AASHIYARA

by Renuka Traders · Sector 37C, Gurugram

Not on our price list yet

Possession 31 Jan 2023 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 37C, Gurugram2.5 km from Dwarka Expressway, in a straight line
Carpet area
549–644 sq ft
In m²about 51–60 m², as declared
Registered
28 Nov 2018
Registered by
RENUKA TRADERS PVT LTDthe company that filed it, for Renuka Traders
Timeline
  1. 8 Oct 2018Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 28 Nov 2018Registered with HARERAHARERA, read 3 Nov 2026
  3. 31 Jan 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 29 Jul 2025Registration valid toHARERA, read 3 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

716homes, 549 to 644 sq ft of carpet area
  • Under 1,000 sq ft549–644 sq ft716

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 66 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside20,100.704 acres in all, by use
  • Parking7,780.841 acres · 39%
  • Apartment buildings5,893.849 acres · 29%
  • Green belts4,020.224 acres · 20%
  • Roads1,960.012 acres · 10%
  • Club house222.889 acres · 1%
  • Other uses222.889 acres · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenOil bound distemper
  • LiftsAs per ISI standards
  • FloorsTiles
  • WallsOil bound distemper
  • BathroomsISI marked CP fittings, W.C & /wasgbasin
  • WindowsA1 powder coated/MS sections with 4-5 MM annealed ISI marked glass
  • Main doorBoth side laminated flush door
  • Electrical fittingsISI marked switches & sockets

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 37C, GurugramSector 37C, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20252.5 km
  • Delhi–Gurugram–SNB RRTS2.6 km
  • Sohna Elevated Corridor (NH-248A)4.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is AASHIYARA registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/294/2018/26, registered on 28 Nov 2018. The register’s record shows an end date of 29 Jul 2025. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for AASHIYARA?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Jan 2023. Its registration runs to 29 Jul 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around AASHIYARA?From the records · Map pin and road lines, read 6 Sep 2026

AASHIYARA is in Sector 37C, Gurugram; the site address declared to HARERA is Sector-37c, Gurugram. In a straight line it is about 2.5 km from Dwarka Expressway, 2.6 km from Delhi–Gurugram–SNB RRTS and 4.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building AASHIYARA?From the records · HARERA, read 3 Nov 2026

AASHIYARA is a Renuka Traders project, registered by its company RENUKA TRADERS PVT LTD.

The source ↗Renuka Traders's projects and court record

The records

What the registers hold for AASHIYARA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/294/2018/26: Registration lapsed. The register’s record shows an end date of 29 Jul 2025.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 15 OF 2018 is on the DTCP register: Licence lapsed; the register prints its validity to 12 Feb 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 8 Oct 2018, building plans 8 Oct 2018.Declared to HARERA, read 29 Oct 2026
The court record of Renuka Traders’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 15 OF 2018 lapsed

    Named in this project’s application. Valid to 12 Feb 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 29 Jul 2025. HARERA Gurugram, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 29 HARERA files, with the dates we read them
Registration no.
GGM/294/2018/26
Registration date
28 Nov 2018
Registration valid till
29 Jul 2025
Declared possession
31 Jan 2023

Declared by the promoter to HARERA

Land area
20100.704 (Acre) (as printed; not a plausible area)
FAR
the application prints 228, which is not a ratio
licence
15 of 2018
Estimated project cost
₹142.93 crore
Cost of land
₹34.14 crore
Layout plan, declared approved (field 5a)
8 Oct 2018
Building plans, declared approved
8 Oct 2018
Construction to start
31 Jan 2019
Completion declared for
31 Jan 2023
Declared inventory · 10 types

Declared inventory — 10 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 48 units · 59.8 sq m carpet · 4 towers · one flat
  • Apartment/Shops/Other Buildings · 334 units · 53.749 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 334 units · 50.996 sq m carpet · 5 towers · one flat
  • Apartment/Shops/Other Buildings · 9 units · 18.063 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 16 units · 18.561 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 4 units · 16.624 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 16.19 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 16 units · 18.497 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 9

