Skip to content
Under construction

Signature Global Titanium SPR

by Signature Global · Sector 71, Gurugram

₹18,000 a sq ftof carpet area

Bhumiq team price list, 16 Sep 2026: an asking rate, not a registry figure.

Possession 31 May 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 71, Gurugram1.9 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Carpet area
1,441–3,157 sq ft
In m²about 134–293 m², as declared
Asking rate
₹18,000 a sq ft of carpet
Bhumiq team price list, 16 Sep 2026
Registered by
SIGNATUREGLOBAL (INDIA) LIMITEDthe company that filed it, for Signature Global
Timeline
  1. 20 May 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 28 Feb 2031Registration valid toHARERA, read 4 Nov 2026
  3. 31 May 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

613homes, 1,441 to 3,157 sq ft of carpet area
  • 1,000–1,500 sq ft1,441 sq ft222
  • 1,500–2,000 sq ft1,708–1,972 sq ft375
  • 2,500–3,000 sq ft2,518 sq ft6
  • 3,000 sq ft and above3,157 sq ft10

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside14.383 acres in all, by use
  • Parks and playgrounds5.206 acres · 36%
  • Other usesas the form names them: Community building school, Open parking, Any other utility facility3.724 acres · 26%
  • Pavements3.466 acres · 24%
  • Apartment buildings1.473 acres · 10%
  • Club house0.465 acres · 3%
  • Shops and offices0.049 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV/VRF
  • KitchenImported marble
  • Kitchen appliancesHob & chimney, refrigerator, built-in microwave, built-in oven, dishwasher, double bowl sink with drain board, instant geyser, RO
  • LiftsPassenger lift, service lift, penthouse internal lift, private lift for each tower / WING
  • WardrobesModular PRE-laminated shutter and carcass
  • FloorsImported marble
  • WallsAcrylic emulsion paint
  • BathroomsWASH basin with faucet, shower diverter

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 71, GurugramSector 71, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)1.9 km
  • Delhi–Gurugram–SNB RRTS2.9 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.1 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 11 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 6
  • Registered, no OC or CC yet: 5

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Signature Global Titanium SPR registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/831/563/2024/58. Valid to 28 Feb 2031.

The source ↗
What is the possession timeline for Signature Global Titanium SPR?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 May 2031. Its registration runs to 28 Feb 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Signature Global Titanium SPR?From the records · Map pin and road lines, read 6 Sep 2026

Signature Global Titanium SPR is in Sector 71, Gurugram; the site address declared to HARERA is Village- Fazilpur Jharsa, Sector-71, Gurugram, Haryana. In a straight line it is about 1.9 km from Sohna Elevated Corridor (NH-248A), 2.9 km from Delhi–Gurugram–SNB RRTS and 3.1 km from Dwarka Expressway.

The source ↗
What does a home in Signature Global Titanium SPR cost, and how does that compare nearby?From the records · Bhumiq team price list, 16 Sep 2026

The Bhumiq team's price list has ₹18,000 a sq ft of carpet area (16 Sep 2026). Prices change; ask the developer for its current price list.

What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty

The records

What the registers hold for Signature Global Titanium SPR: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/831/563/2024/58: Registered. Valid to 28 Feb 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 9 OF 2010 is on the DTCP register, valid to 22 Jan 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 20 May 2024.Declared to HARERA, read 29 Oct 2026
The court record of Signature Global’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 48 HARERA files, with the dates we read them
Registration no.
GGM/831/563/2024/58
Registration valid till
28 Feb 2031
Declared possession
31 May 2031
Asking price (indicative)
₹18,000 / sq ft of carpet area

Bhumiq team price list · as of 16 Sept 2026 · a quoted rate, not a registry figure

Declared by the promoter to HARERA

Land area
14.3825 (Acre) (58,203.91 sq m)
FAR
1.79 proposed of 1.87 permissible
licence
License No. 09 of 2010 Dated 23.01.2010
Estimated project cost
₹2045.40 crore
Cost of land
₹291.40 crore
Building plans, declared approved
20 May 2024
Construction to start
1 Jun 2024
Completion declared for
31 May 2031
Declared inventory · 5 types

