Picasso Centre
by Era Resorts · Sector 61, Gurugram
Not on our price list yet
About this project
Key facts
- Location
- Sector 61, Gurugram5.1 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
- Registered by
- ERA RESORTS PVT LTDthe company that filed it, for Era Resorts
- 27 Dec 2012Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 6 Sep 2018Registered with HARERAHARERA, read 4 Nov 2026
- 30 Dec 2020Registration valid toHARERA, read 4 Nov 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft414–740 sq ft118
- 2,000–2,500 sq ft2,058 sq ft3
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 2 rows of a single unit, because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Land for community services, handed to the government4,950 m² · 52%
- Apartment buildings2,334 m² · 24%
- Roads750 m² · 8%
- Green belts526 m² · 6%
- Parking497 m² · 5%
- Pavements300 m² · 3%
- Electricity sub-station202 m² · 2%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)5.1 km
- Delhi–Gurugram–SNB RRTS7.0 km
- Dwarka ExpresswayOpen, 17 Aug 202510.3 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Other register states: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Suposhaa Realcon | Same sector | — | — | 30 Jun 2026 |
| Emaar MGF Land | Same sector | — | — | — | |
No photo of the project on file yet | Suposhaa Realcon | Same sector | — | — | 31 Oct 2023 |
No photo of the project on file yet | Puri Constructions | Same sector | Under construction | ₹22,000/sq ft | 30 Jun 2029 |
No photo of the project on file yet | Countrywide Promoters | Same sector | — | — | 30 Jun 2022 |
No photo of the project on file yet | Suposhaa Realcon | Same sector | — | — | 31 Dec 2024 |
Splendor SpectrumoneNo photo on file yet | Splendor Buildwell | 1.3 kmto its sector’s point | — | — | 20 Nov 2018 |
IT Park ColonyNo photo on file yet | Indra Technologies | 1.3 kmto its sector’s point | — | — | — |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is Picasso Centre registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/282/2018/14, registered on 6 Sep 2018. The register’s record shows an end date of 30 Dec 2020. The register shows it as: Registration lapsed.
The source ↗How is the connectivity around Picasso Centre?From the records · Map pin and road lines, read 6 Sep 2026
Picasso Centre is in Sector 61, Gurugram; the site address declared to HARERA is Village Ghata, Sector-61. In a straight line it is about 5.1 km from Sohna Elevated Corridor (NH-248A), 7.0 km from Delhi–Gurugram–SNB RRTS and 10.3 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Picasso Centre?From the records · HARERA, read 4 Nov 2026
Picasso Centre is a Era Resorts project, registered by its company ERA RESORTS PVT LTD.
The source ↗Era Resorts's projects and court recordWhat protections do I have as a buyer?General guidance
Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.
The records
What the registers hold for Picasso Centre: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/282/2018/14: Registration lapsed. The register’s record shows an end date of 30 Dec 2020.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 278 OF 2007 is on the DTCP register: Licence lapsed; the register prints its validity to 16 Dec 2025.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 27 Dec 2012, building plans 27 Dec 2012.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 50 HARERA files, with the dates we read them
- Registration no.
- GGM/282/2018/14
- Registration date
- 6 Sept 2018
- Registration valid till
- 30 Dec 2020
Declared by the promoter to HARERA
- Land area
- 2.362 (Acre) (9,558.67 sq m)
- FAR
- the application prints 150, which is not a ratio
- licence
- 278 of 2007 (17-12-2007)
- Estimated project cost
- ₹84.57 crore
- Cost of land
- ₹3.05 crore
- Layout plan, declared approved (field 5a)
- 27 Dec 2012
- Building plans, declared approved
- 27 Dec 2012
Declared inventory · 10 types
Declared inventory — 10 types declared, first 8 shown
- APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL TYPE A · 86 units · 38.46 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL TYPE B · 10 units · 48.12 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL TYPE C · 5 units · 46.18 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL TYPE D · 5 units · 68.75 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL TYPE E · 4 units · 64.78 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type RETAIL SPACE TYPE- A · 1 unit · 159.82 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type RETAIL SPACE TYPE- B · 1 unit · 152.99 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type RETAIL SPACE TYPE- C · 3 units · 191.21 sq m carpet · one flat
Statutory approvals, as declared · 6
Statutory approvals, as declared
- I. ZONNING PLAN — declared: already been obtained (30 May 2012)
- II. BUILDING PLAN — declared: already been obtained (27 Dec 2012)
- III. ARAVALI CLEARANCE THROUGH DC — declared: already been obtained (2 Sept 2013)
- IV. CONSENT TO ESTABLISHMENT — declared: already been obtained (27 Aug 2018)
- V. CLEARANCE FROM MINING DEPARTMENT — declared: already been obtained (27 Jun 2013)
- VI. SERVICES ESTIMATE — declared: applied for but yet to receive (17 Feb 2014)
On file with HARERA · 50 files
On file with HARERA (50)
Plans
Site plan
7 filesLayout plan
1 fileZoning plan
2 filesBuilding plans
7 filesFloor plans
8 filesServices
Service plans
2 filesApprovals and clearances
DTCP licence
5 filesEnvironment clearance
1 fileFire safety
1 fileOther NOCs and clearances
4 filesLand records
Land records
2 filesMoney
Accounts and finance
4 filesThe promoter’s papers
Declarations and affidavits
3 filesHARERA’s orders
HARERA’s orders
1 fileOther filings
Other filings
2 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
278 OF 2007 · Era Resort Pvt. Ltd. · GURGAON-MANESAR
Licence valid to 16 Dec 2025
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 28 Nov 2019 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
278 OF 2007: 4 parcels, 2.3625 acres in all, in Ghata (hadbast 81), tehsil Wazirabad.
The licence register prints the same licensed area, 2.362 acres.
- rectangle 34, kila 248 kanal
- rectangle 52, kila 4/12 kanal
- rectangle 52, kila 4/24 kanal 18 marla
- rectangle 52, kila 7/14 kanal
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Ghata (hadbast 81), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as rectangle 34, kila 24.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No collector rate for commercial property in Sector 61 in the lists Bhumiq reads, as of 28 Aug 2026. That is not confirmation that none exists.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
7 filesLayout plan
1 fileBuilding plans
7 filesFloor plans
8 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (50 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/947 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Era Resorts
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.


