Timeline
  1. 14 Dec 2022Layout plan approveddeclared to HARERA, read 8 Oct 2026
  2. 25 Jan 2023Building plans approveddeclared to HARERA, read 8 Oct 2026
  3. 31 Dec 2028Possession, as declareddeclared to HARERA, read 8 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside15,726 m² in all, by use
  • Roads6,233 m² · 40%
  • Parks and playgrounds4,958 m² · 32%
  • Apartment buildings2,928 m² · 19%
  • Parking888 m² · 6%
  • Other uses719 m² · 5%

The land-use table of the HARERA application, declared to HARERA, read 8 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenVitrified tiles
  • FloorsWooden flooring, vitrified tiles
  • WallsOBD, vitrified tiles
  • BathroomsStainless steel, chrome plated
  • WindowsEngineered wood
  • Main doorEngineered wood
  • Electrical fittingsModular switch

The developer’s specifications in the HARERA application, declared to HARERA, read 8 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 36A, GurugramSector 36A, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.3 km
  • Delhi–Gurugram–SNB RRTS2.3 km
  • Sohna Elevated Corridor (NH-248A)6.4 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 7 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 6

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is WATERFALL SUITES registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/715/447/2023/59. Valid to 31 Dec 2028.

The source ↗
What is the possession timeline for WATERFALL SUITES?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2028. Its registration runs to 31 Dec 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around WATERFALL SUITES?From the records · Map pin and road lines, read 6 Sep 2026

WATERFALL SUITES is in Sector 36A, Gurugram; the site address declared to HARERA is Sector 36a. In a straight line it is about 0.3 km from Dwarka Expressway, 2.3 km from Delhi–Gurugram–SNB RRTS and 6.4 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building WATERFALL SUITES?From the records · HARERA, read 4 Nov 2026

WATERFALL SUITES is a Krisumi Corporation project, registered by its company KRISUMI CORPORATION PRIVATE LIMITED.

The source ↗Krisumi Corporation's projects and court record

The records

What the registers hold for WATERFALL SUITES: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/715/447/2023/59: Registered. Valid to 31 Dec 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 39 OF 2013 is on the DTCP register, valid to 3 Jun 2031.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 14 Dec 2022, building plans 25 Jan 2023.Declared to HARERA, read 8 Oct 2026
The court record of Krisumi Corporation’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 66 HARERA files, with the dates we read them
Registration no.
GGM/715/447/2023/59
Registration valid till
31 Dec 2028
Declared possession
31 Dec 2028

Declared by the promoter to HARERA

Land area
3.886 (Acre) (15,726.08 sq m)
FAR
1.75 proposed of 1.75 permissible
licence
39 of 2013 (valid till 03.06.2026) 85 of 2014 (valid till 07.08.2024)
Estimated project cost
₹281.29 crore
Cost of land
₹7.09 crore
Layout plan, declared approved (field 5a)
14 Dec 2022
Building plans, declared approved
25 Jan 2023
Construction to start
1 May 2023
Completion declared for
31 Dec 2028
Declared inventory · 7 types

Declared inventory

  • Apartment/Shops/Other Buildings · 128 units · 591.58 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 128 units · 464.14 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 62 units · 493.53 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 2 units · 6,353.18 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 58 units · 192.57 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 1 unit · 214.74 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 1 unit · 156.88 sq m carpet · 1 tower
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. FOREST NOC — declared: already been obtained (6 Mar 2013)
  • II. LICENSE 85 OF 2014 — declared: already been obtained (8 Aug 2014)
  • III. SITE PLAN — declared: already been obtained (14 Dec 2022)
  • IV. ZONING PLAN — declared: already been obtained (11 Aug 2014)
  • V. BUILDING PLAN — declared: already been obtained (25 Jan 2023)
  • VI. ENVIRONMENT CLEARANCE APPROVED IN SEIAA MEETING — declared: already been obtained (15 Feb 2023)
  • VII. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (7 Dec 2022)
  • VIII. LICENSE 39 OF 2013 — declared: already been obtained (4 Jun 2013)
  • IX. SERVICE ESTIMATES — declared: applied for but yet to receive (30 Jan 2023)
  • X. FIRE SCHEME APPROVAL — declared: applied for but yet to receive (8 Feb 2023)
On file with HARERA · 66 files

