₹14,000 a sq ftof carpet area
Bhumiq team price list, 16 Sep 2026: an asking rate, not a registry figure.
Possession 31 Mar 2029 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 83, Gurugram0.8 km from Delhi–Gurugram–SNB RRTS, in a straight linePrices and what changed
- Asking rate
- ₹14,000 a sq ft of carpet
- Registered by
- A & D ESTATES PRIVATE LIMITEDthe company that filed it, for SS Group
- 5 Jun 2023Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Mar 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft862 sq ft640
- 1,000–1,500 sq ft1,089 sq ft660
- 3,000 sq ft and above3,218 sq ft36
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 236 units under 25 m², because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads18,747 m² · 37%
- Parks and playgrounds8,151 m² · 16%
- Apartment buildings8,004 m² · 16%
- Other usesas the form names them: Open, Shopping, Area7,329 m² · 14%
- School2,832 m² · 6%
- Green belts2,515 m² · 5%
- Parking1,710 m² · 3%
- Club house1,137 m² · 2%
- Electricity sub-station614 m² · 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningSplit AIR conditioner
- KitchenGlazed 600MM high tiles above counterlevel & balance OBD
- Lifts03 NOS passenger lift and one NOS service lift
- FloorsVitrified tiles as per approved make
- WallsExternal- texture paint internal- oil bound distemper
- BathroomsSingle lever CP fittings WASH basin, wall hanging WC 9super quality)
- WindowsUPVC frame with plain glass
- Main doorSolid decorative flush doors
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Delhi–Gurugram–SNB RRTS0.8 km
- Dwarka ExpresswayOpen, 17 Aug 20251.6 km
- Sohna Elevated Corridor (NH-248A)6.8 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 5
- Registered, no OC or CC yet: 5
- Other register states: 4
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Vatika Group | Same sector | — | — | 30 Jan 2025 | |
ATULYAM 83No photo on file yet | Pegasus Developers | Same sector | — | — | 31 Mar 2026 |
| Emaar MGF Land | Same sector | — | — | 31 Aug 2022 | |
| Vatika Group | Same sector | — | — | 30 Jul 2022 | |
No photo of the project on file yet | Spaze Towers | 1.5 kmto its sector’s point | — | — | — |
| Vatika Group | 1.5 kmto its sector’s point | — | — | 31 Jan 2025 | |
No photo of the project on file yet | SS Group | 1.5 kmto its sector’s point | — | — | 31 Jul 2024 |
GRATITUDE 84No photo on file yet | Lamose Infra | 1.5 kmto its sector’s point | — | — | 30 Apr 2032 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is SS Cendana Residences registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/733/465/2023/77. Valid to 31 Mar 2029.
The source ↗What is the possession timeline for SS Cendana Residences?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Mar 2029. Its registration runs to 31 Mar 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around SS Cendana Residences?From the records · Map pin and road lines, read 6 Sep 2026
SS Cendana Residences is in Sector 83, Gurugram; the site address declared to HARERA is Village Sihi, Sector 83. In a straight line it is about 0.8 km from Delhi–Gurugram–SNB RRTS, 1.6 km from Dwarka Expressway and 6.8 km from Sohna Elevated Corridor (NH-248A).
The source ↗What does a home in SS Cendana Residences cost, and how does that compare nearby?From the records · Bhumiq team price list, 16 Sep 2026
The Bhumiq team's price list has ₹14,000 a sq ft of carpet area (16 Sep 2026). Prices change; ask the developer for its current price list.
What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyThe records
What the registers hold for SS Cendana Residences: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/733/465/2023/77: Registered. Valid to 31 Mar 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 195 OF 2008 is on the DTCP register, valid to 21 Nov 2030.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 5 Jun 2023, building plans 5 Jun 2023.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 57 HARERA files, with the dates we read them
- Registration no.
