Skip to content

SIGNATURE GLOBAL SCO - 37D

by Signature Global · Sector 37, Gurugram

Not on our price list yet

Possession 31 Mar 2023 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 37, Gurugram0.8 km from Delhi–Gurugram–SNB RRTS, in a straight line
Registered by
SIGNATURE GLOBAL DEVELOPERS PRIVATE LIMITEDthe company that filed it, for Signature Global
Timeline
  1. 15 Mar 2022Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 27 May 2022Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 31 Mar 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 29 Mar 2025Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.345 acres in all, by use
  • Roads1.391 acres · 59%
  • Plots for sale0.633 acres · 27%
  • Other usesas the form names them: Utility0.27 acres · 12%
  • Sewage and waste treatment0.052 acres · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 37, GurugramSector 37, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS0.8 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.1 km
  • Sohna Elevated Corridor (NH-248A)3.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 11 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 6
  • Registered, no OC or CC yet: 5

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is SIGNATURE GLOBAL SCO - 37D registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/576/308/2022/51. Ended 29 Mar 2025. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for SIGNATURE GLOBAL SCO - 37D?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2023. Its registration runs to 29 Mar 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SIGNATURE GLOBAL SCO - 37D?From the records · Map pin and road lines, read 6 Sep 2026

SIGNATURE GLOBAL SCO - 37D is in Sector 37, Gurugram; the site address declared to HARERA is Village-Basai, Sector-37/D, Gurugram. In a straight line it is about 0.8 km from Delhi–Gurugram–SNB RRTS, 3.1 km from Dwarka Expressway and 3.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SIGNATURE GLOBAL SCO - 37D?From the records · HARERA, read 4 Nov 2026

SIGNATURE GLOBAL SCO - 37D is a Signature Global project, registered by its company SIGNATURE GLOBAL DEVELOPERS PRIVATE LIMITED.

The source ↗Signature Global's projects and court record

The records

What the registers hold for SIGNATURE GLOBAL SCO - 37D: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/576/308/2022/51: Registration expired. Ended 29 Mar 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 19 OF 2022 is on the DTCP register: Licence ends soon; the register prints its validity to 10 Mar 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 15 Mar 2022, building plans 27 May 2022.Declared to HARERA, read 29 Oct 2026
The court record of Signature Global’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 29 Mar 2025. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 19 OF 2022 ends soon

    Named in this project’s application. Valid to 10 Mar 2027. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 28 HARERA files, with the dates we read them
Registration no.
GGM/576/308/2022/51
Registration valid till
29 Mar 2025
Declared possession
31 Mar 2023

Declared by the promoter to HARERA

Land area
2.3875 (Acre) (9,661.87 sq m)
FAR
1 proposed of 1 permissible
licence
19 of 2022 dated 11.03.2022
Estimated project cost
₹56.38 crore
Cost of land
₹20.62 crore
Layout plan, declared approved (field 5a)
15 Mar 2022; Part E of the same form gives 20 Dec 2021
Building plans, declared approved
27 May 2022
Construction to start
1 Apr 2022
Completion declared for
31 Mar 2023
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (11 Mar 2022)
  • II. LAYOUT PLAN — declared: already been obtained (20 Dec 2021)
  • III. FOREST NOC — declared: already been obtained (3 Jul 2020)
  • IV. POWER ASSURANCE — declared: already been obtained (13 Apr 2022)
On file with HARERA · 28 files

On file with HARERA (28)

Plans

Site plan

2 files
Superimposed Layout Plan10 Jun 2022Approved Site Plan20 Apr 2022

Layout plan

1 file
Latest Layout Plan3 Jun 2022

Demarcation plan

1 file
Demarcation Plan18 Apr 2022

Building plans

7 files
Standard Design Approval Letter3 Jun 2022Standard Design of SCO Type M13 Jun 2022Standard Design of SCO Type A3 Jun 2022

Services

Sewerage and drainage

2 files
Drainage Plan3 Jun 2022Sewer Plan3 Jun 2022

Roads

1 file
Road Plan3 Jun 2022

Landscape and green areas

1 file
Landscape Plan10 Jun 2022

Service plans

2 files
Service Estimates Applied3 Jun 2022Service Plans on the Layout20 Apr 2022

Approvals and clearances

Completion certificate (CC)

1 file
Completion Certificate17 Jul 2024

DTCP licence

1 file
Licence Copy with Land Schedule18 Apr 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration20 Apr 2022

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures3 Jun 2022Non-Default Certificate from a CA3 Jun 2022Cash Flow Statement3 Jun 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit20 Apr 2022

HARERA’s orders

HARERA’s orders

1 file
Extension No. 23 of 2023 dated 07.08.20235 Sept 2023

Other filings

Other filings

3 files
Project Continuation- RC/REP/HARERA/GGM/51 of 2022/7(3)/53/2024/12 Dated 07.08.20246 Sept 2024Domestic Plan3 Jun 2022Flushing Plan3 Jun 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

19 OF 2022 · Signature Global Developers Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 10 Mar 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 20 Apr 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

19 OF 2022: 3 parcels, 2.3875 acres in all, in Garauli kalan (hadbast 48), tehsil Kadipur.

The licence register prints the same licensed area, 2.3875 acres.

  • rectangle 257, kila 257/1/13 bigha 7 biswa 4 biswansi
  • rectangle 255, kila 255/26 biswa 15 biswansi
  • rectangle 257, kila 257/1/12 biswa 9 biswansi

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Garauli kalan (hadbast 48), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 257, kila 257/1/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Superimposed Layout Plan10 Jun 2022Approved Site Plan20 Apr 2022

Layout plan

1 file
Latest Layout Plan3 Jun 2022

Building plans

7 files
Standard Design Approval Letter3 Jun 2022Standard Design of SCO Type M13 Jun 2022Standard Design of SCO Type A3 Jun 2022Standard Design of SCO Type M23 Jun 2022Standard Design of SCO Type M53 Jun 2022Standard Design of SCO Type M33 Jun 2022Standard Design of SCO Type M43 Jun 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (28 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1923 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Signature Global

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.