KRISUMI CITY PHASE 7 (COMMUNITY BUILDINGS)
by Krisumi Corporation · Sector 36A, Gurugram
Not on our price list yet
Possession 31 Mar 2036 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 36A, Gurugram0.3 km from Dwarka Expressway, in a straight line
- Registered by
- KRISUMI CORPORATION PVT. LTD.the company that filed it, for Krisumi Corporation
- 13 Feb 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Mar 2036Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Other usesas the form names them: High, Primary, Nursery, Dispensary3.252 acres · 56%
- Club house2.598 acres · 44%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenLaminated wood / engineered wood / vitrified tiles / stone / marble / granite / vitromite / quartz
- LiftsMitsubishi / schindler / KONE / OTIS / equivalent
- FloorsLaminated wood / engineered wood / vitrified tiles / stone / marble / granite
- WallsOBD / SEMI acrylic / acrylic emulsion / vitrified tiles
- BathroomsReputed make of CP fittings & sanitary WARE
- WindowsMS / aluminium / UPVC / glass
- Main doorMAIN door internal doors
- Electrical fittingsModular / switch box and fittings
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20250.3 km
- Delhi–Gurugram–SNB RRTS2.3 km
- Sohna Elevated Corridor (NH-248A)6.4 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 1
- Registered, no OC or CC yet: 6
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Krisumi Corporation | Same sector | — | — | 30 Dec 2029 |
No photo of the project on file yet | Krisumi Corporation | Same sector | — | — | 31 Dec 2028 |
No photo of the project on file yet | Krisumi Corporation | Same sector | — | — | 31 Dec 2031 |
| Max Estate | Same sector | Under construction | ₹22,000/sq ft | 31 Aug 2030 | |
No photo of the project on file yet | Krisumi Corporation | Same sector | — | — | 30 Jun 2031 |
AVL 36 GurgaonNo photo on file yet | AVL Infrastructure | Same sector | — | — | — |
No photo of the project on file yet | Krisumi Corporation | Same sector | — | ₹25,000/sq ft | — |
![]() | Krisumi Corporation | Same sector | Under construction | ₹26,000/sq ft | 30 Sep 2029 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is KRISUMI CITY PHASE 7 (COMMUNITY BUILDINGS) registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/1066/798/2026/38. Valid to 31 Mar 2036.
The source ↗What is the possession timeline for KRISUMI CITY PHASE 7 (COMMUNITY BUILDINGS)?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Mar 2036. Its registration runs to 31 Mar 2036; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around KRISUMI CITY PHASE 7 (COMMUNITY BUILDINGS)?From the records · Map pin and road lines, read 6 Sep 2026
KRISUMI CITY PHASE 7 (COMMUNITY BUILDINGS) is in Sector 36A, Gurugram; the site address declared to HARERA is Sector- 36a. In a straight line it is about 0.3 km from Dwarka Expressway, 2.3 km from Delhi–Gurugram–SNB RRTS and 6.4 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building KRISUMI CITY PHASE 7 (COMMUNITY BUILDINGS)?From the records · HARERA, read 4 Nov 2026
KRISUMI CITY PHASE 7 (COMMUNITY BUILDINGS) is a Krisumi Corporation project, registered by its company KRISUMI CORPORATION PVT. LTD..
The source ↗Krisumi Corporation's projects and court recordThe records
What the registers hold for KRISUMI CITY PHASE 7 (COMMUNITY BUILDINGS): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/1066/798/2026/38: Registered. Valid to 31 Mar 2036.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 39 OF 2013 is on the DTCP register, valid to 3 Jun 2031.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: building plans 13 Feb 2024.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 63 HARERA files, with the dates we read them
- Registration no.
