Sector 73, Gurugram

Not on our price list yet

Possession 24 Nov 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 73, Gurugram2.1 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
839–3,144 sq ft
In m²about 78–292 m², as declared
Registered by
DLF HOME DEVELOPERS LIMITEDthe company that filed it, for DLF Home Developers
Timeline
  1. 27 Aug 2018Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 14 Sep 2021Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 24 Nov 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

116homes, 839 to 3,144 sq ft of carpet area
  • Under 1,000 sq ft839–995 sq ft8
  • 1,000–1,500 sq ft1,015–1,295 sq ft28
  • 2,000–2,500 sq ft2,067–2,470 sq ft60
  • 2,500–3,000 sq ft2,770–2,776 sq ft16
  • 3,000 sq ft and above3,144 sq ft4

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside11,243 m² in all, by use
  • Apartment buildings11,243 m² · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningIn living, dining & bedrooms
  • KitchenWhite WASH / OBD
  • Kitchen appliancesModular cabinets
  • LiftsBranded make
  • WardrobesModular wardrobes of standard make in bedrooms (except in S. room)
  • FloorsIPS flooring / tiles / marble / granite
  • WallsWhite WASH / OBD
  • WindowsSingle glass unit with clear glass UPVC frames and shutters in habitable rooms. clear/ frosted glass in toilets

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 73, GurugramSector 73, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS2.1 km
  • Dwarka ExpresswayOpen, 17 Aug 20252.5 km
  • Sohna Elevated Corridor (NH-248A)2.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 11 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 7
  • Registered, no OC or CC yet: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is INDEPENDENT FLOORS AT DLF ALAMEDA, SEC 73 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/491/223/2021/59. Ended 24 Nov 2024. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for INDEPENDENT FLOORS AT DLF ALAMEDA, SEC 73?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 24 Nov 2024. Its registration runs to 24 Nov 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around INDEPENDENT FLOORS AT DLF ALAMEDA, SEC 73?From the records · Map pin and road lines, read 6 Sep 2026

INDEPENDENT FLOORS AT DLF ALAMEDA, SEC 73 is in Sector 73, Gurugram; the site address declared to HARERA is Sector 73. In a straight line it is about 2.1 km from Delhi–Gurugram–SNB RRTS, 2.5 km from Dwarka Expressway and 2.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building INDEPENDENT FLOORS AT DLF ALAMEDA, SEC 73?From the records · HARERA, read 4 Nov 2026

INDEPENDENT FLOORS AT DLF ALAMEDA, SEC 73 is a DLF Home Developers project, registered by its company DLF HOME DEVELOPERS LIMITED.

The source ↗DLF Home Developers's projects and court record

The records

What the registers hold for INDEPENDENT FLOORS AT DLF ALAMEDA, SEC 73: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/491/223/2021/59: Registration expired. Ended 24 Nov 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 88 OF 2010 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 27 Oct 2018.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 27 Aug 2018, building plans 14 Sep 2021.Declared to HARERA, read 29 Oct 2026
The court record of DLF Home Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 24 Nov 2024. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 88 OF 2010 validity ended

    Named in this project’s application. Valid to 27 Oct 2018. The register links a completion certificate (LC-IX), dated 10 Mar 2025, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Licence 109 OF 2012 validity ended

    Named in this project’s application. Valid to 25 Oct 2023. The register links a completion certificate (LC-IX), dated 10 Mar 2025, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 17 HARERA files, with the dates we read them
Registration no.
GGM/491/223/2021/59
Registration valid till
24 Nov 2024
Declared possession
24 Nov 2024

Declared by the promoter to HARERA

Land area
2.78 (Acre) (11,250.26 sq m)
FAR
2.42 proposed of 2.4 permissible
licence
1. Lic No 88 of 2010 dt 28.10.2010 for 100.506 acres. Part Completion Certificate for an area of 107.512 acres has been granted on 01.05.2013 2. Lic. No. 21 of 2012 dt. 20.03.2012 for 7.006 acres. Part Completion Certificate for an area of 107.512 acres has been granted on 01.05.2013 3. Lic. No. 109 of 2012 dt. 26.10.2012 for 3.9 acres. Part Completion Certificate for an area of 3.9 acres has been granted on 28.06.2017 4. Lic. No. 81 of 2018 dt. 01.12.2018 for 2.425 acres
Estimated project cost
₹189.03 crore
Cost of land
₹12.44 crore
Layout plan, declared approved (field 5a)
27 Aug 2018
Building plans, declared approved
14 Sept 2021
Construction to start
25 Dec 2021
Completion declared for
24 Nov 2024
Declared inventory · 18 types

