AASHIYARA-II
by Renuka Traders · Sector 37C, Gurugram
Not on our price list yet
Possession 8 Dec 2025 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 37C, Gurugram2.5 km from Dwarka Expressway, in a straight line
- Registered by
- RENUKA TRADERS PRIVATE LIMITED.the company that filed it, for Renuka Traders
- 2 Aug 2021Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 8 Dec 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft646 sq ft276
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 11 rows of a single unit, because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads0.75 acres · 30%
- Parking0.669 acres · 26%
- Apartment buildings0.647 acres · 26%
- Other uses0.192 acres · 8%
- Electricity sub-station0.148 acres · 6%
- Sewage and waste treatment0.125 acres · 5%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenOil bound distemper
- LiftsAs per ISI standard
- FloorsTiles
- WallsOil bound distemper
- BathroomsISI marked CP fitting water closet and WASH basin
- WindowsAluminum powder coated/MS sections with 4-5 MM annealed ISI marked glass
- Main doorBoth side laminated flush doors
- Electrical fittingsISI marked switches and sockets
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20252.5 km
- Delhi–Gurugram–SNB RRTS2.6 km
- Sohna Elevated Corridor (NH-248A)4.5 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Other register states: 2
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Imperia Structures | Same sector | — | — | — |
ILD Millennium (Town)No photo on file yet | ILD Millennium | Same sector | — | — | 31 Mar 2023 |
OUR HOMESNo photo on file yet | Apex Buildwell | Same sector | — | — | 30 Sep 2020 |
| Emperium Infrastructure | Same sector | — | — | 30 Jun 2029 | |
AASHIYARANo photo on file yet | Renuka Traders | Same sector | — | — | 31 Jan 2023 |
RMG ResidencyNo photo on file yet | RMG Developers | Same sector | — | — | — |
No photo of the project on file yet | Signatureglobal Developers | 1.8 kmto its sector’s point | — | — | 28 Feb 2026 |
| BPTP | 1.8 kmto its sector’s point | — | — | 31 Jul 2020 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is AASHIYARA-II registered with HARERA?From the records · HARERA, read 3 Nov 2026
HARERA lists it as GGM/485/217/2021/53. The register’s record shows an end date of 8 Dec 2025. The register shows it as: Registration lapsed.
The source ↗What is the possession timeline for AASHIYARA-II?From the records · HARERA, read 3 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 8 Dec 2025. Its registration runs to 8 Dec 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around AASHIYARA-II?From the records · Map pin and road lines, read 6 Sep 2026
AASHIYARA-II is in Sector 37C, Gurugram; the site address declared to HARERA is Sector-37c, Village-Gharoli Khurd. In a straight line it is about 2.5 km from Dwarka Expressway, 2.6 km from Delhi–Gurugram–SNB RRTS and 4.5 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building AASHIYARA-II?From the records · HARERA, read 3 Nov 2026
AASHIYARA-II is a Renuka Traders project, registered by its company RENUKA TRADERS PRIVATE LIMITED..
The source ↗Renuka Traders's projects and court recordThe records
What the registers hold for AASHIYARA-II: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/485/217/2021/53: Registration lapsed. The register’s record shows an end date of 8 Dec 2025.HARERA, read 3 Nov 2026 · See it on HARERA ↗
- Land licence 9 OF 2020 is on the DTCP register: Licence lapsed; the register prints its validity to 8 Mar 2025.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 2 Aug 2021, building plans 2 Aug 2021.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Licence 9 OF 2020 lapsed
Named in this project’s application. Valid to 8 Mar 2025; the register’s note: “Merged With LC-3014B”. DTCP Haryana register, read 3 Nov 2026. Source
Amber flag: Registration lapsed
The register’s record shows an end date of 8 Dec 2025. HARERA Gurugram, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 35 HARERA files, with the dates we read them
- Registration no.
- GGM/485/217/2021/53
- Registration valid till
- 8 Dec 2025
- Declared possession
- 8 Dec 2025
Declared by the promoter to HARERA
- Land area
- 2.53125 (Acre) (10,243.61 sq m)
- FAR
- 2.37 proposed of 2.37 permissible
- licence
- License No. 09 of 2020
- Estimated project cost
- ₹70.48 crore
- Cost of land
- ₹4.15 crore
- Layout plan, declared approved (field 5a)
- 2 Aug 2021
- Building plans, declared approved
- 2 Aug 2021
- Construction to start
- 1 Oct 2021
- Completion declared for
- 8 Dec 2025
Declared inventory · 117 types
Declared inventory — 117 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 138 units · 59.985 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 138 units · 60 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 1 unit · 10.6 sq m carpet · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 10.6 sq m carpet · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 10.6 sq m carpet · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 10.6 sq m carpet · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 10.6 sq m carpet · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 10.6 sq m carpet · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 3
Statutory approvals, as declared
- I. AIRPORTS AUTHORITY OF INDIA — declared: already been obtained (28 Jul 2021)
- II. FOREST NOC — declared: already been obtained (18 Aug 2021)
- III. ENVIRONMENT CLEARANCE — declared: applied for but yet to receive (19 Jul 2021)
On file with HARERA · 35 files
On file with HARERA (35)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
12 filesServices
Sewerage and drainage
2 filesWater supply
2 filesRoads
1 fileLandscape and green areas
1 fileService plans
3 filesApprovals and clearances
DTCP licence
1 fileFire safety
1 fileOther NOCs and clearances
2 filesSales papers
Allotment and sale agreements
2 filesMoney
Accounts and finance
2 filesThe promoter’s papers
Declarations and affidavits
2 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
9 OF 2020 · RENUKA TRADERS PVT. LTD. · GURGAON-MANESAR
Licence valid to 8 Mar 2025
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 23 Aug 2021 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
9 OF 2020: 4 parcels, 2.5188 acres in all, in Garauli khurd (hadbast 106), tehsil Kadipur.
The licence register prints the licensed area as 2.5313 acres.
- 8//24/25 kanal 3 marla
- 13//2/2/13 kanal 13 marla
- 13//3/26 kanal 6 marla
- 13//4/1/25 kanal 1 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 23 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Garauli khurd (hadbast 106), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 8//24/2.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
12 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (35 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1632 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Renuka Traders
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.