- GGM/1066/798/2026/38
- Registration valid till
- 31 Mar 2036
- Declared possession
- 31 Mar 2036
Declared by the promoter to HARERA
- Land area
- 5.8499 (Acre) (23,673.71 sq m)
- FAR
- 1.5 proposed of 1.5 permissible
- licence
- 39 of 2013 dated 4.6.2013, 85 of2014 dated 08.08.2014 , 166 of 2023 dated 18.08.2023 and 71 of 2024 dated 28.06.2024
- Estimated project cost
- ₹428.77 crore
- Cost of land
- ₹6.78 crore
- Building plans, declared approved
- 13 Feb 2024
- Construction to start
- 1 Apr 2026
- Completion declared for
- 31 Mar 2036
Statutory approvals, as declared · 16
Statutory approvals, as declared
- I. STORM WATER — declared: already been obtained (8 Jul 2024)
- II. ELECTRICAL LOAD — declared: already been obtained (24 Oct 2024)
- III. ENVIRONMENT EXPANSION — declared: already been obtained (10 Dec 2025)
- IV. AIRPORT HEIGHT — declared: already been obtained (28 Oct 2024)
- V. FIRE SCHEME — declared: already been obtained (2 Apr 2024)
- VI. SERVICE PLAN ESTIMATE — declared: already been obtained (30 Jul 2024)
- VII. REVISED FIRE — declared: already been obtained (25 Jul 2025)
- VIII. FIRE NOC — declared: already been obtained (22 Aug 2023)
- IX. BUILDING PLAN — declared: already been obtained (13 Feb 2024)
- X. REVISED BUILDING PLAN — declared: already been obtained (23 Jan 2025)
- XI. ROADS — declared: already been obtained (21 Oct 2024)
- XII. WATER SUPPLY — declared: already been obtained (8 Jul 2024)
- XIII. SEWAGE DISPOSAL — declared: already been obtained (8 Jul 2024)
- XIV. REVISED ZONNING PLAN — declared: already been obtained (1 Jul 2024)
- XV. REVISED PHASING PLAN — declared: already been obtained (14 Nov 2024)
- XVI. REVISED SERVICE PLAN — declared: already been obtained (28 May 2025)
On file with HARERA · 63 files
On file with HARERA (63)
Plans
Site plan
3 filesLayout plan
1 fileZoning plan
1 fileBuilding plans
4 filesServices
Sewerage and drainage
4 filesWater supply
1 fileElectricity
1 fileRoads
1 fileService plans
3 filesApprovals and clearances
DTCP licence
6 filesEnvironment clearance
1 fileFire safety
2 filesOther NOCs and clearances
5 filesMoney
Accounts and finance
7 filesTimeline and progress
Construction schedule
1 fileThe promoter’s papers
Declarations and affidavits
3 filesCompany papers
1 fileOther filings
Other filings
18 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The 4 DTCP licences named on the application
39 OF 2013 · Krisumi Corporation Pvt. Ltd. · GURGAON-MANESAR
Licence valid to 3 Jun 2031
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
85 OF 2014 · Krisumi Corporation Pvt. Ltd. · GURGAON-MANESAR
Licence valid to 7 Aug 2029
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
166 OF 2023 · Krisumi Corporation Pvt. Ltd. · GURGAON-MANESAR
Licence valid to 17 Aug 2028
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
71 OF 2024 · Krisumi Corporation Pvt. Ltd. · GURGAON-MANESAR
Licence valid to 27 Jun 2029
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 26 Mar 2026 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the 4 licences
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
39 OF 2013: 58 parcels, 25.1 acres in all, in Sihi (hadbast 108, tehsil Manesar) and Harsuru (hadbast 107, tehsil Harsaru).
The licence register prints the same licensed area, 25.1 acres.
