EMPERIUM PREMIO
by Emperium Infrastructure · Sector 37C, Gurugram
Not on our price list yet
Possession 30 Jun 2029 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 37C, Gurugram2.5 km from Dwarka Expressway, in a straight line
- Registered by
- EMPERIUM INFRASTRUCTURE PRIVATE LIMITEDthe company that filed it, for Emperium Infrastructure
- 20 Sep 2015Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 30 Jun 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026
- 31 Mar 2030Registration valid toHARERA, read 4 Nov 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft761 sq ft68
- 1,000–1,500 sq ft1,006–1,468 sq ft140
- 2,000–2,500 sq ft2,070 sq ft8
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Roads1.409 acres · 37%
- Parks and playgrounds0.958 acres · 25%
- Other uses0.477 acres · 13%
- Parking0.476 acres · 13%
- Apartment buildings0.364 acres · 10%
- Electricity sub-station0.104 acres · 3%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenTile/paint
- WardrobesProvision
- FloorsVitrified tile/ leminated W/F
- WallsPaint
- BathroomsCP
- WindowsWooden/UPVC
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20252.5 km
- Delhi–Gurugram–SNB RRTS2.6 km
- Sohna Elevated Corridor (NH-248A)4.5 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Registered, no OC or CC yet: 2
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Imperia Structures | Same sector | — | — | — |
ILD Millennium (Town)No photo on file yet | ILD Millennium | Same sector | — | — | 31 Mar 2023 |
OUR HOMESNo photo on file yet | Apex Buildwell | Same sector | — | — | 30 Sep 2020 |
AASHIYARA-IINo photo on file yet | Renuka Traders | Same sector | — | — | 8 Dec 2025 |
AASHIYARANo photo on file yet | Renuka Traders | Same sector | — | — | 31 Jan 2023 |
RMG ResidencyNo photo on file yet | RMG Developers | Same sector | — | — | — |
No photo of the project on file yet | Signatureglobal Developers | 1.8 kmto its sector’s point | — | — | 28 Feb 2026 |
| BPTP | 1.8 kmto its sector’s point | — | — | 31 Jul 2020 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is EMPERIUM PREMIO registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/850/582/2024/77. Valid to 31 Mar 2030.
The source ↗What is the possession timeline for EMPERIUM PREMIO?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 30 Jun 2029. Its registration runs to 31 Mar 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around EMPERIUM PREMIO?From the records · Map pin and road lines, read 6 Sep 2026
EMPERIUM PREMIO is in Sector 37C, Gurugram; the site address declared to HARERA is Sector 37 C. In a straight line it is about 2.5 km from Dwarka Expressway, 2.6 km from Delhi–Gurugram–SNB RRTS and 4.5 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building EMPERIUM PREMIO?From the records · HARERA, read 4 Nov 2026
EMPERIUM PREMIO is a Emperium Infrastructure project, registered by its company EMPERIUM INFRASTRUCTURE PRIVATE LIMITED.
The source ↗Emperium Infrastructure's projects and court recordThe records
What the registers hold for EMPERIUM PREMIO: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/850/582/2024/77: Registered. Valid to 31 Mar 2030.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 96 OF 2010 is on the DTCP register: Licence lapsed; the register prints its validity to 2 Nov 2025.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 20 Sep 2015, building plans 20 Sep 2015.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Licence 96 OF 2010 lapsed
Named in this project’s application. Valid to 2 Nov 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 40 HARERA files, with the dates we read them
- Registration no.
- GGM/850/582/2024/77
- Registration valid till
- 31 Mar 2030
- Declared possession
- 30 Jun 2029
Declared by the promoter to HARERA
- Land area
- 3.788 (Acre) (15,329.49 sq m)
- FAR
- 1.75 proposed of 1.75 permissible
- licence
- 13 OF 2008, 96 OF 2010,118 OF 2011
- Estimated project cost
- ₹199.49 crore
- Cost of land
- ₹25.00 crore
- Layout plan, declared approved (field 5a)
- 20 Sept 2015
- Building plans, declared approved
- 20 Sept 2015
- Construction to start
- 1 Jul 2024
- Completion declared for
- 30 Jun 2029
Declared inventory · 4 types
Declared inventory
- Apartment/Shops/Other Buildings · 68 units · 70.73 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 136 units · 93.46 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 4 units · 136.39 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 8 units · 192.33 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 1
Statutory approvals, as declared
- I. LICENSE NO. 13 OF 2008 — declared: already been obtained (31 Jan 2008)
On file with HARERA · 40 files
On file with HARERA (40)
Plans
Site plan
3 filesLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileServices
Sewerage and drainage
1 fileService plans
3 filesApprovals and clearances
DTCP licence
1 fileOther NOCs and clearances
4 filesLand records
Land records
10 filesMoney
Accounts and finance
5 filesThe promoter’s papers
Declarations and affidavits
6 filesOther filings
Other filings
3 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The 3 DTCP licences named on the application
13 OF 2008 · ALM Infotech City Pvt. Ltd · GURGAON-MANESAR
Licence valid to 30 Jan 2030
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
96 OF 2010 · Jubliant mall · GURGAON-MANESAR
Licence valid to 2 Nov 2025
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
118 OF 2011 · Jubiliant Malls · GURGAON-MANESAR
Licence valid to 25 Dec 2029
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 17 May 2024 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the 3 licences
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
13 OF 2008: 9 parcels, 15.4828 acres in all, in Basai (hadbast 50), tehsil Kadipur.
The licence register prints the same licensed area, 15.4829 acres.
- rectangle 742, kila 742/21 bigha 3 biswa 17 biswansi
- rectangle 743, kila 7437 bigha 8 biswa
- rectangle 745, kila 745/21 bigha 13 biswa 13 biswansi
- rectangle 469, kila 469/2 min3 bigha 6 biswa 15 biswansi
Show the other 5 parcels
- rectangle 468, kila 468/22 bigha 8 biswa
- rectangle 746, kila 746 min2 bigha 7 biswa
- rectangle 746, kila 746 min2 bigha 8 biswa
- rectangle 742, kila 742/1/22 bigha 6 biswa 8 biswansi
- rectangle 745, kila 745/11 bigha 13 biswa 16 biswansi
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
96 OF 2010: 2 parcels, 1.3656 acres in all, in Basai (hadbast 50), tehsil Kadipur.
The licence register prints the same licensed area, 1.36 acres.
- rectangle 751, kila 7511 bigha 9 biswa
- rectangle 752, kila 752/414 biswa 14 biswansi
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
118 OF 2011
Bhumiq could not read DTCP’s land schedule for licence 118 OF 2011 on 4 Nov 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Basai (hadbast 50), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as rectangle 742, kila 742/2.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
3 filesLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (40 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/2953 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Emperium Infrastructure
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

