Neo Centra

by Ocimum Estates · Sector 103, Gurugram

Not on our price list yet

Possession 31 Dec 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 103, Gurugram0.9 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
276–1,885 sq ft
In m²about 26–175 m², as declared
Registered
10 Feb 2020
Registered by
OCIMUM ESTATES PRIVATE LIMITEDthe company that filed it, for Ocimum Estates
Timeline
  1. 21 Feb 2019Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 6 Aug 2019Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 10 Feb 2020Registered with HARERAHARERA, read 4 Nov 2026
  4. 31 Dec 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

147homes, 276 to 1,885 sq ft of carpet area
  • Under 1,000 sq ft276–787 sq ft144
  • 1,500–2,000 sq ft1,885 sq ft3

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 61 rows of a single unit and 61 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside9,637 m² in all, by use
  • Apartment buildings5,468 m² · 57%
  • Roads2,357 m² · 24%
  • Green belts1,527 m² · 16%
  • Pavements284 m² · 3%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningProvision of AHU with chill water pipe system
  • LiftsI) passenger elevators II) stain LESS steel finish with light and ceiling III) dedicated service lift
  • WallsCombination of one or MORE stones, tiles, wooden panelling and painted surface (common area only)
  • BathroomsJaquar / hindware
  • WindowsFixed/openable panel SGU / DGU panels
  • Main door12MM frameless sliding glass door
  • Electrical fittingsI) provision of cable upto tenants distribution board .tenant LOAD WILL be metered. II) provision emergency lighting in selected areas III) 100% fully automatic backup with suitable diversity and LOAD factor provided for lighting, power and AC
  • Wi-Fi and broadbandProvision of internet facility

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 103, GurugramSector 103, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.9 km
  • Delhi–Gurugram–SNB RRTS6.3 km
  • Sohna Elevated Corridor (NH-248A)7.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Neo Centra registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/392/124/2020/08, registered on 10 Feb 2020. Ended 31 Dec 2024. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Neo Centra?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2024. Its registration runs to 31 Dec 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Neo Centra?From the records · Map pin and road lines, read 6 Sep 2026

Neo Centra is in Sector 103, Gurugram; the site address declared to HARERA is Revenue Estate Of Village-Daulatabad, Sector-103, Tehsil And District- Gurgaon, Haryana. In a straight line it is about 0.9 km from Dwarka Expressway, 6.3 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Neo Centra?From the records · HARERA, read 4 Nov 2026

Neo Centra is a Ocimum Estates project, registered by its company OCIMUM ESTATES PRIVATE LIMITED.

The source ↗Ocimum Estates's projects and court record

The records

What the registers hold for Neo Centra: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/392/124/2020/08: Registration expired. Ended 31 Dec 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 144 OF 2014 is on the DTCP register: Licence lapsed; the register prints its validity to 31 Aug 2019.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 21 Feb 2019, building plans 6 Aug 2019.Declared to HARERA, read 29 Oct 2026
The court record of Ocimum Estates’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Dec 2024. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 144 OF 2014 lapsed

    Named in this project’s application. Valid to 31 Aug 2019; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 41 HARERA files, with the dates we read them
Registration no.
GGM/392/124/2020/08
Registration date
10 Feb 2020
Registration valid till
31 Dec 2024
Declared possession
31 Dec 2024

Declared by the promoter to HARERA

Land area
2.38125 (Acre) (9,636.58 sq m)
FAR
the application prints 187, which is not a ratio
licence
144 of 2014
Estimated project cost
₹123.12 crore
Cost of land
₹25.93 crore
Layout plan, declared approved (field 5a)
21 Feb 2019
Building plans, declared approved
6 Aug 2019
Construction to start
1 Jan 2020
Completion declared for
31 Dec 2024
Declared inventory · 116 types

Declared inventory — 116 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 1 unit · 105.15 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 128.31 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 131.72 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 3 units · 175.16 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 203 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 218.44 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 220.42 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 646.8 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 9