Declared inventory — 18 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 40 units · 225.11 sq m carpet · 10 towers · one flat
  • Apartment/Shops/Other Buildings · 4 units · 228.69 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 229.44 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 257.34 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 12 units · 257.9 sq m carpet · 3 towers · one flat
  • Apartment/Shops/Other Buildings · 4 units · 77.91 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 114.39 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 120.33 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. ZONING PLAN — declared: already been obtained (18 Mar 2020)
  • II. FOREST NOC — declared: already been obtained (30 Jul 2021)
  • III. LIC NO. 81 OF 2018 AREA 2.425 ACRES — declared: already been obtained (1 Dec 2018)
  • IV. SERVICE PLAN APPROVAL FOR ACRE 111.442 — declared: already been obtained (11 Sept 2014)
  • V. SERVICE PLAN APPROVAL FOR 2.425 ACRE — declared: already been obtained (16 Dec 2019)
  • VI. LIC NO. 21 OF 2012 AREA 7.006 ACRES — declared: already been obtained (20 Mar 2012)
  • VII. ENVIRONMENTAL CLARENCE APPROVAL — declared: applied for but yet to receive (16 Jul 2021)
  • VIII. LIC NO. 109 OF 2012 AREA 3.9 ACRES — declared: applied for but yet to receive (29 Sept 2020)
  • IX. LIC NO.88 OF 2010 AREA 107.512 ACRES — declared: applied for but yet to receive (29 Sept 2020)
  • X. NATURAL CONSERVATION ZONE NOC — declared: applied for but yet to receive (1 Jul 2021)
On file with HARERA · 17 files

On file with HARERA (17)

Plans

Site plan

1 file
Approved Site Plan17 Aug 2021

Layout plan

1 file
Latest Layout Plan17 Aug 2021

Zoning plan

1 file
Zoning Plan17 Aug 2021

Demarcation plan

1 file
Demarcation Plan17 Aug 2021

Building plans

4 files
Approved Building Plans, Full Set21 Sept 2021Building Drawings- 121 Sept 2021Building Drawings- 221 Sept 2021Building Drawings- 321 Sept 2021

Services

Service plans

1 file
Service Plans on the Layout17 Aug 2021

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded29 Nov 2024

DTCP licence

1 file
Licence Copy with Land Schedule17 Aug 2021

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration21 Sept 2021

Money

Accounts and finance

3 files
Cash Flow Statement21 Sept 2021CA Certificate on the Application’s Figures17 Aug 2021Non-Default Certificate from a CA17 Aug 2021

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit17 Aug 2021

Other filings

Other filings

1 file
Transfer Deed21 Sept 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 4 DTCP licences named on the application

88 OF 2010 · DLF Home Developers Ltd. · GURGAON-MANESAR

Licence valid to 27 Oct 2018

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

21 OF 2012 · DLF Home Developers Ltd. · GURGAON-MANESAR

Licence valid to 19 Mar 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

109 OF 2012 · DLF Home Developers Ltd. · GURGAON-MANESAR

Licence valid to 25 Oct 2023

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

81 OF 2018 · DLF Home Developers Ltd. · GURGAON-MANESAR

Licence valid to 30 Nov 2031

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 17 Aug 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 4 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

88 OF 2010: 141 parcels, 100.5062 acres in all, in Bagampur khatola (hadbast 101), tehsil Kadipur.

The licence register prints the same licensed area, 100.51 acres.

