KLJ Square
by KLJ Realtech · Sector 83, Gurugram
Not on our price list yet
Possession 31 Dec 2023 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 83, Gurugram0.8 km from Delhi–Gurugram–SNB RRTS, in a straight linePrices and what changed
- Carpet area
- about 709 sq ft
In m²
about 65.9 m², the average flat, as declared - Registered by
- KLJ REALTECH PRIVATE LIMITEDthe company that filed it, for KLJ Realtech
- 19 Sep 2017Registered with HARERAHARERA, read 4 Nov 2026
- 16 Sep 2020Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Dec 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026
- 30 Jun 2024Registration valid toHARERA, read 4 Nov 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings5,023 m² · 35%
- Green belts4,390 m² · 31%
- Roads3,827 m² · 27%
- Parking1,150 m² · 8%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningCentral AIR conditioning
- KitchenGranite counter
- LiftsHigh speed lifts
- FloorsGranite/vitrified tiles/kotah stone
- WallsGranite on lift lobbies. plaster and acrylic paint
- BathroomsVitrified tile flooring/ceramic tile DODO
- WindowsStructural glazing with DGU/aluminium glazings
- Main doorGlass doors in commercial areas
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Delhi–Gurugram–SNB RRTS0.8 km
- Dwarka ExpresswayOpen, 17 Aug 20251.6 km
- Sohna Elevated Corridor (NH-248A)6.8 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Ansal Housing & Construction | Same sector | — | — | 31 Dec 2021 |
83 Metro StreetNo photo on file yet | S.V. Housing | Same sector | — | — | 30 Sep 2022 |
83 AvenueNo photo on file yet | Real Town Properties | Same sector | — | — | — |
No photo of the project on file yet | Ansal Housing & Construction | Same sector | — | — | — |
| Vatika Group | Same sector | — | — | 30 Jan 2025 | |
ATULYAM 83No photo on file yet | Pegasus Developers | Same sector | — | — | 31 Mar 2026 |
| Emaar India | Same sector | — | — | 31 Dec 2028 | |
No photo of the project on file yet | Raheja Developers | Same sector | — | — | 13 Sep 2024 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is KLJ Square registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as 234 OF 2017, registered on 19 Sep 2017. Ended 30 Jun 2024. The register shows it as: Registration expired.
The source ↗What is the possession timeline for KLJ Square?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2023. Its registration runs to 30 Jun 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around KLJ Square?From the records · Map pin and road lines, read 6 Sep 2026
KLJ Square is in Sector 83, Gurugram; the site address declared to HARERA is Klj Realtech Private Limited Village Shikohpur Sector 83 Gurugram Haryana 122004. In a straight line it is about 0.8 km from Delhi–Gurugram–SNB RRTS, 1.6 km from Dwarka Expressway and 6.8 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building KLJ Square?From the records · HARERA, read 4 Nov 2026
KLJ Square is a KLJ Realtech project, registered by its company KLJ REALTECH PRIVATE LIMITED.
The source ↗KLJ Realtech's projects and court recordThe records
What the registers hold for KLJ Square: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration 234 OF 2017: Registration expired. Ended 30 Jun 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 48 OF 2008 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 13 Mar 2020.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 16 Sep 2020, building plans 16 Sep 2020.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Registration expired
Ended 30 Jun 2024. HARERA Gurugram, read 4 Nov 2026. Source
Amber flag: Licence 48 OF 2008 validity ended
Named in this project’s application. Valid to 13 Mar 2020. The register links a completion certificate (LC-IX), dated 4 Jul 2024, against this licence. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 41 HARERA files, with the dates we read them
- Registration no.