On file with HARERA (66)

Plans

Site plan

2 files
Parking Plan - Site Plan-121 Jun 2023Approved Site Plan9 Feb 2023

Layout plan

2 files
Superimposed Demarcation Plan on the Layout Plan21 Jun 2023Latest Layout Plan9 Feb 2023

Zoning plan

1 file
Zoning Plan9 Feb 2023

Demarcation plan

2 files
Demarcation Plan21 Jun 2023Demarcation Plan 25.10 Acres Lice 39 of 201321 Jun 2023

Building plans

12 files
Building Plan Approval Letter BR-III Phase-221 Jun 2023EWS Block Elevations & Sections21 Jun 2023Structure Plan Terrace Floor Framing Plan21 Jun 2023

Floor plans

17 files
Refuse Floor Plan & Floor Blow Penthouse21 Jun 2023Floor Plan -Basement-221 Jun 2023Ground Floor Plan21 Jun 2023

Services

Sewerage and drainage

4 files
Storm Water Drainage Plan21 Jun 2023Assurance for Storm Water21 Jun 2023Assurance for Construction Water 60KLD STP Water21 Jun 2023Sewerage Plan21 Jun 2023

Water supply

2 files
Assurance for Drinking Water21 Jun 2023Water Suppy Plan21 Jun 2023

Electricity

2 files
Street Light Plan21 Jun 2023Electricity Supply Plan21 Jun 2023

Roads

1 file
Roads and Pavement Plan21 Jun 2023

Landscape and green areas

1 file
Landscape Plan21 Jun 2023

Service plans

5 files
Solid Waste Management Plan21 Jun 2023Application for Service Plan Estimates21 Jun 2023Copy of Service Estimates21 Jun 2023

Approvals and clearances

DTCP licence

5 files
License 39 & Renewals21 Jun 2023Intimation of Licence Village Sihi21 Jun 2023Intimation of Licence Village Harsaru21 Jun 2023

Environment clearance

1 file
Environment Clearance Letter21 Jun 2023

Fire safety

1 file
Fire Scheme Application Copy21 Jun 2023

Other NOCs and clearances

3 files
Airport Authority Approval - Letter 121 Jun 2023Airport Authority Approval Letter -221 Jun 2023Airport Authority Approval Letter -321 Jun 2023

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration10 Mar 2023

Money

Accounts and finance

3 files
Non-Default Certificate from a CA21 Jun 2023CA Certificate on the Application’s Figures21 Jun 2023Cash Flow Statement21 Jun 2023

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit21 Jun 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

39 OF 2013 · Krisumi Corporation Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 3 Jun 2031

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

85 OF 2014 · Krisumi Corporation Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 7 Aug 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 20 Mar 2023 · read 8 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

39 OF 2013: 58 parcels, 25.1 acres in all, in Sihi (hadbast 108, tehsil Manesar) and Harsuru (hadbast 107, tehsil Harsaru).

The licence register prints the same licensed area, 25.1 acres.

