PURI AEROSPHERE

by Puri Constructions · Sector 111, Gurugram

Not on our price list yet

Possession 30 Jun 2033 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 111, Gurugram0.5 km from Dwarka Expressway, in a straight line
Carpet area
422–1,208 sq ft
In m²about 39–112 m², as declared
Registered by
PURI CONSTRUCTION PVT LTDthe company that filed it, for Puri Constructions
Timeline
  1. 16 Jun 2026Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Jun 2033Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

405homes, 422 to 1,208 sq ft of carpet area
  • Under 1,000 sq ft422–967 sq ft367
  • 1,000–1,500 sq ft1,062–1,208 sq ft38

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 12 rows of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside6,782 m² in all, by use
  • Apartment buildings2,666 m² · 39%
  • Roads2,144 m² · 32%
  • Pavements1,192 m² · 18%
  • Green belts537 m² · 8%
  • Parking219 m² · 3%
  • Electricity sub-station24 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRF/ water cooled/AIR cooled AIR conditioning system as per consultant recommendation and apporved design
  • LiftsLift with SS finish / MS powder coated finish as per consultant'S recommendation
  • FloorsTiles/marble/granite as per design in common areas.
  • WallsOBD/acrylic emulsion paint as per design.
  • BathroomsISI marked standard sanitary fittings
  • WindowsAluminium / UPVC door/wondows for external door/windows
  • Main doorGlass door/laminated flush doors/ SKIN doors or equivalent
  • Electrical fittingsISI marked standard fittings

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 111, GurugramSector 111, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.5 km
  • Delhi–Gurugram–SNB RRTS4.0 km
  • Sohna Elevated Corridor (NH-248A)8.6 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 9 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 3
  • Other register states: 5

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is PURI AEROSPHERE registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/1085/817/2026/57. Valid to 30 Jun 2033.

The source ↗
What is the possession timeline for PURI AEROSPHERE?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2033. Its registration runs to 30 Jun 2033; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around PURI AEROSPHERE?From the records · Map pin and road lines, read 6 Sep 2026

PURI AEROSPHERE is in Sector 111, Gurugram; the site address declared to HARERA is Sector-111, Dwarka Expressway. In a straight line it is about 0.5 km from Dwarka Expressway, 4.0 km from Delhi–Gurugram–SNB RRTS and 8.6 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building PURI AEROSPHERE?From the records · HARERA, read 3 Nov 2026

PURI AEROSPHERE is a Puri Constructions project, registered by its company PURI CONSTRUCTION PVT LTD.

The source ↗Puri Constructions's projects and court record

The records

What the registers hold for PURI AEROSPHERE: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1085/817/2026/57: Registered. Valid to 30 Jun 2033.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 98 OF 2010 is on the DTCP register, valid to 18 Nov 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 16 Jun 2026, building plans 16 Jun 2026.Declared to HARERA, read 29 Oct 2026
The court record of Puri Constructions’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 83 HARERA files, with the dates we read them
Registration no.
GGM/1085/817/2026/57
Registration valid till
30 Jun 2033
Declared possession
30 Jun 2033

Declared by the promoter to HARERA

Land area
1.6759 (Acre) (6,782.13 sq m)
FAR
5.12 proposed of 5.15 permissible
licence
License No. 98 of 2010 (18.11.2030), License No. 99 of 2010 (18.11.2030)
Estimated project cost
₹840.07 crore
Cost of land
₹5.50 crore
Layout plan, declared approved (field 5a)
16 Jun 2026
Building plans, declared approved
16 Jun 2026
Construction to start
1 Jan 2027
Completion declared for
30 Jun 2033
Declared inventory · 31 types

Declared inventory — 31 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 2 units · 39.16 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 6 units · 44.44 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 2 units · 46.26 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 47.44 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 6 units · 48.2 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 48.58 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 8 units · 49.22 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 54.18 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. BUILDING PLAN APPROVAL — declared: already been obtained (16 Jun 2026)
  • II. AIRPORT AUTHORITY OF INDIA — declared: already been obtained (27 Jan 2026)
  • III. SERVICE PLAN ESTIMATES — declared: already been obtained (10 Jul 2026)
On file with HARERA · 83 files

On file with HARERA (83)

Plans

Site plan

3 files
Site Plan25 Aug 2026Superimposed Layout Plan25 Aug 2026Approved Site Plan20 Jul 2026

