HIGHTOWN

by Silverglades · Sector 28, Gurugram

Not on our price list yet

Possession 11 Oct 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 28, Gurugram2.5 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
1,195–2,497 sq ft
In m²about 111–232 m², as declared
Land
19627.174 (Sqr/mtrs)
Registered by
SILVERGLADES INFRASTRUCTURE PRIVATE LIMITEDthe company that filed it, for Silverglades
Timeline
  1. 12 Oct 2020Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 11 Oct 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 10 Oct 2026Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

260homes, 1,195 to 2,497 sq ft of carpet area
  • 1,000–1,500 sq ft1,195–1,442 sq ft150
  • 1,500–2,000 sq ft1,539–1,991 sq ft106
  • 2,000–2,500 sq ft2,497 sq ft4

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 46 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside19,627 m² in all, by use
  • Roads7,930 m² · 40%
  • Apartment buildings7,101 m² · 36%
  • Parks and playgrounds2,948 m² · 15%
  • Club house1,293 m² · 7%
  • Parking276 m² · 1%
  • Other uses80 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV / split AC system
  • KitchenAntislip vitrified tiles;acrylic emulsion paint, granite stone counter, single lever CP fittings &double; bowl SS sink with drain board,hob and chimney, modular kitchen cabinetry
  • Kitchen appliancesModular kitchen cabinetry, hob & chimney
  • Lifts12-18 persons approx. each lift capacity
  • WardrobesProvision
  • FloorsCombination of laminated wooden flooring , natural stone & tiles
  • WallsCombination of acrylic emulsion paint , POP punning
  • BathroomsVanities with mirror, single lever CP fittings with WASH basin & european WC

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 28, GurugramSector 28, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS2.5 km
  • Sohna Elevated Corridor (NH-248A)5.8 km
  • Dwarka ExpresswayOpen, 17 Aug 20257.2 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is HIGHTOWN registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/406/138/2020/22. Ended 10 Oct 2026. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for HIGHTOWN?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 11 Oct 2025. Its registration runs to 10 Oct 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around HIGHTOWN?From the records · Map pin and road lines, read 6 Sep 2026

HIGHTOWN is in Sector 28, Gurugram; the site address declared to HARERA is Revenue Estate Of Village Sukhrali, Sector 28. In a straight line it is about 2.5 km from Delhi–Gurugram–SNB RRTS, 5.8 km from Sohna Elevated Corridor (NH-248A) and 7.2 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building HIGHTOWN?From the records · HARERA, read 4 Nov 2026

HIGHTOWN is a Silverglades project, registered by its company SILVERGLADES INFRASTRUCTURE PRIVATE LIMITED.

The source ↗Silverglades's projects and court record

The records

What the registers hold for HIGHTOWN: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/406/138/2020/22: Registration expired. Ended 10 Oct 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 110 OF 2013 is on the DTCP register: Licence lapsed; the register prints its validity to 26 Dec 2024.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 12 Oct 2020, building plans 12 Oct 2020.Declared to HARERA, read 29 Oct 2026
The court record of Silverglades’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 10 Oct 2026. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 110 OF 2013 lapsed

    Named in this project’s application. Valid to 26 Dec 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 103 HARERA files, with the dates we read them
Registration no.
GGM/406/138/2020/22
Registration valid till
10 Oct 2026
Declared possession
11 Oct 2025

Declared by the promoter to HARERA

Land area
19627.174 (Sqr/mtrs)
FAR
the application prints 362, which is not a ratio
licence
110 of 2013
Estimated project cost
₹523.61 crore
Cost of land
₹65.98 crore
Layout plan, declared approved (field 5a)
12 Oct 2020
Building plans, declared approved
12 Oct 2020
Construction to start
15 Oct 2020
Completion declared for
11 Oct 2025
Declared inventory · 7 types

