Signature Global Proxima-1
by Signature Global · Sector 89, Gurugram
Not on our price list yet
Possession 31 Dec 2023 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 89, Gurugram1.7 km from Dwarka Expressway, in a straight linePrices and what changed
- Carpet area
- about 592 sq ft
In m²
about 55 m², the average flat, as declared - Registered by
- SIGNATUREGLOBAL (INDIA) PRIVATE LIMITEDthe company that filed it, for Signature Global
- 22 Nov 2019Layout plan approveddeclared to HARERA, read 29 Oct 2026
- 25 Nov 2019Building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Dec 2019Registered with HARERAHARERA, read 4 Nov 2026
- 31 Dec 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026
- 28 Jun 2026Registration valid toHARERA, read 4 Nov 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads9,744 m² · 48%
- Green belts4,044 m² · 20%
- Apartment buildings4,027 m² · 20%
- Shops and offices1,204 m² · 6%
- Sewage and waste treatment1,000 m² · 5%
- Other uses216 m² · 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenISI marked
- LiftsISI marked
- FloorsVitrified & ceramic tiles
- WallsOBD
- BathroomsISI marked
- WindowsAluminiumn/UPVC
- Main doorFlush door
- Electrical fittingsISI marked
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20251.7 km
- Delhi–Gurugram–SNB RRTS4.3 km
- Sohna Elevated Corridor (NH-248A)8.9 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 6
- Registered, no OC or CC yet: 5
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
M3M SOULITUDE 2No photo on file yet | Adhikaansh Realtors Private Limited ,aawam Residency | Same sector | — | — | 3 Apr 2027 |
SMARTWORLD GEMSNo photo on file yet | Adhikaansh Realtors Private Limited ,aawam Residency | Same sector | — | — | 30 Sep 2025 |
GreenopolisNo photo on file yet | Radha Estates | Same sector | — | — | 31 Dec 2020 |
No photo of the project on file yet | Orris Infrastructure | Same sector | — | — | — |
No photo of the project on file yet | ATS Real Estate Builders | Same sector | — | — | — |
M3M SOULITUDE CENTRALNo photo on file yet | Adhikaansh Realtors Private Limited ,aawam Residency | Same sector | — | — | 31 Jul 2030 |
SMARTWORLD GEMS 3No photo on file yet | Adhikaansh Realtors Private Limited ,aawam Residency | Same sector | — | — | 31 Mar 2028 |
| Ganga Realty | Same sector | Under construction | ₹13,000/sq ft | 5 Jan 2028 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is Signature Global Proxima-1 registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/383/115/2019/77, registered on 31 Dec 2019. Ended 28 Jun 2026. The register shows it as: Registration expired.
The source ↗What is the possession timeline for Signature Global Proxima-1?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2023. Its registration runs to 28 Jun 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Signature Global Proxima-1?From the records · Map pin and road lines, read 6 Sep 2026
Signature Global Proxima-1 is in Sector 89, Gurugram; the site address declared to HARERA is Village Hayatpur, Sector 89 Gurugram, Haryana. In a straight line it is about 1.7 km from Dwarka Expressway, 4.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Signature Global Proxima-1?From the records · HARERA, read 4 Nov 2026
Signature Global Proxima-1 is a Signature Global project, registered by its company SIGNATUREGLOBAL (INDIA) PRIVATE LIMITED.
The source ↗Signature Global's projects and court recordThe records
What the registers hold for Signature Global Proxima-1: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/383/115/2019/77: Registration expired. Ended 28 Jun 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 89 OF 2019 is on the DTCP register: Licence lapsed; the register prints its validity to 1 Aug 2026.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 22 Nov 2019, building plans 25 Nov 2019.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 25 HARERA files, with the dates we read them
- Registration no.
- GGM/383/115/2019/77
- Registration date
- 31 Dec 2019
- Registration valid till
- 28 Jun 2026
- Declared possession
- 31 Dec 2023
Declared by the promoter to HARERA
- Land area
- 5.00 (Acre) (20,234.28 sq m)
- FAR
- the application prints 236.83, which is not a ratio
- licence
- 89 of 2019 dated 02.08.2019
- Estimated project cost
- ₹176.66 crore
- Cost of land
- ₹35.97 crore
- Layout plan, declared approved (field 5a)
- 22 Nov 2019
- Building plans, declared approved
- 25 Nov 2019
- Construction to start
- 1 Jan 2020
- Completion declared for
- 31 Dec 2023
Declared inventory · 5 types
Declared inventory
- Apartment/Shops/Other Buildings · 36 units · 2,147.738 sq m carpet · 1 tower · total for 36 flats, about 59.7 m² each
- Apartment/Shops/Other Buildings · 160 units · 8,760.98 sq m carpet · 1 tower · total for 160 flats, about 54.8 m² each
- Apartment/Shops/Other Buildings · 160 units · 8,760.98 sq m carpet · 1 tower · total for 160 flats, about 54.8 m² each
- Apartment/Shops/Other Buildings · 160 units · 8,758.04 sq m carpet · 1 tower · total for 160 flats, about 54.7 m² each
- Apartment/Shops/Other Buildings · 204 units · 11,166.728 sq m carpet · 1 tower · total for 204 flats, about 54.7 m² each
Statutory approvals, as declared · 5
Statutory approvals, as declared
- I. LICENSE NO 89 OF 2019 — declared: already been obtained (2 Aug 2019)
- II. ZONING PLAN VIDE DRG.NO. DTCP 7086 — declared: already been obtained (6 Aug 2019)
- III. AIRPORT HEIGHT VIDE PALM/NORTH/B/090619/428126 — declared: already been obtained (6 Sept 2019)
- IV. FOREST VIDE TUM-DF6-BF77 — declared: already been obtained (20 Jun 2019)
- V. WATER SUPPLY VIDE MEMO NO. 3861 — declared: already been obtained (26 Aug 2019)
On file with HARERA · 25 files
On file with HARERA (25)
Plans
Site plan
2 filesLayout plan
2 filesZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileFloor plans
5 filesServices
Service plans
2 filesApprovals and clearances
Occupation certificate (OC)
1 fileDTCP licence
1 fileLand records
Land records
2 filesMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileHARERA’s orders
HARERA’s orders
1 fileOther filings
Other filings
2 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
89 OF 2019 · SIGNATURE GLOBAL (INDIA) PVT. LTD. · GURGAON-MANESAR
Licence valid to 1 Aug 2026
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 14 Nov 2019 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
89 OF 2019: 9 parcels, 5 acres in all, in Hayatpur (hadbast 114), tehsil Harsaru.
The licence register prints the same licensed area, 5 acres.
- 19//18/26 kanal 18 marla
- 19//19/27 kanal 18 marla
- 19//208 kanal
- 19//22/2/13 kanal 12 marla
Show the other 5 parcels
- 19//237 kanal 10 marla
- 19//232 marla
- 19//12/22 kanal 1 marla
- 19//113 kanal
- 19//12/119 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Hayatpur (hadbast 114), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 19//18/2.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹7,000 per sq ft
Sector 89, collector rates effective 1 Apr 2026, Harsaru tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
2 filesBuilding plans
1 fileFloor plans
5 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (25 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/930 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Signature Global
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

