URBAN RESORT PHASE-3

by Whiteland Corporation · Sector 103, Gurugram

Not on our price list yet

Possession 30 Sep 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 103, Gurugram0.9 km from Dwarka Expressway, in a straight line
Registered by
WHITELAND CORPORATION PVT LTDthe company that filed it, for Whiteland Corporation
Timeline
  1. 16 May 2024Layout and building plans approveddeclared to HARERA, read 15 Oct 2026
  2. 30 Sep 2031Possession, as declareddeclared to HARERA, read 15 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.832 acres in all, by use
  • Other uses0.817 acres · 29%
  • Roads0.625 acres · 22%
  • Pavements0.55 acres · 19%
  • Apartment buildings0.515 acres · 18%
  • Parks and playgrounds0.325 acres · 11%

The land-use table of the HARERA application, declared to HARERA, read 15 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVariable RATE FLOW system
  • FloorsVitrified tile, laminate wooden flooring
  • WallsPremium acrylic distemper
  • WindowsFull height windows- aluminium poder coated sections
  • Electrical fittingsElectric point
  • Water storageYes

The developer’s specifications in the HARERA application, declared to HARERA, read 15 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 103, GurugramSector 103, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.9 km
  • Delhi–Gurugram–SNB RRTS6.3 km
  • Sohna Elevated Corridor (NH-248A)7.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 12 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 3
  • Registered, no OC or CC yet: 9

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is URBAN RESORT PHASE-3 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/840/572/2024/67. Valid to 30 Sep 2031.

The source ↗
What is the possession timeline for URBAN RESORT PHASE-3?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2031. Its registration runs to 30 Sep 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around URBAN RESORT PHASE-3?From the records · Map pin and road lines, read 6 Sep 2026

URBAN RESORT PHASE-3 is in Sector 103, Gurugram; the site address declared to HARERA is Revenue Estate Of Village Dhanwapur, Sector-103, Gurugram. In a straight line it is about 0.9 km from Dwarka Expressway, 6.3 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building URBAN RESORT PHASE-3?From the records · HARERA, read 4 Nov 2026

URBAN RESORT PHASE-3 is a Whiteland Corporation project, registered by its company WHITELAND CORPORATION PVT LTD.

The source ↗Whiteland Corporation's projects and court record

The records

What the registers hold for URBAN RESORT PHASE-3: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/840/572/2024/67: Registered. Valid to 30 Sep 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 263 OF 2023 is on the DTCP register, valid to 11 Dec 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 16 May 2024, building plans 16 May 2024.Declared to HARERA, read 15 Oct 2026
The court record of Whiteland Corporation’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 37 HARERA files, with the dates we read them
Registration no.
GGM/840/572/2024/67
Registration valid till
30 Sept 2031
Declared possession
30 Sept 2031

Declared by the promoter to HARERA

Land area
2.832 (Acre) (11,460.7 sq m)
FAR
3.33 proposed of 3.5 permissible
licence
263 of 2023 dated 12.12.2023
Estimated project cost
₹112.75 crore
Cost of land
₹4.76 crore
Layout plan, declared approved (field 5a)
16 May 2024
Building plans, declared approved
16 May 2024
Construction to start
1 Jul 2024
Completion declared for
30 Sept 2031
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 1 unit · 1,901.13 sq m carpet · 1 tower
  • Apartment/Shops/Other Buildings · 1 unit · 611.63 sq m carpet · 1 tower
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. REVISED ZONING PLAN — declared: already been obtained (16 May 2024)
  • II. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (11 Jan 2024)
  • III. FOREST NOC — declared: already been obtained (20 Nov 2021)
  • IV. BUILDING PLAN — declared: already been obtained (16 May 2024)
  • V. EC — declared: already been obtained (5 Jun 2024)
  • VI. ELECTRICAL LOAD ASSURANCE — declared: already been obtained (22 Feb 2024)
  • VII. SEWAGE ASSURANCE — declared: already been obtained (5 Feb 2024)
  • VIII. STORM WATER DRAINAGE — declared: already been obtained (6 Feb 2024)
  • IX. WATER ASSURANCE — declared: already been obtained (13 Feb 2024)
  • X. LICENCE 263 OF 2023 — declared: already been obtained (12 Dec 2023)
On file with HARERA · 37 files

On file with HARERA (37)

Plans

Site plan

2 files
Approved Site Plan20 Jun 2024Site Plan Area Calculation20 Jun 2024

Layout plan

1 file
Latest Layout Plan20 Jun 2024

Zoning plan

1 file
Zoning Plan20 Jun 2024

Demarcation plan

1 file
Demarcation Plan24 May 2024

Building plans

1 file
BR III20 Jun 2024

Floor plans

5 files
Basement 2 Plan20 Jun 2024Commercial Floor Plan Gf and Ff20 Jun 2024Basement 4 Plan20 Jun 2024

Services

Sewerage and drainage

2 files
Storm Water Layout20 Jun 2024Sewerage Layout20 Jun 2024

Water supply

2 files
Recycle Water Layout20 Jun 2024Domestic Water Layout20 Jun 2024

Roads

1 file
Road Plan Layout20 Jun 2024

Service plans

1 file
Service Plans on the Layout20 Jun 2024

Approvals and clearances

DTCP licence

3 files
LC IV20 Jun 2024Licence Copy with Land Schedule20 Jun 2024LOI20 Jun 2024

Environment clearance

1 file
EC Approved20 Jun 2024

Fire safety

1 file
Fire Fighting Layout20 Jun 2024

Other NOCs and clearances

2 files
AAI24 May 2024Forest NOC24 May 2024

Land records

Land records

6 files
Non Encumbrance Certificate20 Jun 2024Revenue Record Entry of Licence and Collaboration20 Jun 2024Jamabandi20 Jun 2024

Money

Accounts and finance

5 files
Non-Default Certificate from a CA20 Jun 2024CA Inventory Certificate PHASE320 Jun 2024Cash Flow Statement20 Jun 2024

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit20 Jun 2024

HARERA’s orders

HARERA’s orders

1 file
Addendum to the Registration Certificate- Revision in Building Plans13 Jun 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

263 OF 2023 · Whiteland Corporation Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 11 Dec 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 25 May 2024 · read 15 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

263 OF 2023: 14 parcels, 9.5042 acres in all, in Dhanwapur (hadbast 51), tehsil Kadipur.

The licence register prints the licensed area as 9.5813 acres.

  • 3//227 kanal 7 marla
  • 3//23/1/12 kanal 8 marla
  • 3//2812 marla
  • 9//158 kanal
Show the other 10 parcels
  • 9//68 kanal
  • 10//16 kanal 19 marla
  • 10//107 kanal 8 marla
  • 10//21/1/1/214 marla
  • 9//58 kanal
  • rectangle 9, kila 16/1 min5 kanal 18 marla
  • 10//20/13 kanal 11 marla
  • 10//20/23 kanal
  • rectangle 10, kila 117 kanal 8 marla
  • rectangle 3, kila 21 min6 kanal 15 marla 6 sarsai

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Dhanwapur (hadbast 51), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 3//22.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Approved Site Plan20 Jun 2024Site Plan Area Calculation20 Jun 2024

Layout plan

1 file
Latest Layout Plan20 Jun 2024

Building plans

1 file
BR III20 Jun 2024

Floor plans

5 files
Basement 2 Plan20 Jun 2024Commercial Floor Plan Gf and Ff20 Jun 2024Basement 4 Plan20 Jun 2024Basement 1 Plan20 Jun 2024Basement 3 Plan20 Jun 2024

Among the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (37 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2968 · read 15 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Whiteland Corporation

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.