  • 50//108 kanal
  • 50//11min4 kanal 3 marla
  • 50//12/1min1 kanal 2 marla
  • 50//12/2min2 kanal 14 marla
Show the other 137 parcels
  • 50//13min4 kanal 3 marla
  • 50//14min6 kanal 6 marla
  • 50//15min6 kanal 9 marla
  • 50//28 kanal
  • 50//38 kanal
  • 50//47 kanal 10 marla
  • 50//410 marla
  • 50//58 kanal
  • 50//68 kanal
  • 50//78 kanal
  • 50//88 kanal
  • 50//98 kanal
  • 24//14/15 kanal 4 marla
  • 24//16/22 kanal 9 marla
  • 24//176 kanal 13 marla
  • 24//18/13 kanal 12 marla
  • 24//23/24 kanal 8 marla
  • 24//4/2/25 kanal
  • 24//5/1/22 kanal
  • 24//5/25 kanal 12 marla
  • 24//7min7 kanal 18 marla
  • 39//1/12 kanal 13 marla
  • 39//1/25 kanal 7 marla
  • 39//108 kanal
  • 39//118 kanal
  • 39//128 kanal
  • 39//138 kanal
  • 39//148 kanal
  • 39//158 kanal
  • 39//168 kanal
  • 39//178 kanal
  • 39//188 kanal
  • 39//19/16 marla
  • 39//19/27 kanal 11 marla
  • 39//28 kanal
  • 39//218 kanal
  • 39//228 kanal
  • 39//238 kanal
  • 39//24/16 kanal 5 marla
  • 39//258 kanal
  • 39//3/14 kanal
  • 39//3/24 kanal
  • 39//48 kanal
  • 39//57 kanal 10 marla
  • 39//510 marla
  • 39//68 kanal
  • 39//77 kanal 10 marla
  • 39//710 marla
  • 39//8/14 kanal
  • 39//8/24 kanal
  • 39//98 kanal
  • 35//128 kanal
  • 35//138 kanal
  • 35//148 kanal
  • 35//158 kanal
  • 35//168 kanal
  • 35//178 kanal
  • 35//188 kanal
  • 35//198 kanal
  • 35//21min7 kanal 15 marla
  • 35//228 kanal
  • 35//238 kanal
  • 35//248 kanal
  • 35//258 kanal
  • 35//38 kanal
  • 35//48 kanal
  • 35//58 kanal
  • 35//68 kanal
  • 35//78 kanal
  • 35//88 kanal
  • 35//9min6 kanal 18 marla
  • 36//128 kanal
  • 36//138 kanal
  • 36//145 kanal 17 marla
  • 36//18/2/110 marla
  • 36//18/2/27 kanal 2 marla
  • 36//198 kanal
  • 36//2/2/13 kanal 6 marla
  • 36//2/2/214 marla
  • 36//207 kanal 12 marla
  • 36//217 kanal 12 marla
  • 36//228 kanal
  • 36//23/17 kanal 8 marla
  • 36//3/116 marla
  • 36//3/25 kanal 5 marla
  • 36//71 kanal 10 marla
  • 36//8/15 kanal 15 marla
  • 36//8/22 kanal 5 marla
  • 36//9/13 kanal
  • 36//9/25 kanal
  • 38//17 kanal 12 marla
  • 38//107 kanal 12 marla
  • 38//117 kanal 12 marla
  • 38//13/13 kanal 16 marla
  • 38//14min7 kanal 18 marla
  • 38//15min10 marla
  • 38//17min4 kanal 14 marla
  • 38//28 kanal
  • 38//20/26 kanal 15 marla
  • 38//23/2/26 marla
  • 38//24min2 kanal
  • 38//38 kanal
  • 38//4/12 kanal 6 marla
  • 38//4/25 kanal 14 marla
  • 38//78 kanal
  • 38//88 kanal
  • 38//9/15 kanal 18 marla
  • 38//9/22 kanal 2 marla
  • 23//1/17 kanal 5 marla
  • 23//1/215 marla
  • 23//12/31 kanal 5 marla
  • 23//19/1/23 kanal 6 marla
  • 23//218 marla
  • 23//22/2/1/11 kanal 2 marla
  • 23//22/2/25 kanal 3 marla
  • 23//23/21 kanal 19 marla
  • 22//105 kanal 2 marla
  • 22//11/14 kanal 11 marla
  • 22//11/21 kanal 11 marla
  • 22//206 kanal 18 marla
  • 22//218 kanal
  • 49//14min4 kanal 3 marla
  • 49//15min4 kanal 3 marla
  • 49//48 kanal
  • 49//58 kanal
  • 49//68 kanal
  • 49//78 kanal
  • 51//3/26 marla
  • 51//4min10 marla
  • 21//15min4 kanal 8 marla
  • 21//16min6 kanal 18 marla
  • 21//25/11 kanal 7 marla
  • 21//25/26 kanal 13 marla
  • 39//24/21 kanal 6 marla
  • 24//18/2min2 kanal 5 marla
  • 24//23/13 kanal 12 marla
  • 40//158 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

21 OF 2012: 13 parcels, 7.0063 acres in all, in Bagampur khatola (hadbast 101, tehsil Kadipur) and Baharampur (hadbast 100, tehsil Badshahpur).

The licence register prints the same licensed area, 7.006 acres.

  • 50//18 kanalBagampur khatola (101)
  • 18//10/22 kanal 16 marlaBaharampur (100)
  • 18//112 kanal 16 marlaBaharampur (100)
  • 19//13/22 kanal 3 marlaBaharampur (100)
Show the other 9 parcels
  • 19//13/31 kanal 3 marlaBaharampur (100)
  • 19//14/26 kanal 9 marlaBaharampur (100)
  • 19//158 kanalBaharampur (100)
  • 19//168 kanalBaharampur (100)
  • 19//17/11 kanal 19 marlaBaharampur (100)
  • 19//17/2/24 kanal 8 marlaBaharampur (100)
  • 19//182 kanal 12 marlaBaharampur (100)
  • 19//24/13 kanal 15 marlaBaharampur (100)
  • 19//6/34 kanalBaharampur (100)

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

109 OF 2012: 6 parcels, 3.9 acres in all, in Bagampur khatola (hadbast 101), tehsil Kadipur.

The licence register prints the same licensed area, 3.9 acres.

  • 38//217 kanal 8 marla
  • 38//214 marla
  • 38//228 kanal
  • 51//17 kanal 12 marla
Show the other 2 parcels
  • 51//2/14 kanal
  • 51//2/24 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

81 OF 2018: 3 parcels, 2.425 acres in all, in Bagampur khatola (hadbast 101), tehsil Kadipur.

The licence register prints the same licensed area, 2.425 acres.

  • 24//16/13 kanal 8 marla
  • 24//248 kanal
  • 24//258 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village you want: Bagampur khatola (hadbast 101, tehsil Kadipur) or Baharampur (hadbast 100, tehsil Badshahpur). The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 50//10.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan17 Aug 2021

Layout plan

1 file
Latest Layout Plan17 Aug 2021

Building plans

4 files
Approved Building Plans, Full Set21 Sept 2021Building Drawings- 121 Sept 2021Building Drawings- 221 Sept 2021Building Drawings- 321 Sept 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (17 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1675 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on DLF Home Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.