Possession 31 Dec 2028 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 108, Gurugram2.7 km from Dwarka Expressway, in a straight line
Carpet area
1,103–1,912 sq ft
In m²about 102–178 m², as declared
Registered by
SOBHA LIMITEDthe company that filed it, for Sobha
Timeline
  1. 27 Sep 2022Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

395homes, 1,103 to 1,912 sq ft of carpet area
  • 1,000–1,500 sq ft1,103–1,353 sq ft50
  • 1,500–2,000 sq ft1,582–1,912 sq ft345

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 1 row of a single unit, because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside16.4 acres in all, by use
  • Other usesas the form names them: Rain6.296 acres · 38%
  • Roads3.729 acres · 23%
  • Parks and playgrounds3.035 acres · 19%
  • School1.404 acres · 9%
  • Apartment buildings1.038 acres · 6%
  • Club house0.383 acres · 2%
  • Parking0.25 acres · 2%
  • Shops and offices0.188 acres · 1%
  • Sewage and waste treatment0.076 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenCeramic tile flooring, wall tiling & plastic emulsion paint for ceiling
  • Lifts3 lifts in each tower
  • FloorsNatural / engineered stone flooring and skirting/ laminated wooden flooring and skirting / vitrified tile flooring and skirting /ceramic tile
  • WallsFor internal walls, plastic emulsion paint / ceramic wall tiling wherever applicable & textured paint for external walls
  • BathroomsReputed make of CP fittings & sanitary WARE
  • WindowsHeavy-DUTY aluminium glazed sliding windows & french windows MADE from specially designed and manufactured sections
  • Main door• frame – timber. shutters – with both side masonite SKIN
  • Electrical fittingsFitting of reputed make approved by ISI & is specification

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 108, GurugramSector 108, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20252.7 km
  • Delhi–Gurugram–SNB RRTS7.5 km
  • Sohna Elevated Corridor (NH-248A)9.1 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 11 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 6
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is SOBHA CITY, PHASE-6 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/620/352/2022/95. Valid to 31 Dec 2028.

The source ↗
What is the possession timeline for SOBHA CITY, PHASE-6?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2028. Its registration runs to 31 Dec 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SOBHA CITY, PHASE-6?From the records · Map pin and road lines, read 6 Sep 2026

SOBHA CITY, PHASE-6 is in Sector 108, Gurugram; the site address declared to HARERA is Revenue Estate Of Babupur Village, Village Babupur, Sector-108, Gurugram, Haryana. In a straight line it is about 2.7 km from Dwarka Expressway, 7.5 km from Delhi–Gurugram–SNB RRTS and 9.1 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SOBHA CITY, PHASE-6?From the records · HARERA, read 4 Nov 2026

SOBHA CITY, PHASE-6 is a Sobha project, registered by its company SOBHA LIMITED.

The source ↗Sobha's projects and court record

The records

What the registers hold for SOBHA CITY, PHASE-6: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/620/352/2022/95: Registered. Valid to 31 Dec 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 107 OF 2008 is on the DTCP register, valid to 26 May 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 27 Sep 2022, building plans 27 Sep 2022.Declared to HARERA, read 29 Oct 2026
The court record of Sobha’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 60 HARERA files, with the dates we read them
Registration no.
GGM/620/352/2022/95
Registration valid till
31 Dec 2028
Declared possession
31 Dec 2028

Declared by the promoter to HARERA

Land area
16.3995 (Acre) (66,366.42 sq m)
FAR
1.74 proposed of 1.75 permissible
licence
107 of 2008 dated 27.05.2008 valid upto 26.05.2025
Estimated project cost
₹1168.45 crore
Cost of land
₹444.96 crore
Layout plan, declared approved (field 5a)
27 Sept 2022
Building plans, declared approved
27 Sept 2022
Construction to start
1 Mar 2023
Completion declared for
31 Dec 2028
Declared inventory · 9 types

Declared inventory — 9 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 205 units · 148.35 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 10 units · 125.73 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 4 units · 124.86 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 68 units · 146.94 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 36 units · 177.6 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 36 units · 176.55 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 34 units · 125.25 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 102.51 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 9

