Skip to content

Signature Global Proxima-2

by Signature Infrabuild India · Sector 89, Gurugram

Not on our price list yet

Possession 31 Dec 2023 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 89, Gurugram1.7 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
about 592 sq ft
In m²about 55 m², the average flat, as declared
Registered
6 Jan 2020
Registered by
SIGNATURE INFRABUILD PRIVATE LIMITEDthe company that filed it, for Signature Infrabuild India
Timeline
  1. 10 Dec 2019Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 6 Jan 2020Registered with HARERAHARERA, read 4 Nov 2026
  3. 31 Dec 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside19,147 m² in all, by use
  • Roads9,568 m² · 50%
  • Apartment buildings4,523 m² · 24%
  • Green belts3,121 m² · 16%
  • Sewage and waste treatment1,000 m² · 5%
  • Shops and offices719 m² · 4%
  • Other uses216 m² · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenISI marked
  • LiftsISI marked
  • FloorsVitrified & ceramic tiles
  • WallsOBD
  • BathroomsISI marked
  • WindowsAluminiumn/UPVC
  • Main doorFlush door
  • Electrical fittingsISI marked

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 89, GurugramSector 89, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.7 km
  • Delhi–Gurugram–SNB RRTS4.3 km
  • Sohna Elevated Corridor (NH-248A)8.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 6 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Signature Global Proxima-2 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/386/118/2020/02, registered on 6 Jan 2020. Ended 31 Dec 2023. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Signature Global Proxima-2?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2023. Its registration runs to 31 Dec 2023; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Signature Global Proxima-2?From the records · Map pin and road lines, read 6 Sep 2026

Signature Global Proxima-2 is in Sector 89, Gurugram; the site address declared to HARERA is Village Hayatpur, Sector 89 Gurugram-Manesar Urban Complex, Haryana. In a straight line it is about 1.7 km from Dwarka Expressway, 4.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Signature Global Proxima-2?From the records · HARERA, read 4 Nov 2026

Signature Global Proxima-2 is a Signature Infrabuild India project, registered by its company SIGNATURE INFRABUILD PRIVATE LIMITED.

The source ↗Signature Infrabuild India's projects and court record

The records

What the registers hold for Signature Global Proxima-2: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/386/118/2020/02: Registration expired. Ended 31 Dec 2023.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 121 OF 2019 is on the DTCP register: Licence lapsed; the register prints its validity to 13 Sep 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 10 Dec 2019.Declared to HARERA, read 29 Oct 2026
The court record of Signature Infrabuild India’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Dec 2023. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 121 OF 2019 lapsed

    Named in this project’s application. Valid to 13 Sep 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 39 HARERA files, with the dates we read them
Registration no.
GGM/386/118/2020/02
Registration date
6 Jan 2020
Registration valid till
31 Dec 2023
Declared possession
31 Dec 2023

Declared by the promoter to HARERA

Land area
4.73125 (Acre) (19,146.69 sq m)
FAR
the application prints 236.83, which is not a ratio
licence
121 of 2019(14.09.2019)
Estimated project cost
₹170.01 crore
Cost of land
₹34.08 crore
Building plans, declared approved
10 Dec 2019
Construction to start
1 Jan 2020
Completion declared for
31 Dec 2023
Declared inventory · 7 types

Declared inventory

  • Apartment/Shops/Other Buildings · 120 units · 6,568.53 sq m carpet · 1 tower · total for 120 flats, about 54.7 m² each
  • Apartment/Shops/Other Buildings · 120 units · 6,568.53 sq m carpet · 1 tower · total for 120 flats, about 54.7 m² each
  • Apartment/Shops/Other Buildings · 120 units · 6,568.53 sq m carpet · 1 tower · total for 120 flats, about 54.7 m² each
  • Apartment/Shops/Other Buildings · 120 units · 6,568.53 sq m carpet · 1 tower · total for 120 flats, about 54.7 m² each
  • Apartment/Shops/Other Buildings · 88 units · 4,816.922 sq m carpet · 1 tower · total for 88 flats, about 54.7 m² each
  • Apartment/Shops/Other Buildings · 86 units · 4,708.228 sq m carpet · 1 tower · total for 86 flats, about 54.7 m² each
  • Apartment/Shops/Other Buildings · 36 units · 2,147.738 sq m carpet · 1 tower · total for 36 flats, about 59.7 m² each
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. LICENSE NO 121 OF 2019 — declared: already been obtained (14 Sept 2019)
  • II. ZONING PLAN VIDE DTCP NO. 7187 — declared: already been obtained (16 Sept 2019)
  • III. AIRPORT VIDE PALM/NORTH/B/092619/431505 — declared: already been obtained (27 Sept 2019)
  • IV. FOREST NOC VIDE QRH-A3C-RU53 — declared: already been obtained (10 Jun 2019)
  • V. WATER SUPPLY VIDE GMDA/SS-1/2019/3019 — declared: already been obtained (3 Oct 2019)
On file with HARERA · 39 files