Layout plan

2 files
Phasing Plan Approval Letter25 Aug 2026Latest Layout Plan21 Jul 2026

Zoning plan

2 files
Old Zoning Plan and Building Plans25 Aug 2026Zoning Plan20 Jul 2026

Demarcation plan

1 file
Demarcation Plan20 Jul 2026

Building plans

6 files
Elevation Plans25 Aug 2026Building Plans Approval Letter BR-III25 Aug 2026Old BR-III Letter25 Aug 2026

Floor plans

24 files
Basement Plan 221 Jul 20262nd Floor Plan21 Jul 20263rd Floor Plan21 Jul 2026

Services

Sewerage and drainage

3 files
Assurance Drinking Water, Construction Water, Sewerage and Storm Water25 Aug 2026Sewerage Plan25 Aug 2026Storm Water Plan25 Aug 2026

Water supply

2 files
Irrigation Plan25 Aug 2026Water Supply Plan25 Aug 2026

Electricity

1 file
Electrification Plan Applied25 Aug 2026

Roads

1 file
Road and Landscape Plan25 Aug 2026

Service plans

3 files
Service Plan Estimates25 Aug 2026Approval Service Plan & Estimates Letter25 Aug 2026Service Plans on the Layout21 Jul 2026

Approvals and clearances

DTCP licence

2 files
LOI and LC IV25 Aug 2026Licence Copy with Land Schedule20 Jul 2026

Environment clearance

1 file
Environment Clearance25 Aug 2026

Fire safety

1 file
Fire Scheme Approval25 Aug 2026

Other NOCs and clearances

3 files
Airport Height Clearance25 Aug 2026Forest NOC25 Aug 2026Mining Permission25 Aug 2026

Land records

Land records

13 files
Sale Deeds with Mutation 425 Aug 2026Sale Deed 125 Aug 2026Land Title Search Report25 Aug 2026

Sales papers

Allotment and sale agreements

1 file
Draft Application, Allotment, BBA and Conveyance Deed25 Aug 2026

Money

Accounts and finance

8 files
Cash Flow Statement25 Aug 2026CA Certificate for Cost Incurred and to Be Incurred25 Aug 2026CA Certificate for Land Cost25 Aug 2026

The promoter’s papers

Declarations and affidavits

6 files
Affidavit for 4(2)(L)(D)25 Aug 2026Affidavit for Non-Applicabitiy of NCZ & Other NOCS25 Aug 2026The Promoter’s Declaration on Affidavit25 Aug 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

98 OF 2010 · Puri Construction · GURGAON-MANESAR

Licence valid to 18 Nov 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

99 OF 2010 · Puri Construction · GURGAON-MANESAR

Licence valid to 18 Nov 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 21 Jul 2026 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

98 OF 2010: 6 parcels, 3.375 acres in all, in Choma (hadbast 62), tehsil Gurugram.

The licence register prints the same licensed area, 3.38 acres.

  • 21//18/2/14 kanal 1 marla
  • 21//195 kanal 12 marla
  • 21//222 kanal
  • 21//238 kanal
Show the other 2 parcels
  • 21//24/13 kanal 4 marla
  • 21//24/2 min4 kanal 3 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

99 OF 2010: 5 parcels, 3.3563 acres in all, in Choma (hadbast 62), tehsil Gurugram.

The licence register prints the same licensed area, 3.36 acres.

  • 28//1/16 kanal 16 marla
  • 28//26 kanal 13 marla
  • 21//192 kanal 8 marla
  • 21//21/25 kanal
Show the other 1 parcel
  • 21//226 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Choma (hadbast 62), tehsil Gurugram. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 21//18/2/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Site Plan25 Aug 2026Superimposed Layout Plan25 Aug 2026Approved Site Plan20 Jul 2026

Layout plan

2 files
Phasing Plan Approval Letter25 Aug 2026Latest Layout Plan21 Jul 2026

Building plans

6 files
Elevation Plans25 Aug 2026Building Plans Approval Letter BR-III25 Aug 2026Old BR-III Letter25 Aug 2026X-Section Plans 1 & 221 Jul 2026X-Section Plan 321 Jul 2026Approved Building Plans, Full Set20 Jul 2026

Floor plans

24 files
Basement Plan 221 Jul 20262nd Floor Plan21 Jul 20263rd Floor Plan21 Jul 202613th Floor Plan21 Jul 202621st Floor Plan21 Jul 202618th Floor Plan21 Jul 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (83 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/4157 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Puri Constructions

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.