Statutory approvals, as declared

  • I. LICENCE — declared: already been obtained (27 May 2008)
  • II. FOREST NOC — declared: already been obtained (23 Oct 2013)
  • III. ELECTRICAL CONNECTION APPROVAL — declared: already been obtained (15 Nov 2019)
  • IV. HUDA CONNECTION WATER NOC — declared: already been obtained (13 May 2022)
  • V. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (18 Jul 2018)
  • VI. FOREST NOC — declared: already been obtained (23 Oct 2013)
  • VII. ENVIRONMENT CLEARANCE — declared: already been obtained (29 Aug 2017)
  • VIII. FIRE SCHEME APPROVAL — declared: applied for but yet to receive (7 Sept 2022)
  • IX. SERVICE ESTIMATES PLAN — declared: applied for but yet to receive (4 Oct 2022)
On file with HARERA · 60 files

On file with HARERA (60)

Plans

Site plan

3 files
Electricity Supply Plan-Site Plan 17.08.202218 Oct 2022Layout Superimposed on the Demarcation12 Oct 2022Approved Site Plan6 Sept 2022

Layout plan

1 file
Latest Layout Plan7 Sept 2022

Zoning plan

1 file
Zoning Plan7 Sept 2022

Demarcation plan

1 file
Demarcation Plan7 Sept 2022

Building plans

18 files
D1 & D2 Section -B18 Oct 2022D3 & D4, Section-B18 Oct 2022D1 & D2 Elevation-A18 Oct 2022

Floor plans

10 files
Basement Floor Plan Part-02 - Parking18 Oct 2022Stilt Floor Plan Part-02 - Parking18 Oct 2022Parking Basement and Stilt18 Oct 2022

Services

Sewerage and drainage

2 files
Sewerage Plan12 Oct 2022Storm Water Drainage Plan12 Oct 2022

Water supply

1 file
Water Supply Plan12 Oct 2022

Electricity

1 file
Street Lighting Layout18 Oct 2022

Roads

1 file
Road Plan12 Oct 2022

Landscape and green areas

1 file
Landscape Layout18 Oct 2022

Service plans

3 files
Service Plan Applied Ack18 Oct 2022Solid Waste Management Plan12 Oct 2022Service Plans on the Layout12 Oct 2022

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate21 Oct 2026

DTCP licence

3 files
Licence Copy with Land Schedule6 Sept 2022LC-IV6 Sept 2022LOI6 Sept 2022

Environment clearance

1 file
Environment Clearance6 Sept 2022

Fire safety

2 files
Fire Scheme Plan12 Oct 2022Fire NOC6 Sept 2022

Other NOCs and clearances

3 files
Bip Permission18 Oct 2022Airport Height Clearance6 Sept 2022Forest NOC6 Sept 2022

Land records

Land records

2 files
Revenue Record Entry of Licence and Collaboration12 Oct 2022Non Encumbrance Certificate12 Oct 2022

Money

Accounts and finance

3 files
Non-Default Certificate from a CA12 Oct 2022CA Certificate on the Application’s Figures12 Oct 2022Cash Flow Statement12 Oct 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit12 Oct 2022

Company papers

1 file
Board Resolution6 Sept 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

107 OF 2008 · Shobha Ltd. (Transferred from Chintel India Ltd. on 19/04/2017) · GURGAON-MANESAR

Licence valid to 26 May 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 8 Dec 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

107 OF 2008

DTCP’s page showed no land schedule for licence 107 OF 2008 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate

No one collector rate can be matched to this project's type.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “Sobha City Phase 6”, by M/s Sobha Limited, code Gurgaon-0426-007172, approved 2026.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Electricity Supply Plan-Site Plan 17.08.202218 Oct 2022Layout Superimposed on the Demarcation12 Oct 2022Approved Site Plan6 Sept 2022

Layout plan

1 file
Latest Layout Plan7 Sept 2022

Building plans

18 files
D1 & D2 Section -B18 Oct 2022D3 & D4, Section-B18 Oct 2022D1 & D2 Elevation-A18 Oct 2022D3 & D4, Elevation-A18 Oct 2022Gf Plan & Elevation Community Center-0218 Oct 2022Z1 & Z2, Elevation -A & Section-B18 Oct 2022

Floor plans

10 files
Basement Floor Plan Part-02 - Parking18 Oct 2022Stilt Floor Plan Part-02 - Parking18 Oct 2022Parking Basement and Stilt18 Oct 2022Parking Plan12 Oct 2022Apartment Plans-Tower D112 Oct 2022Apartment Plans-Tower D212 Oct 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (60 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2106 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Sobha

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.