Declared inventory

  • Apartment/Shops/Other Buildings · 370 units · 183.189 sq m carpet · 5 towers · one flat
  • Apartment/Shops/Other Buildings · 10 units · 293.256 sq m carpet · 5 towers · one flat
  • Apartment/Shops/Other Buildings · 222 units · 133.9 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 6 units · 233.914 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 5 units · 158.644 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. AAI NOC — declared: already been obtained (19 Mar 2024)
  • II. WATER ASSURANCE — declared: already been obtained (26 Apr 2024)
  • III. SEWERAGE ASSURANCE — declared: already been obtained (26 Apr 2024)
  • IV. STP ASSURANCE — declared: already been obtained (26 Apr 2024)
  • V. BR-III — declared: already been obtained (20 May 2024)
  • VI. POWER ASSURANCE — declared: already been obtained (23 May 2024)
  • VII. FIRE APPROVAL — declared: already been obtained (31 May 2024)
On file with HARERA · 48 files

On file with HARERA (48)

Plans

Site plan

1 file
Approved Site Plan4 Jun 2024

Layout plan

1 file
Latest Layout Plan4 Jun 2024

Zoning plan

1 file
Zoning Plan4 Jun 2024

Demarcation plan

1 file
Demarcation Plan4 Jun 2024

Building plans

8 files
BR-III4 Jun 2024T2 to T6 Elevation A4 Jun 2024T7,T8 Elevation Aa4 Jun 2024

Floor plans

15 files
T4 Sky Garden Plan 30th Floor4 Jun 2024T7,T8 Refuge FLOORS(16,24&33;)4 Jun 2024T7,T8 Ph Upper Level 41st Floor4 Jun 2024

Services

Sewerage and drainage

2 files
Sewerage Assurance4 Jun 2024STP Assurance4 Jun 2024

Water supply

1 file
Water Assurance4 Jun 2024

Electricity

1 file
Power Assurance 22.50 Acre4 Jun 2024

Landscape and green areas

1 file
Green Area Calcultion4 Jun 2024

Service plans

2 files
Service Plan on Site Layout4 Jun 2024Service Plans on the Layout4 Jun 2024

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule2 May 2024

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration2 May 2024

Money

Accounts and finance

6 files
CA Certificate for Cost Incurred and to Be Incurred4 Jun 2024CA Certificate for Land Cost4 Jun 2024CA Certificate for Net Worth4 Jun 2024

The promoter’s papers

Declarations and affidavits

3 files
Affidavit 4(2)(L)(D)4 Jun 2024Bank Undertaking Spr4 Jun 2024The Promoter’s Declaration on Affidavit6 May 2024

Other filings

Other filings

3 files
South Side Basemet-2 Plan4 Jun 2024Tol4 Jun 2024T2 to T6 Ground Coverage4 Jun 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

9 OF 2010 · Signatureglobal (India) Ltd. · GURGAON-MANESAR

Licence valid to 22 Jan 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 6 May 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

9 OF 2010: 25 parcels, 22.5 acres in all, in Fazilpur jharsa (hadbast 99), tehsil Badshahpur.

The licence register prints the same licensed area, 22.5 acres.

  • 11//118 kanal
  • 11//128 kanal
  • 11//188 kanal
  • 11//198 kanal
Show the other 21 parcels
  • 11//2/23 kanal 11 marla
  • 11//20 min7 kanal 18 marla
  • 11//21 min7 kanal 8 marla
  • 11//228 kanal
  • 11//238 kanal
  • 11//248 kanal
  • 11//98 kanal
  • 23//18 kanal
  • 23//108 kanal
  • 23//118 kanal
  • 23//28 kanal
  • 23//208 kanal
  • 23//38 kanal
  • 23//48 kanal
  • 23//78 kanal
  • 23//8/15 kanal
  • 23//8/23 kanal
  • 23//98 kanal
  • 10//149 kanal 10 marla
  • 10//16 min5 kanal 9 marla
  • 10//15/12 kanal 4 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 23 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Fazilpur jharsa (hadbast 99), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 11//11.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,950 per sq ft

Sector 71, collector rates effective 1 Apr 2026, Badshahpur tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan4 Jun 2024

Layout plan

1 file
Latest Layout Plan4 Jun 2024

Building plans

8 files
BR-III4 Jun 2024T2 to T6 Elevation A4 Jun 2024T7,T8 Elevation Aa4 Jun 2024T7,T8 Section A4 Jun 2024T2 to T6 Section A-A4 Jun 2024T2 to T6 Terrace,oht and Machine Room Level4 Jun 2024

Floor plans

15 files
T4 Sky Garden Plan 30th Floor4 Jun 2024T7,T8 Refuge FLOORS(16,24&33;)4 Jun 2024T7,T8 Ph Upper Level 41st Floor4 Jun 2024South Side Basement-1 Plan4 Jun 2024South Side Basement-1 Ceiling Plan4 Jun 2024T2,T3 Sky Garden Plan 30th Floors4 Jun 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (48 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2936 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Signature Global

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

₹18,000/sq ftBook a site visitAsk

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.