Skip to content
New launch

Tonino Lamborghini Residences (by Signature Global)

by Signature Global · Sector 71, Gurugram

₹21,000 a sq ftof carpet area

Bhumiq team price list, 16 Sep 2026: an asking rate, not a registry figure.

Possession 1 Jan 2033 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 71, Gurugram1.9 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Carpet area
279–1,516 sq ft
In m²about 26–141 m², as declared
Asking rate
₹21,000 a sq ft of carpet
Bhumiq team price list, 16 Sep 2026
Registered by
SIGNATUREGLOBAL (INDIA)LIMITEDthe company that filed it, for Signature Global
Timeline
  1. 3 Mar 2026Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 1 Jan 2033Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

851homes, 279 to 1,516 sq ft of carpet area
  • Under 1,000 sq ft279–894 sq ft63
  • 1,000–1,500 sq ft1,117–1,376 sq ft638
  • 1,500–2,000 sq ft1,516 sq ft150

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 1 row of a single unit and 18 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside12.4 acres in all, by use
  • Other usesas the form names them: Plot affordable group housing, Open banking, Electric5.766 acres · 47%
  • Roads1.952 acres · 16%
  • Parks and playgrounds1.86 acres · 15%
  • Land for community services, handed to the government1.24 acres · 10%
  • Apartment buildings0.916 acres · 7%
  • Club house0.422 acres · 3%
  • Shops and offices0.244 acres · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningISI marked
  • KitchenWooden cabinet and modular kitchen
  • LiftsPassenger service lift
  • FloorsTile/ marble
  • WallsEmulsion paint/ OBD
  • BathroomsBranded CP fitting
  • WindowsAluminium /UPVC frame & glass
  • Main doorFlush doors frame & shutter

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 71, GurugramSector 71, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)1.9 km
  • Delhi–Gurugram–SNB RRTS2.9 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.1 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 11 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 6
  • Registered, no OC or CC yet: 5

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Tonino Lamborghini Residences (by Signature Global) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1056/788/2026/28. Valid to 1 Jan 2033.

The source ↗
What is the possession timeline for Tonino Lamborghini Residences (by Signature Global)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 1 Jan 2033. Its registration runs to 1 Jan 2033; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Tonino Lamborghini Residences (by Signature Global)?From the records · Map pin and road lines, read 6 Sep 2026

Tonino Lamborghini Residences (by Signature Global) is in Sector 71, Gurugram; the site address declared to HARERA is Village- Fazilpur Jharsa, Sector-71, Gurugram, Haryana. In a straight line it is about 1.9 km from Sohna Elevated Corridor (NH-248A), 2.9 km from Delhi–Gurugram–SNB RRTS and 3.1 km from Dwarka Expressway.

The source ↗
What does a home in Tonino Lamborghini Residences (by Signature Global) cost, and how does that compare nearby?From the records · Bhumiq team price list, 16 Sep 2026

The Bhumiq team's price list has ₹21,000 a sq ft of carpet area (16 Sep 2026). Prices change; ask the developer for its current price list.

What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty

The records

What the registers hold for Tonino Lamborghini Residences (by Signature Global): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1056/788/2026/28: Registered. Valid to 1 Jan 2033.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 187 OF 2025 is on the DTCP register, valid to 24 Sep 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 3 Mar 2026.Declared to HARERA, read 29 Oct 2026
The court record of Signature Global’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 96 HARERA files, with the dates we read them
Registration no.
GGM/1056/788/2026/28
Registration valid till
1 Jan 2033
Declared possession
1 Jan 2033
Asking price (indicative)
₹21,000 / sq ft of carpet area

Bhumiq team price list · as of 16 Sept 2026 · a quoted rate, not a registry figure

Declared by the promoter to HARERA

Land area
12.40 (Acre) (50,181.02 sq m)
FAR
2.53 proposed of 2.65 permissible
licence
187 of 2025 Dated 25.09.2025
Estimated project cost
₹2890.97 crore
Cost of land
₹763.30 crore
Building plans, declared approved
3 Mar 2026
Construction to start
1 Mar 2026
Completion declared for
1 Jan 2033
Declared inventory · 9 types

Declared inventory — 9 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 24 units · 83.083 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 304 units · 103.75 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 164 units · 123.578 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 6 units · 123.636 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 164 units · 127.841 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 150 units · 140.876 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 18 units · 24.5 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 39 units · 25.92 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 12

