ILD Millennium (Town)
by ILD Millennium · Sector 37C, Gurugram
Not on our price list yet
Possession 31 Mar 2023 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 37C, Gurugram2.5 km from Dwarka Expressway, in a straight line
- Registered by
- ILD MILLENNIUM PVT LTDthe company that filed it, for ILD Millennium
- 17 Jul 2017Registered with HARERAHARERA, read 4 Nov 2026
- 16 Feb 2020Registration valid toHARERA, read 4 Nov 2026
- 31 Mar 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Air-conditioningSplit/window
- KitchenModeler kitchen ceramic tiles and acrylic emulsion, ceramic tiles (anti skid), oil bound dismember, granite counter & stainless steel sink with drain board
- FloorsAcrylic emulsion paint finish verified tiles, oil oil bound dismember
- WallsMarble/granite cladding & acrylic emulsion paint
- BathroomsCeramic tiles and oil bound distumber, ceramic tiles (anti skid) oil bound distember, window/split
- WindowsHardwood door fraes with SKIN molded flush door shutters. powder coated/UPVC or anodized
- Electrical fittingsModuler swiches and sockets, copper wiring for light and POER
- Wi-Fi and broadbandProvision for internet and DTH connections. exclusively designed SKY terrace/party ZONE at terrace level
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20252.5 km
- Delhi–Gurugram–SNB RRTS2.6 km
- Sohna Elevated Corridor (NH-248A)4.5 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 1
- Other register states: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Imperia Structures | Same sector | — | — | — |
OUR HOMESNo photo on file yet | Apex Buildwell | Same sector | — | — | 30 Sep 2020 |
AASHIYARA-IINo photo on file yet | Renuka Traders | Same sector | — | — | 8 Dec 2025 |
| Emperium Infrastructure | Same sector | — | — | 30 Jun 2029 | |
AASHIYARANo photo on file yet | Renuka Traders | Same sector | — | — | 31 Jan 2023 |
RMG ResidencyNo photo on file yet | RMG Developers | Same sector | — | — | — |
No photo of the project on file yet | Signatureglobal Developers | 1.8 kmto its sector’s point | — | — | 28 Feb 2026 |
| BPTP | 1.8 kmto its sector’s point | — | — | 31 Jul 2020 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is ILD Millennium (Town) registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as 62 OF 2017, registered on 17 Jul 2017. The register’s record shows an end date of 16 Feb 2020. The register shows it as: Registration lapsed.
The source ↗What is the possession timeline for ILD Millennium (Town)?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Mar 2023. Its registration runs to 16 Feb 2020; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around ILD Millennium (Town)?From the records · Map pin and road lines, read 6 Sep 2026
ILD Millennium (Town) is in Sector 37C, Gurugram; the site address declared to HARERA is Sector 37c. In a straight line it is about 2.5 km from Dwarka Expressway, 2.6 km from Delhi–Gurugram–SNB RRTS and 4.5 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building ILD Millennium (Town)?From the records · HARERA, read 4 Nov 2026
ILD Millennium (Town) is a ILD Millennium project, registered by its company ILD MILLENNIUM PVT LTD.
The source ↗ILD Millennium's projects and court recordThe records
What the registers hold for ILD Millennium (Town): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration 62 OF 2017: Registration lapsed. The register’s record shows an end date of 16 Feb 2020.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 13 OF 2008 is on the DTCP register, valid to 30 Jan 2030.DTCP, read 3 Nov 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Amber flag: Registration lapsed
The register’s record shows an end date of 16 Feb 2020. HARERA Gurugram, read 4 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 25 HARERA files, with the dates we read them
- Registration no.
- 62 OF 2017
- Registration date
- 17 Jul 2017
- Registration valid till
- 16 Feb 2020
- Declared possession
- 31 Mar 2023
Declared by the promoter to HARERA
- Land area
- 3.6372 (Acre) (14,719.23 sq m)
- FAR
- 1.75 proposed of 1.75 permissible
- licence
- LICENCE NO. 13 OF 2008
- Estimated project cost
- ₹113.19 crore
- Cost of land
- ₹7.38 crore
- Completion declared for
- 31 Mar 2023
Declared inventory · 4 types
Declared inventory
- APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK · 136 units · 1,745 sq m carpet
- APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK · 68 units · 1,300 sq m carpet
- APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK · 8 units · 3,585 sq m carpet
- APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK · 4 units · 2,715 sq m carpet
Statutory approvals, as declared · 14
Statutory approvals, as declared
- I. LICENCE 13 OF 2008 DT 31.1.2008 — declared: already been obtained (31 Jan 2010)
- II. LICENCE RENEWED — declared: already been obtained (17 Aug 2016)
- III. FIRE SCHEME APPROVAL — declared: already been obtained (10 Oct 2014)
- IV. SITE PLAN — declared: already been obtained (10 Oct 2012)
- V. AIRPORT APAPROVAL — declared: already been obtained (23 Oct 2015)
- VI. SEWAGE CONNECTIVITY — declared: already been obtained (31 Oct 2016)
- VII. WATER SUPPLY — declared: already been obtained (6 Sept 2016)
- VIII. CONSENT TO ESTABLISH — declared: already been obtained (12 Aug 2014)
- IX. ZONING PLAN — declared: already been obtained (11 Dec 2011)
- X. ELECTRICAL APPROVAL — declared: already been obtained (4 May 2017)
- XI. POLLUTION APPROVAL — declared: already been obtained (21 Jan 2010)
- XII. BUILDING PLAN — declared: already been obtained (5 Jun 2015)
- XIII. SERVICE ESTIMATE — declared: already been obtained (23 Aug 2016)
- XIV. LICENCE RENWAL — declared: applied for but yet to receive (8 Jan 2018)
On file with HARERA · 25 files
On file with HARERA (25)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
6 filesServices
Landscape and green areas
1 fileService plans
2 filesApprovals and clearances
DTCP licence
1 fileLand records
Land records
1 fileSales papers
Allotment and sale agreements
1 fileMoney
Accounts and finance
6 filesThe promoter’s papers
Declarations and affidavits
2 filesOther filings
Other filings
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
13 OF 2008 · ALM Infotech City Pvt. Ltd · GURGAON-MANESAR
Licence valid to 30 Jan 2030
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 21 Jan 2020 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
13 OF 2008: 9 parcels, 15.4828 acres in all, in Basai (hadbast 50), tehsil Kadipur.
The licence register prints the same licensed area, 15.4829 acres.
- rectangle 742, kila 742/21 bigha 3 biswa 17 biswansi
- rectangle 743, kila 7437 bigha 8 biswa
- rectangle 745, kila 745/21 bigha 13 biswa 13 biswansi
- rectangle 469, kila 469/2 min3 bigha 6 biswa 15 biswansi
Show the other 5 parcels
- rectangle 468, kila 468/22 bigha 8 biswa
- rectangle 746, kila 746 min2 bigha 7 biswa
- rectangle 746, kila 746 min2 bigha 8 biswa
- rectangle 742, kila 742/1/22 bigha 6 biswa 8 biswansi
- rectangle 745, kila 745/11 bigha 13 biswa 16 biswansi
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Basai (hadbast 50), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as rectangle 742, kila 742/2.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹6,500 per sq ft
this sector, collector rates effective 1 Apr 2026, Kadipur tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
6 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (25 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1187 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on ILD Millennium
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

