ANANTA VILASA 2.0
by Mnb Build Fab · Sector 28, Gurugram
Not on our price list yet
Possession 31 May 2032 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 28, Gurugram2.5 km from Delhi–Gurugram–SNB RRTS, in a straight line
- Registered by
- MNB BUILD FAB PRIVATE LIMITEDthe company that filed it, for Mnb Build Fab
- 1 Apr 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
- 31 Jul 2031Registration valid toHARERA, read 4 Nov 2026
- 31 May 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 1,500–2,000 sq ft1,659–1,692 sq ft60
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Air-conditioningVRV, as per BIS specifications
- KitchenModular kitchen
- Kitchen appliancesAs per BIS specifications
- LiftsTwo passenger lifts & one service lift of make KONE/ equivalent
- WardrobesYes
- FloorsGood quality italian stone
- WallsGood quality plastic paint
- BathroomsCPVC fittings
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Delhi–Gurugram–SNB RRTS2.5 km
- Sohna Elevated Corridor (NH-248A)5.8 km
- Dwarka ExpresswayOpen, 17 Aug 20257.2 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Registered, no OC or CC yet: 2
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Silverglades | Same sector | — | — | 11 Oct 2025 |
LODHA GOLF COURSE ROADNo photo on file yet | Lodha Developers | Same sector | — | — | 30 Nov 2032 |
| DLF | 1.1 kmto its sector’s point | — | — | 15 May 2025 | |
M3M JEWELNo photo on file yet | Lekh Buildtech | 1.4 kmto its sector’s point | — | — | 31 Mar 2026 |
THE EMPIRE CENTRENo photo on file yet | Essel Infra | 2.1 kmto its sector’s point | — | — | 31 Jan 2030 |
THE EMPIRENo photo on file yet | Essel Infra | 2.1 kmto its sector’s point | — | — | 21 Aug 2028 |
Plot No GH-24No photo on file yet | The Bajrang Co-operative Group Housing Society | 2.1 kmto its sector’s point | — | — | — |
| Godrej Highview | 2.1 kmto its sector’s point | Under construction | ₹26,000/sq ft | 30 Sep 2031 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is ANANTA VILASA 2.0 registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/947/679/2025/50. Valid to 31 Jul 2031.
The source ↗What is the possession timeline for ANANTA VILASA 2.0?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 May 2032. Its registration runs to 31 Jul 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around ANANTA VILASA 2.0?From the records · Map pin and road lines, read 6 Sep 2026
ANANTA VILASA 2.0 is in Sector 28, Gurugram; the site address declared to HARERA is Gh4 , Sector 28. In a straight line it is about 2.5 km from Delhi–Gurugram–SNB RRTS, 5.8 km from Sohna Elevated Corridor (NH-248A) and 7.2 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building ANANTA VILASA 2.0?From the records · HARERA, read 4 Nov 2026
ANANTA VILASA 2.0 is a Mnb Build Fab project, registered by its company MNB BUILD FAB PRIVATE LIMITED.
The source ↗Mnb Build Fab's projects and court recordThe records
What the registers hold for ANANTA VILASA 2.0: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/947/679/2025/50: Registered. Valid to 31 Jul 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Plans approved, as the developer declared: building plans 1 Apr 2025.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 40 HARERA files, with the dates we read them
- Registration no.
- GGM/947/679/2025/50
- Registration valid till
- 31 Jul 2031
- Declared possession
- 31 May 2032
Declared by the promoter to HARERA
- Land area
- 2296.90 (Sqr/mtrs)
- FAR
- the application prints 400, which is not a ratio
- licence
- N/A
- Estimated project cost
- ₹231.98 crore
- Cost of land
- ₹59.32 crore
- Building plans, declared approved
- 1 Apr 2025
- Construction to start
- 1 Aug 2025
- Completion declared for
- 31 May 2032
Declared inventory · 3 types
Declared inventory
- Apartment/Shops/Other Buildings · 20 units · 155.86 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 20 units · 157.15 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 20 units · 154.09 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 8
Statutory approvals, as declared
- I. ASSURANCE FOR SEWERAGE CONNECTION FOR DISCHARGE OF 50 KLD SURPLUS DOMESTIC TREATED EFFLUENT — declared: already been obtained (9 Aug 2024)
- II. ASSURANCE FOR STORM WATER CONNECTION OF PROPOSED GROUP HOUSING PROJECT — declared: already been obtained (8 Aug 2024)
- III. NO OBJECTION CERTIFICATE FOR FIRE — declared: already been obtained (24 Feb 2024)
- IV. ASSURANCE FOR SUPPLY OF 30 KLD STP TREATED WATER FOR CONSTRUCTION OF GROUP HOUSING PROJECT — declared: already been obtained (9 Aug 2024)
- V. TREE CUTTING PERMISSION — declared: already been obtained (27 Feb 2024)
- VI. ASSURANCE FOR WATER SUPPLY 5 KLD FOR DOMESTIC PURPOSE — declared: already been obtained (8 Aug 2024)
- VII. SITE ALLOTMENT — declared: already been obtained (3 Jan 2024)
- VIII. HSVP PERMISSION TO CREATE 3RD PARTY RIGHT — declared: already been obtained (11 Mar 2025)
On file with HARERA · 40 files
On file with HARERA (40)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
8 filesFloor plans
8 filesServices
Sewerage and drainage
2 filesService plans
1 fileApprovals and clearances
DTCP licence
1 fileOther NOCs and clearances
3 filesLand records
Land records
1 fileSales papers
Payment plan
1 fileAllotment and sale agreements
3 filesMoney
Accounts and finance
4 filesThe promoter’s papers
Declarations and affidavits
3 filesOther filings
Other filings
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared N/A. We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Gurugram bench · submitted 2 Apr 2025 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
8 filesFloor plans
8 filesPayment plan
1 filesource: https://haryanarera.gov.in/view_project/project_preview_open/3376 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Mnb Build Fab
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.