83 Metro Street

by S.V. Housing · Sector 83, Gurugram

Not on our price list yet

Possession 30 Sep 2022 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 83, Gurugram0.8 km from Delhi–Gurugram–SNB RRTS, in a straight linePrices and what changed
Carpet area
about 286 sq ft
In m²about 26.6 m², the average flat, as declared
Registered
27 Oct 2017
Registered by
S V HOUSING PRIVATE LIMITEDthe company that filed it, for S.V. Housing
Timeline
  1. 10 Oct 2017Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 27 Oct 2017Registered with HARERAHARERA, read 3 Nov 2026
  3. 25 Oct 2019Layout plan approveddeclared to HARERA, read 29 Oct 2026
  4. 30 Mar 2021Registration valid toHARERA, read 3 Nov 2026
  5. 30 Sep 2022Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside16,997 m² in all, by use
  • Apartment buildings5,588 m² · 33%
  • Other uses4,752 m² · 28%
  • Roads3,513 m² · 21%
  • Parking2,372 m² · 14%
  • Parks and playgrounds770 m² · 5%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningChilled water & DX system
  • Lifts10 NOS
  • FloorsStone / tile flooring in common areas
  • WallsCement plaster & paint in common areas
  • BathroomsWhite chinaware with CP fittings
  • WindowsAluminium frames with glass
  • Main doorCommercial flush door shutters / glass doors
  • Electrical fittingsElectrical fittings & fixtures not provided

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 83, GurugramSector 83, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS0.8 km
  • Dwarka ExpresswayOpen, 17 Aug 20251.6 km
  • Sohna Elevated Corridor (NH-248A)6.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is 83 Metro Street registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as 337 OF 2017, registered on 27 Oct 2017. The register’s record shows an end date of 30 Mar 2021. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for 83 Metro Street?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2022. Its registration runs to 30 Mar 2021; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around 83 Metro Street?From the records · Map pin and road lines, read 6 Sep 2026

83 Metro Street is in Sector 83, Gurugram; the site address declared to HARERA is Sector-83, Village-Sihi, Gurugram, Haryana. In a straight line it is about 0.8 km from Delhi–Gurugram–SNB RRTS, 1.6 km from Dwarka Expressway and 6.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building 83 Metro Street?From the records · HARERA, read 3 Nov 2026

83 Metro Street is a S.V. Housing project, registered by its company S V HOUSING PRIVATE LIMITED.

The source ↗S.V. Housing's projects and court record

The records

What the registers hold for 83 Metro Street: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 337 OF 2017: Registration lapsed. The register’s record shows an end date of 30 Mar 2021.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 110 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 25 Oct 2023.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 25 Oct 2019, building plans 10 Oct 2017.Declared to HARERA, read 29 Oct 2026
The court record of S.V. Housing’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 110 OF 2012 lapsed

    Named in this project’s application. Valid to 25 Oct 2023; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 30 Mar 2021. HARERA Gurugram, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 43 HARERA files, with the dates we read them
Registration no.
337 OF 2017
Registration date
27 Oct 2017
Registration valid till
30 Mar 2021
Declared possession
30 Sept 2022

Declared by the promoter to HARERA

Land area
4.20 (Acre) (16,996.8 sq m)
FAR
1.75 proposed of 1.75 permissible
licence
110 OF 2012 (26/10/2012)
Estimated project cost
₹256.20 crore
Cost of land
₹43.80 crore
Layout plan, declared approved (field 5a)
25 Oct 2019
Building plans, declared approved
10 Oct 2017
Construction to start
14 Mar 2018
Completion declared for
30 Sept 2022
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 700 units · 18,590.852 sq m carpet · 1 tower · total for 700 flats, about 26.6 m² each
Statutory approvals, as declared · 13