  • 2//11/14 kanal 4 marlaSihi (108)
  • 2//11/31 kanal 11 marlaSihi (108)
  • 2//12/118 marlaSihi (108)
  • 2//12/22 kanal 10 marlaSihi (108)
Show the other 54 parcels
  • 2//12/57 marlaSihi (108)
  • 2//132 kanal 4 marlaSihi (108)
  • 2//15/11 kanalSihi (108)
  • 2//15/11 kanal 2 marlaSihi (108)
  • 2//16/22 kanal 10 marlaSihi (108)
  • 2//16/21 kanal 10 marlaSihi (108)
  • 2//184 kanal 10 marlaSihi (108)
  • 2//183 kanal 10 marlaSihi (108)
  • 2//19/11 kanal 7 marlaSihi (108)
  • 2//19/29 marlaSihi (108)
  • 2//19/31 kanal 4 marlaSihi (108)
  • 2//19/41 kanal 19 marlaSihi (108)
  • 2//19/51 kanal 1 marlaSihi (108)
  • 2//19/62 kanalSihi (108)
  • 2//208 kanalSihi (108)
  • 2//21/12 kanal 9 marlaSihi (108)
  • 2//228 kanalSihi (108)
  • 2//238 kanalSihi (108)
  • 2//25/14 kanalSihi (108)
  • 1//14/13 kanal 10 marlaSihi (108)
  • 1//15/11 kanal 7 marlaSihi (108)
  • 1//15/21 kanal 6 marlaSihi (108)
  • 1//15/33 kanal 2 marlaSihi (108)
  • 1//15/42 kanal 10 marlaSihi (108)
  • 1//16/11 kanal 11 marlaSihi (108)
  • 1//16/21 kanal 17 marlaSihi (108)
  • 1//17/1/12 kanal 8 marlaSihi (108)
  • 1//25/19 marlaSihi (108)
  • 1//25/22 kanal 13 marlaSihi (108)
  • 2//141 kanal 5 marlaSihi (108)
  • 2//177 kanal 15 marlaSihi (108)
  • 2//175 marlaSihi (108)
  • 2//248 kanalSihi (108)
  • 7//1/24 kanalSihi (108)
  • 7//108 kanalSihi (108)
  • 7//11/13 kanal 2 marlaSihi (108)
  • 7//12/11 kanal 2 marlaSihi (108)
  • 7//2/24 kanalSihi (108)
  • 7//98 kanalSihi (108)
  • 8//310 marlaSihi (108)
  • 8//57 kanal 10 marlaSihi (108)
  • 8//510 marlaSihi (108)
  • 8//67 kanal 10 marlaSihi (108)
  • 8//610 marlaSihi (108)
  • 122//188 kanalHarsuru (107)
  • 122//228 kanalHarsuru (107)
  • 122//238 kanalHarsuru (107)
  • 122//246 kanal 18 marlaHarsuru (107)
  • 132//1/22 kanal 2 marlaHarsuru (107)
  • 132//28 kanalHarsuru (107)
  • 132//3/14 kanal 2 marlaHarsuru (107)
  • 132//918 marlaHarsuru (107)
  • 132//99 marlaHarsuru (107)
  • rectangle 8, kila 37 kanal 10 marlaSihi (108)

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

85 OF 2014: 5 parcels, 2.3813 acres in all, in Sihi (hadbast 108), tehsil Manesar.

The licence register prints the same licensed area, 2.38 acres.

  • 1//14/21 kanal 12 marla
  • 1//16/52 kanal 8 marla
  • 1//17/25 kanal 2 marla
  • 1//24/2/25 kanal 19 marla
Show the other 1 parcel
  • 1//25/34 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village you want: Sihi (hadbast 108, tehsil Manesar) or Harsuru (hadbast 107, tehsil Harsaru). The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 2//11/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Parking Plan - Site Plan-121 Jun 2023Approved Site Plan9 Feb 2023

Layout plan

2 files
Superimposed Demarcation Plan on the Layout Plan21 Jun 2023Latest Layout Plan9 Feb 2023

Building plans

12 files
Building Plan Approval Letter BR-III Phase-221 Jun 2023EWS Block Elevations & Sections21 Jun 2023Structure Plan Terrace Floor Framing Plan21 Jun 2023Elevation-1 & Section Aa21 Jun 2023Structure Plan -Foundation Plan and Detail21 Jun 2023Elevation-2 & Section Bb21 Jun 2023

Floor plans

17 files
Refuse Floor Plan & Floor Blow Penthouse21 Jun 2023Floor Plan -Basement-221 Jun 2023Ground Floor Plan21 Jun 2023Parking Plan - EWS Block Basement-121 Jun 2023Floor Plan - EWS Block Basement-221 Jun 2023Floor Plan -Basement-121 Jun 2023

Among the uploads Bhumiq read from HARERA's page on 8 Oct 2026 (66 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2351 · read 8 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Krisumi Corporation

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.