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (25 Sept 2025)
  • II. LOI — declared: already been obtained (23 Dec 2024)
  • III. LC-IV — declared: already been obtained (25 Sept 2025)
  • IV. ZONING PLAN — declared: already been obtained (19 Feb 2026)
  • V. AAI — declared: already been obtained (6 Jan 2026)
  • VI. FOREST NOC — declared: already been obtained (28 Oct 2024)
  • VII. STP ASSURANCE — declared: already been obtained (11 Nov 2025)
  • VIII. SEWERAGE ASSURANCE — declared: already been obtained (11 Nov 2025)
  • IX. EC — declared: already been obtained (14 Jan 2026)
  • X. FIRE SCHEME APPROVAL — declared: applied for but yet to receive (5 Mar 2026)
  • XI. SPE — declared: applied for but yet to receive (6 Mar 2026)
  • XII. ELECTRIFICATION PLAN — declared: applied for but yet to receive (19 Mar 2026)
On file with HARERA · 96 files

On file with HARERA (96)

Plans

Site plan

2 files
Site Plan17 Apr 2026Approved Site Plan3 Mar 2026

Layout plan

1 file
Latest Layout Plan26 Feb 2026

Zoning plan

3 files
Zoining Approval Letter17 Apr 2026Zoning Cum Demarcation17 Apr 2026Zoning Plan26 Feb 2026

Demarcation plan

1 file
Demarcation Plan26 Feb 2026

Building plans

18 files
Approved BR-III17 Apr 2026Side Elevation Tower 1,2,3 & 417 Apr 2026Section Aa Tower 1,2,3 &417 Apr 2026

Floor plans

20 files
Basement 03 Area Calculation17 Apr 2026Commercial 03 Floor Plans17 Apr 2026Area Calculation of Ground Floor and Ground Coverage and Typical Floor, Tower A, 1,2,3 &17 Apr 2026

Services

Sewerage and drainage

2 files
Sewerage Assurance17 Apr 2026STP Assurance17 Apr 2026

Water supply

1 file
Water Assurance17 Apr 2026

Electricity

1 file
Electrical Plan Applied Copy17 Apr 2026

Landscape and green areas

1 file
Green Area17 Apr 2026

Service plans

3 files
Service Estimates and Plans Applied Copy17 Apr 2026Site Service Plan17 Apr 2026Service Plans on the Layout3 Mar 2026

Approvals and clearances

DTCP licence

3 files
License17 Apr 2026LOI17 Apr 2026Licence Copy with Land Schedule26 Feb 2026

Environment clearance

1 file
Environment Clearance Applied Copy17 Apr 2026

Fire safety

1 file
Fire NOC Applied Copy17 Apr 2026

Other NOCs and clearances

2 files
Forest NOC17 Apr 2026NOC for Creating 3rd Party17 Apr 2026

Land records

Land records

11 files
Mutation17 Apr 2026Collaboration-Yesha 20.31375 Acres17 Apr 2026GPA Unistay-1 Acre17 Apr 2026

Money

Accounts and finance

8 files
CA Certificate for Non Defualt17 Apr 2026BR for Bank Oprations17 Apr 2026CA Certificate for the Networth of the Promoter17 Apr 2026

Timeline and progress

Construction schedule

1 file
PERT Chart17 Apr 2026

The promoter’s papers

Declarations and affidavits

11 files
Affidavit for NOC S & Approvals17 Apr 2026Rep-II17 Apr 2026Affidavit for Approvals Timeline17 Apr 2026

Other filings

Other filings

5 files
AAI NOC17 Apr 2026Club Ground Coverage17 Apr 2026LC Iva17 Apr 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

187 OF 2025 · Signatureglobal (India) Ltd. · GURGAON-MANESAR

Licence valid to 24 Sept 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 3 Mar 2026 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

187 OF 2025

DTCP’s page showed no land schedule for licence 187 OF 2025 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate, residential flat
₹6,950 per sq ft

Sector 71, collector rates effective 1 Apr 2026, Badshahpur tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan17 Apr 2026Approved Site Plan3 Mar 2026

Layout plan

1 file
Latest Layout Plan26 Feb 2026

Building plans

18 files
Approved BR-III17 Apr 2026Side Elevation Tower 1,2,3 & 417 Apr 2026Section Aa Tower 1,2,3 &417 Apr 2026Elevation 1 & 2 Tower B17 Apr 2026Commercial 01 Section Aa & Elevation17 Apr 2026Commercial 03 Section & Elevation Plan17 Apr 2026

Floor plans

20 files
Basement 03 Area Calculation17 Apr 2026Commercial 03 Floor Plans17 Apr 2026Area Calculation of Ground Floor and Ground Coverage and Typical Floor, Tower A, 1,2,3 &17 Apr 2026Basement 0217 Apr 2026Club Area Calculation 1st Floor17 Apr 2026Basement 01 Area Calculation17 Apr 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (96 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3994 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Signature Global

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

₹21,000/sq ftBook a site visitAsk

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.