Statutory approvals, as declared

  • I. NON FOREST LAND — declared: already been obtained (2 Jun 2017)
  • II. DHBVN — declared: already been obtained (21 Mar 2017)
  • III. PERMISSION FOR TREE FELLING/TRANSIT/TRANSPLANTATION — declared: already been obtained (23 May 2018)
  • IV. AIRPORT NOC — declared: already been obtained (8 Mar 2017)
  • V. ARAVALI CLEARANCE — declared: already been obtained (16 Aug 2017)
  • VI. PERMISSION OF FRESH WATER FOR DRINKING & DOMESTIC PURPOSE — declared: already been obtained (19 Apr 2017)
  • VII. CONSENT TO USE HUDA SEWAGE TREATED WATER FOR CONSTRUCTION — declared: already been obtained (18 Apr 2017)
  • VIII. HARYANA STATE POLLUTION CONTROL BOARD — declared: already been obtained (15 Oct 2018)
  • IX. ENVIRONMENTAL CLEARANCE — declared: already been obtained (20 Aug 2018)
On file with HARERA · 41 files

On file with HARERA (41)

Plans

Site plan

1 file
Approved Site Plan17 Sept 2019

Layout plan

1 file
Latest Layout Plan17 Sept 2019

Zoning plan

1 file
Zoning Plan9 Sept 2019

Demarcation plan

1 file
Demarcation Plan18 Jan 2020

Building plans

6 files
Building Plan Approval18 Jan 2020Approved Building Plans, Full Set17 Sept 2019Terrace Plan17 Sept 2019

Floor plans

8 files
Fourth Floor Plan17 Sept 2019First Floor Plan17 Sept 2019Ground Floor Plan17 Sept 2019

Services

Service plans

6 files
Service Estimate18 Jan 2020Service Approval18 Jan 2020Service Plans on the Layout17 Sept 2019

Approvals and clearances

Occupation certificate (OC)

2 files
OC uploaded8 Aug 2023OC uploaded8 Aug 2023

DTCP licence

3 files
LOI18 Jan 2020LC-IV18 Jan 2020Licence Copy with Land Schedule9 Sept 2019

Environment clearance

1 file
Environmental Clearance18 Jan 2020

Fire safety

1 file
Fire NOC18 Jan 2020

Other NOCs and clearances

2 files
Airport Height Clearance18 Jan 2020Forest NOC18 Jan 2020

Land records

Land records

2 files
Non Encumbrances Certificate18 Jan 2020Revenue Record Entry of Licence and Collaboration17 Sept 2019

Sales papers

Allotment and sale agreements

1 file
Gist of Draft Builder Buyer Agreement20 Nov 2019

Money

Accounts and finance

3 files
Cash Flow Statement20 Jan 2020CA Certificate on the Application’s Figures18 Jan 2020Non-Default Certificate from a CA18 Sept 2019

The promoter’s papers

Declarations and affidavits

2 files
Affidavit for Non Advertisement & Unsold Inventory18 Jan 2020The Promoter’s Declaration on Affidavit17 Dec 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

144 OF 2014 · OCIMUM ESTATES PVT. LTD. · GURGAON-MANESAR

Licence valid to 31 Aug 2019

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 17 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

144 OF 2014: 4 parcels, 2.3813 acres in all, in Daultabad (hadbast 53), tehsil Kadipur.

The licence register prints the same licensed area, 2.3813 acres.

  • 39//16/14 marla
  • 39//25/24 kanal 2 marla
  • 40//20/16 kanal 15 marla
  • rectangle 40, kila 218 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Daultabad (hadbast 53), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 39//16/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,52,000 per sq yd

Sector 103, collector rates effective 1 Apr 2026, Kadipur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan17 Sept 2019

Layout plan

1 file
Latest Layout Plan17 Sept 2019

Building plans

6 files
Building Plan Approval18 Jan 2020Approved Building Plans, Full Set17 Sept 2019Terrace Plan17 Sept 2019Elevations17 Sept 2019Elevations17 Sept 2019Sections17 Sept 2019

Floor plans

8 files
Fourth Floor Plan17 Sept 2019First Floor Plan17 Sept 2019Ground Floor Plan17 Sept 2019Second Floor Plan17 Sept 2019Sixth Floor Plan17 Sept 2019Third Floor Plan17 Sept 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (41 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/652 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ocimum Estates

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.