- 234 OF 2017
- Registration date
- 19 Sept 2017
- Registration valid till
- 30 Jun 2024
- Declared possession
- 31 Dec 2023
Declared by the promoter to HARERA
- Land area
- 14390.68 (Sqr/mtrs)
- FAR
- 1.87 proposed of 1.87 permissible
- licence
- 48 OF 2008 DATED 14.03.2008
- Estimated project cost
- ₹281.81 crore
- Cost of land
- ₹63.73 crore
- Layout plan, declared approved (field 5a)
- 16 Sept 2020
- Building plans, declared approved
- 16 Sept 2020
- Completion declared for
- 31 Dec 2023
Declared inventory · 1 type
Declared inventory
- APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENT/SHOPS OTHER BUILDING TYPE COMMERCIAL COLONY · 235 units · 15,481.18 sq m carpet · total for 235 flats, about 65.9 m² each
Statutory approvals, as declared · 11
Statutory approvals, as declared
- I. LICENCE NO. 48 OF 2008 DATED 14.03.2008 — declared: already been obtained
- II. FOREST NOC NO. 311-G DATED 08.05.2014 — declared: already been obtained (8 May 2014)
- III. ARAVALI NOC MEMO NO. 1390/SK2 DATED 12.06.2014 — declared: already been obtained (12 Jun 2014)
- IV. MINING PERMISSION VIDE MEMO NO. 2088 DATED 18.11.2014 — declared: already been obtained (18 Nov 2014)
- V. ENVIRONMENT CLEARANCE VIDE MEMO NO. SEIAA/HR/2015/121 DATED 05.02.2015 — declared: already been obtained (5 Feb 2015)
- VI. CONSENT TO ESTABLISH VIDE MEMO NO. HSPCB/CONSENT/2821215GUS0CTO1886691 DATED 11.05.2015 AND RENEWAL DATED 24.06.2017 — declared: already been obtained (11 May 2015)
- VII. HEIGHT NOC FROM AAI BEARING MEMO NO. PALM/NORTH/B/200418/341525 DATED 04.10.2018 — declared: already been obtained (4 Oct 2018)
- VIII. NOC FOR CONSTRUCTION ACTIVITY BY HUDA VIDE MEMO NO. 307 DATED 28.04.2014 — declared: already been obtained (28 Apr 2014)
- IX. APPROVAL OF FIRE FIGHTING SCHEME VIDE MEMO NO. FS/2019/125 DATED 01.08.2019 — declared: already been obtained (1 Aug 2019)
- X. PRE CERTIFICATION REGISTRATION NO. NBT 190037 OF JULY 2019 ISSUED BY IGBC — declared: already been obtained (1 Jul 2019)
- XI. BUILDING PLANS — declared: already been obtained (16 Sept 2020)
On file with HARERA · 41 files
On file with HARERA (41)
Plans
Site plan
2 filesLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
6 filesFloor plans
8 filesServices
Sewerage and drainage
2 filesWater supply
1 fileElectricity
1 fileLandscape and green areas
1 fileService plans
1 fileApprovals and clearances
Occupation certificate (OC)
1 fileCompletion certificate (CC)
1 fileDTCP licence
1 fileEnvironment clearance
1 fileOther NOCs and clearances
2 filesLand records
Land records
1 fileMoney
Accounts and finance
5 filesThe promoter’s papers
Declarations and affidavits
1 fileHARERA’s orders
HARERA’s orders
1 fileOther filings
Other filings
2 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
48 OF 2008 · KLJ REALTECH PRIVATE LTD · GURGAON-MANESAR
Licence valid to 13 Mar 2020
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 1 Feb 2024 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
48 OF 2008: 7 parcels, 3.5562 acres in all, in Shikohpur (hadbast 160), tehsil Manesar.
The licence register prints the same licensed area, 3.556 acres.
- 740//2min7 biswa
- 740//3min7 biswa
- 741//1/2min17 biswansi
- 741//1/3min10 biswansi
Show the other 3 parcels
- 734//2/18 biswa
- 735//1min3 bigha 17 biswa 3 biswansi
- 736//1min13 biswa 6 biswansi
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Shikohpur (hadbast 160), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 740//2min.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, commercial property
- ₹1,64,000 per sq yd
Sector 83, collector rates effective 1 Apr 2026, Manesar tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
1 fileBuilding plans
6 filesFloor plans
8 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (41 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/2785 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on KLJ Realtech
Its court cases, its DTCP licences and the source of each fact, free once you sign in.