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (26 Oct 2012)
  • II. BUILDING PLAN APPROVAL — declared: already been obtained (6 Apr 2018)
  • III. REVISED BUILDING PLAN APPROVAL — declared: already been obtained (25 Oct 2019)
  • IV. ENVIRONMENT CLEARANCE — declared: already been obtained (30 Jan 2018)
  • V. HEIGHT CLEARANCE — declared: already been obtained (21 Mar 2018)
  • VI. MINING PERMISSION — declared: already been obtained (14 Mar 2018)
  • VII. CONSENT TO ESTABLISH — declared: already been obtained (8 Mar 2018)
  • VIII. ARAVALI NOC — declared: already been obtained (30 May 2013)
  • IX. FOREST NOC — declared: already been obtained (18 Apr 2013)
  • X. ASSURANCE OF FRESH WATER SUPPLY — declared: already been obtained (12 Oct 2017)
  • XI. ASSURANCE FOR STP WATER FOR CONSTRUCTION — declared: already been obtained (16 Oct 2017)
  • XII. ASSURANCE OF ULTIMATE POWER LOAD — declared: already been obtained (5 Dec 2014)
  • XIII. ASSURANCE FOR SEWERAGE CONNECTION — declared: already been obtained (16 Oct 2017)
On file with HARERA · 43 files

On file with HARERA (43)

Plans

Site plan

2 files
Site Plan22 Nov 2019Approved Site Plan22 Nov 2019

Layout plan

1 file
Latest Layout Plan27 Nov 2019

Zoning plan

1 file
Zoning Plan22 Nov 2019

Building plans

6 files
Building Plan Approval22 Nov 2019Detail of Permissible FAR22 Nov 2019Revised Building Plans Approval22 Nov 2019

Services

Sewerage and drainage

2 files
Assurance for STP Water for Construction22 Nov 2019Assurance for Sewerage Connection22 Nov 2019

Water supply

1 file
Assurance of Fresh Water Supply22 Nov 2019

Electricity

1 file
Assurance of Ultimate Power Load22 Nov 2019

Service plans

8 files
Service Plan Drawings12 Feb 2020Service Plan Drawing-111 Feb 2020Service Plan Drawing-211 Feb 2020

Approvals and clearances

DTCP licence

3 files
LC-IV11 Feb 2020LOI11 Feb 2020Licence Copy with Land Schedule22 Nov 2019

Environment clearance

1 file
Environment Clearance22 Nov 2019

Fire safety

1 file
Fire Scheme Approval11 Feb 2020

Other NOCs and clearances

5 files
Height Clearance22 Nov 2019Mining Permission22 Nov 2019Consent to Establish22 Nov 2019

Land records

Land records

2 files
Non-Encumbrance Certificate11 Feb 2020Entry of License in Revenue Record11 Feb 2020

Sales papers

Allotment and sale agreements

3 files
Inventory Sheet3 Jan 2020Copy of the Draft Allotment Letter22 Nov 2019Copy of the Draft Agreement22 Nov 2019

Money

Accounts and finance

4 files
Board Resolution of All Signatories to Operate the Bank Account11 Feb 2020Copy of the Balance Sheet of Last 3 Years23 Nov 2019Non-Default Certificate from a CA22 Nov 2019Project Report22 Nov 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit22 Nov 2019

HARERA’s orders

HARERA’s orders

1 file
RERA Registration Certificate23 Nov 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

110 OF 2012 · S.V. Housing Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 25 Oct 2023

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 27 Nov 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

110 OF 2012: 13 parcels, 4.2 acres in all, in Sihi (hadbast 108), tehsil Manesar.

The licence register prints the same licensed area, 4.2 acres.

  • 43//158 kanal
  • 43//16/11 kanal 7 marla
  • 43//16/2/21 kanal 12 marla
  • 43//16/2/32 kanal 13 marla
Show the other 9 parcels
  • 43//517 marla
  • 43//66 kanal 17 marla
  • 44//1016 marla
  • 44//116 kanal 15 marla
  • 44//12/118 marla
  • 44//19/21 kanal
  • 44//20/12 kanal
  • 44//20/3/25 marla
  • 44//20/3/412 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Sihi (hadbast 108), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 43//15.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹1,64,000 per sq yd

Sector 83, collector rates effective 1 Apr 2026, Manesar tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “83 Metro Street”, by SV Housing Private Limited, code Gurgaon-1024-005576, approved 2024.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan22 Nov 2019Approved Site Plan22 Nov 2019

Layout plan

1 file
Latest Layout Plan27 Nov 2019

Building plans

6 files
Building Plan Approval22 Nov 2019Detail of Permissible FAR22 Nov 2019Revised Building Plans Approval22 Nov 2019Detail of Covered Area Achieved FAR22 Nov 2019Approved Building Plans, Full Set22 Nov 2019Elevation Section22 Nov 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (43 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/936 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on S.V. Housing

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.