- 2//11/14 kanal 4 marlaSihi (108)
- 2//11/31 kanal 11 marlaSihi (108)
- 2//12/118 marlaSihi (108)
- 2//12/22 kanal 10 marlaSihi (108)
Show the other 54 parcels
- 2//12/57 marlaSihi (108)
- 2//132 kanal 4 marlaSihi (108)
- 2//15/11 kanalSihi (108)
- 2//15/11 kanal 2 marlaSihi (108)
- 2//16/22 kanal 10 marlaSihi (108)
- 2//16/21 kanal 10 marlaSihi (108)
- 2//184 kanal 10 marlaSihi (108)
- 2//183 kanal 10 marlaSihi (108)
- 2//19/11 kanal 7 marlaSihi (108)
- 2//19/29 marlaSihi (108)
- 2//19/31 kanal 4 marlaSihi (108)
- 2//19/41 kanal 19 marlaSihi (108)
- 2//19/51 kanal 1 marlaSihi (108)
- 2//19/62 kanalSihi (108)
- 2//208 kanalSihi (108)
- 2//21/12 kanal 9 marlaSihi (108)
- 2//228 kanalSihi (108)
- 2//238 kanalSihi (108)
- 2//25/14 kanalSihi (108)
- 1//14/13 kanal 10 marlaSihi (108)
- 1//15/11 kanal 7 marlaSihi (108)
- 1//15/21 kanal 6 marlaSihi (108)
- 1//15/33 kanal 2 marlaSihi (108)
- 1//15/42 kanal 10 marlaSihi (108)
- 1//16/11 kanal 11 marlaSihi (108)
- 1//16/21 kanal 17 marlaSihi (108)
- 1//17/1/12 kanal 8 marlaSihi (108)
- 1//25/19 marlaSihi (108)
- 1//25/22 kanal 13 marlaSihi (108)
- 2//141 kanal 5 marlaSihi (108)
- 2//177 kanal 15 marlaSihi (108)
- 2//175 marlaSihi (108)
- 2//248 kanalSihi (108)
- 7//1/24 kanalSihi (108)
- 7//108 kanalSihi (108)
- 7//11/13 kanal 2 marlaSihi (108)
- 7//12/11 kanal 2 marlaSihi (108)
- 7//2/24 kanalSihi (108)
- 7//98 kanalSihi (108)
- 8//310 marlaSihi (108)
- 8//57 kanal 10 marlaSihi (108)
- 8//510 marlaSihi (108)
- 8//67 kanal 10 marlaSihi (108)
- 8//610 marlaSihi (108)
- 122//188 kanalHarsuru (107)
- 122//228 kanalHarsuru (107)
- 122//238 kanalHarsuru (107)
- 122//246 kanal 18 marlaHarsuru (107)
- 132//1/22 kanal 2 marlaHarsuru (107)
- 132//28 kanalHarsuru (107)
- 132//3/14 kanal 2 marlaHarsuru (107)
- 132//918 marlaHarsuru (107)
- 132//99 marlaHarsuru (107)
- rectangle 8, kila 37 kanal 10 marlaSihi (108)
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
85 OF 2014: 5 parcels, 2.3813 acres in all, in Sihi (hadbast 108), tehsil Manesar.
The licence register prints the same licensed area, 2.38 acres.
- 1//14/21 kanal 12 marla
- 1//16/52 kanal 8 marla
- 1//17/25 kanal 2 marla
- 1//24/2/25 kanal 19 marla
Show the other 1 parcel
- 1//25/34 kanal
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
166 OF 2023: 9 parcels, 2.9 acres in all, in Harsuru (hadbast 107, tehsil Harsaru) and Sihi (hadbast 108, tehsil Manesar).
The licence register prints the same licensed area, 2.9 acres.
- 122//13/216 marlaHarsuru (107)
- 122//13/31 kanal 12 marlaHarsuru (107)
- 122//19/22 kanalHarsuru (107)
- 122//20/22 kanalHarsuru (107)
Show the other 5 parcels
- 122//218 kanalHarsuru (107)
- 132//1/15 kanal 15 marlaHarsuru (107)
- 132//3/22 kanal 1 marlaHarsuru (107)
- 2//12/38 marlaSihi (108)
- 2//12/412 marlaSihi (108)
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
71 OF 2024: 3 parcels, 3 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.
The licence register prints the same licensed area, 3 acres.
- 122//158 kanal
- 122//168 kanal
- 122//178 kanal
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village you want: Sihi (hadbast 108, tehsil Manesar) or Harsuru (hadbast 107, tehsil Harsaru). The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 2//11/1.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
3 filesLayout plan
1 fileBuilding plans
4 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (63 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/4042 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Krisumi Corporation
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.