On file with HARERA (39)

Plans

Site plan

2 files
Site Plan9 Jan 2020Approved Site Plan13 Nov 2019

Layout plan

1 file
Latest Layout Plan13 Nov 2019

Zoning plan

1 file
Zoning Plan3 Jan 2020

Demarcation plan

1 file
Demarcation Plan3 Jan 2020

Building plans

7 files
Elevation Tower-T-1,2,3,49 Jan 2020Elevation & Section Tower-T-1,2,3,49 Jan 2020Elevation Tower-T-59 Jan 2020

Floor plans

9 files
Areas Tower-T2,T3,T49 Jan 2020Areas Tower-T-69 Jan 2020Plans Tower-T59 Jan 2020

Services

Electricity

1 file
Electricity Assurance Certificate3 Jan 2020

Landscape and green areas

1 file
Parking & Green Area Calculations9 Jan 2020

Service plans

3 files
Service Plans on the Layout9 Jan 2020Co-Ordination Plan Services9 Jan 2020Service Estimate3 Jan 2020

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate17 Jul 2024

DTCP licence

1 file
Licence Copy with Land Schedule13 Nov 2019

Environment clearance

1 file
Environment Clearance Certificate3 Jan 2020

Fire safety

1 file
Approval of Fire Fighting Scheme3 Jan 2020

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration3 Jan 2020

Money

Accounts and finance

2 files
CA Certificate on the Application’s Figures3 Jan 2020Non-Default Certificate from a CA13 Nov 2019

The promoter’s papers

Declarations and affidavits

2 files
Bank Undertaking3 Jan 2020The Promoter’s Declaration on Affidavit13 Nov 2019

HARERA’s orders

HARERA’s orders

1 file
registration certificate amendment20 Jun 2023

Other filings

Other filings

3 files
Commercial Block-29 Jan 2020Community Hall Anganwadi-Cum-Creche9 Jan 2020Commercial Block-19 Jan 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

121 OF 2019 · SIGNATURE INFRABUILD PVT. LTD. · GURGAON-MANESAR

Licence valid to 13 Sept 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 14 Nov 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

121 OF 2019: 9 parcels, 4.7313 acres in all, in Hayatpur (hadbast 114), tehsil Harsaru.

The licence register prints the same licensed area, 4.7313 acres.

  • 19//107 kanal 9 marla
  • 19//11/15 kanal
  • 19//12/1/11 kanal 12 marla
  • 19//12/2/13 kanal 8 marla
Show the other 5 parcels
  • 19//13/1/15 kanal 18 marla
  • 19//94 kanal 11 marla
  • 6//15/2/14 kanal 1 marla
  • 6//6/1/14 kanal 5 marla
  • 6//6/2/21 kanal 13 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Hayatpur (hadbast 114), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 19//10.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹7,000 per sq ft

Sector 89, collector rates effective 1 Apr 2026, Harsaru tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan9 Jan 2020Approved Site Plan13 Nov 2019

Layout plan

1 file
Latest Layout Plan13 Nov 2019

Building plans

7 files
Elevation Tower-T-1,2,3,49 Jan 2020Elevation & Section Tower-T-1,2,3,49 Jan 2020Elevation Tower-T-59 Jan 2020Elevations & Section Tower-T-59 Jan 2020Elevations & Section Tower-T-69 Jan 2020BR-III9 Jan 2020Elevations and Sections Tower-T-79 Jan 2020

Floor plans

9 files
Areas Tower-T2,T3,T49 Jan 2020Areas Tower-T-69 Jan 2020Plans Tower-T59 Jan 2020Carpet Area Calculations9 Jan 2020Areas Tower-T19 Jan 2020Area Tower-T-59 Jan 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (39 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/928 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Signature Infrabuild India

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.