Statutory approvals, as declared

  • I. DENARCATION PLAN ZP-1238-AD(RA)/2018/28705 — declared: already been obtained (10 Oct 2018)
  • II. ZONING PLAN 6313/2018 — declared: already been obtained (15 Feb 2018)
  • III. ENVIRONMENTAL CLEARANCE SEIAA/HR/2018/1105 — declared: already been obtained (20 Aug 2018)
  • IV. FOREST NOC NCW-M4Y-B7RG — declared: already been obtained (3 Jul 2018)
  • V. NATURAL CONSERVATION NOC 34 — declared: already been obtained (4 Aug 2018)
  • VI. AIRPORT AUTHORITY NOC AAI/RHQ/NR/ATM/NOC/2018,264/1404-1407 — declared: already been obtained (4 Sept 2018)
  • VII. HUDA CONSTRUCTION WATER NOC A1/ADMIN 2018/NOC/9166 — declared: already been obtained (2 Jul 2018)
  • VIII. WATER SUPPLY ASSURANCE HSVP 139144 — declared: already been obtained (10 Jul 2018)
  • IX. SEWERAGE CONNECTION ASSURANCE HSVP 139139 — declared: already been obtained (10 Jul 2018)
On file with HARERA · 29 files

On file with HARERA (29)

Plans

Site plan

1 file
Approved Site Plan23 Oct 2018

Layout plan

1 file
Latest Layout Plan23 Oct 2018

Zoning plan

1 file
Zoning Plan23 Oct 2018

Demarcation plan

1 file
Demarcation Plan23 Oct 2018

Building plans

4 files
Approved Building Plans, Full Set23 Oct 2018Details of Architect23 Oct 2018Details of Structure Engineer23 Oct 2018Address Proof of Company23 Oct 2018

Services

Service plans

1 file
Service Plans on the Layout23 Oct 2018

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule23 Oct 2018

Other NOCs and clearances

4 files
Forest Clearance23 Oct 2018NOC for Non Conservation Zone23 Oct 2018HSVP NOC23 Oct 2018Airport Authority NOC23 Oct 2018

Land records

Land records

2 files
Revenue Record Entry of Licence and Collaboration23 Oct 2018Sale Deed23 Oct 2018

Money

Accounts and finance

6 files
Cash Flow Statement23 Oct 2018CA Certificate on the Application’s Figures23 Oct 2018Non-Default Certificate from a CA23 Oct 2018

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit23 Oct 2018

Company papers

4 files
Authorized Signatory23 Oct 2018Company GST Certificate23 Oct 2018MOA and AOA23 Oct 2018Director Details23 Oct 2018

Other filings

Other filings

2 files
PROJECT CONTINUATION- RC/REP/HARERA/GGM/26 of 2018/7(3)/63/2025/05 DATED 07.03.20254 Apr 2025Details of Registered Agents23 Oct 2018

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

15 OF 2018 · RENUKA TRADERS PVT. LTD. · GURGAON-MANESAR

Licence valid to 12 Feb 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 23 Oct 2018 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

15 OF 2018: 12 parcels, 4.9958 acres in all, in Garauli khurd (hadbast 106), tehsil Kadipur.

The licence register prints the same licensed area, 5 acres.

  • 7//20/21 kanal 12 marla
  • 7//217 kanal 12 marla
  • 7//228 kanal
  • 7//23/16 kanal 8 marla
Show the other 8 parcels
  • 14//1/1/21 kanal 11 marla
  • 14//2/14 kanal
  • 8//16/24 kanal
  • 8//17/1/21 kanal 14 marla
  • 8//24/12 kanal 17 marla
  • 13//2/2/26 marla 3 sarsai
  • 13//3/11 kanal 13 marla
  • 13//4/1/16 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Garauli khurd (hadbast 106), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 7//20/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,500 per sq ft

this sector, collector rates effective 1 Apr 2026, Kadipur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan23 Oct 2018

Layout plan

1 file
Latest Layout Plan23 Oct 2018

Building plans

4 files
Approved Building Plans, Full Set23 Oct 2018Details of Architect23 Oct 2018Details of Structure Engineer23 Oct 2018Address Proof of Company23 Oct 2018

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (29 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/252 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Renuka Traders

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.