- GGM/733/465/2023/77
- Registration valid till
- 31 Mar 2029
- Declared possession
- 31 Mar 2029
- Asking price (indicative)
- ₹14,000 / sq ft of carpet area
Bhumiq team price list · as of 16 Sept 2026 · a quoted rate, not a registry figure
Declared by the promoter to HARERA
- Land area
- 12.61175 (Acre) (51,037.94 sq m)
- FAR
- the application prints 349, which is not a ratio
- licence
- 195 OF 2008 DATED 21.11.2008 (RENEWED UPTO 21.11.2025) FOR AN AREA OVER 11.418 ACRES AND 15 OF 2023 DATED 30.01.2023 VALID UPTO 29.01.2028 FOR AN AREA OF 1.19375 ACRES.
- Estimated project cost
- ₹1043.13 crore
- Cost of land
- ₹28.15 crore
- Layout plan, declared approved (field 5a)
- 5 Jun 2023
- Building plans, declared approved
- 5 Jun 2023
- Construction to start
- 1 Jul 2023
- Completion declared for
- 31 Mar 2029
Declared inventory · 4 types
Declared inventory
- Apartment/Shops/Other Buildings · 36 units · 298.96 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 660 units · 101.17 sq m carpet · 5 towers · one flat
- Apartment/Shops/Other Buildings · 640 units · 80.08 sq m carpet · 5 towers · one flat
- Apartment/Shops/Other Buildings · 236 units · 17.67 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 11
Statutory approvals, as declared
- I. BUILDING PLAN APPROVAL — declared: already been obtained (5 Jun 2023)
- II. LICENSE — declared: already been obtained (1 Feb 2023)
- III. ZONING PLAN — declared: already been obtained (6 Feb 2023)
- IV. DEMARCATION PLAN — declared: already been obtained (6 Feb 2023)
- V. ELECTRICITY LOAD ASSURANCE — declared: already been obtained (3 Apr 2023)
- VI. WATER SUPPLY ASSURANCE — declared: already been obtained (24 Mar 2023)
- VII. STORM WATER CONNECTION ASSURANCE — declared: already been obtained (24 Mar 2023)
- VIII. FOREST NOC — declared: already been obtained (18 Nov 2022)
- IX. SEWERAGE CONNECTION ASSURANCE — declared: already been obtained (24 Mar 2023)
- X. LAYOUT PLAN — declared: already been obtained (5 Jun 2023)
- XI. ENVIRONMENT CLEARANCE — declared: applied for but yet to receive (13 Jan 2023)
On file with HARERA · 57 files
On file with HARERA (57)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
2 filesBuilding plans
14 filesFloor plans
11 filesServices
Water supply
4 filesService plans
1 fileApprovals and clearances
DTCP licence
1 fileEnvironment clearance
1 fileOther NOCs and clearances
3 filesLand records
Land records
1 fileMoney
Accounts and finance
4 filesThe promoter’s papers
Declarations and affidavits
3 filesHARERA’s orders
HARERA’s orders
1 fileOther filings
Other filings
8 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The 2 DTCP licences named on the application
195 OF 2008 · A & D Estate · GURGAON-MANESAR
Licence valid to 21 Nov 2030
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
15 OF 2023 · A & D Estate Pvt. Ltd. · GURGAON-MANESAR
Licence valid to 29 Jan 2028
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 8 Jun 2023 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the 2 licences
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
195 OF 2008
DTCP’s page showed no land schedule for licence 195 OF 2008 when Bhumiq read it on 18 Oct 2026. verify at source
15 OF 2023: 9 parcels, 1.1938 acres in all, in Sihi (hadbast 108), tehsil Manesar.
The licence register prints the same licensed area, 1.1938 acres.
- 47//19/213 marla
- 47//20/1/214 marla
- 47//20/2/24 marla
- 47//21/1/18 marla
Show the other 5 parcels
- 47//21/2/11 kanal 12 marla
- 47//22/1/12 kanal
- 47//23/1/11 kanal 2 marla
- 48//16/218 marla
- 48//25/12 kanal
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Sihi (hadbast 108), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 47//19/2.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No collector rate for a residential flat in Sector 83 in the lists Bhumiq reads, as of 28 Aug 2026. That is not confirmation that none exists.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
14 filesFloor plans
11 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (57 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/2433 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on SS Group
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.