Declared inventory

  • Apartment/Shops/Other Buildings · 98 units · 111 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 6 units · 115 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 46 units · 134 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 143 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 104 units · 185 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 232 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 46 units · 18 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 12

Statutory approvals, as declared

  • I. TOD APPROVAL — declared: already been obtained (19 Aug 2019)
  • II. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (14 Sept 2020)
  • III. FOREST NOC — declared: already been obtained (11 Aug 2015)
  • IV. WATER SUPPLY — declared: already been obtained (7 Mar 2018)
  • V. ELECTRICAL LOAD AVAILABILITY — declared: already been obtained (17 Jan 2020)
  • VI. LICENSE APPROVAL — declared: already been obtained (27 Dec 2013)
  • VII. ZONING PLAN — declared: already been obtained (19 Aug 2019)
  • VIII. BUILDING PLAN/ SITE PLAN APPROVAL — declared: already been obtained (12 Oct 2020)
  • IX. ENVIRONMENT CLEARANCE — declared: already been obtained (1 Feb 2021)
  • X. SEWAGE DISPOSAL — declared: applied for but yet to receive (19 Jan 2021)
  • XI. FIRE SCHEME APPROVAL — declared: applied for but yet to receive
  • XII. SERVICE PLAN ESTIMATES APPROVAL — declared: applied for but yet to receive
On file with HARERA · 103 files

On file with HARERA (103)

Plans

Site plan

3 files
Site Plan (Phe)23 Feb 2021Site Plan23 Feb 2021Approved Site Plan11 Jan 2020

Layout plan

1 file
Latest Layout Plan11 Jan 2020

Zoning plan

1 file
Zoning Plan11 Jan 2020

Demarcation plan

1 file
Demarcation Plan11 Jan 2020

Building plans

16 files
Tower C (Commercial Block) Section23 Feb 2021Tower C (Commercial Block) Terrace Plan and Carpet Area Calculation23 Feb 2021Tower C- Terrace, Mumty & Ohwt Level Plan23 Feb 2021

Floor plans

37 files
Tower C 4th-23RD, Typical Floor Plan (Except 16th Floor) and Area Diagram23 Feb 2021Tower C (Commercial Block) 7th & 8th Typical Floor Plan and Area Calculation23 Feb 2021Tower C (Commercial Block) 2NDFLOOR Plan and Area Calculation23 Feb 2021

Services

Sewerage and drainage

2 files
Approval Sewerage20 Feb 2021Storm Water Application20 Feb 2021

Water supply

1 file
Water for Construction-284 Nov 2020

Electricity

2 files
Power Load Approval -284 Nov 2020Electrical Plan Estimate4 Nov 2020

Landscape and green areas

1 file
Green Area Calculation22 Feb 2021

Service plans

2 files
Service Plan Estimate20 Feb 2021Service Plans on the Layout11 Jan 2020

Approvals and clearances

DTCP licence

9 files
Revised EC Under TOD20 Feb 2021License-28 Renewed4 Nov 2020License Renewal 14.7.204 Nov 2020

Environment clearance

1 file
Environment NOC- Hightown4 Nov 2020

Fire safety

1 file
Application for Fire Approval20 Feb 2021

Other NOCs and clearances

3 files
Airport Authority NOC- Hightown20 Feb 2021NOC Forest Department- Hightown4 Nov 2020Electrical Load NOC4 Nov 2020

Land records

Land records

3 files
Non -Encumbrance Certificate4 Nov 2020Collaboration Agreement4 Nov 2020Revenue Record Entry of Licence and Collaboration11 Jan 2020

Sales papers

Allotment and sale agreements

5 files
Inventory Details- Residential Hightown Tower B20 Feb 2021Inventory Details- Residential Hightown Tower C20 Feb 2021Inventory Details- Residential Hightown Tower A20 Feb 2021

Money

Accounts and finance

5 files
Change Bank Accounts20 Jun 2023Cash Flow Statement20 Feb 2021Non-Default Certificate from a CA4 Nov 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit20 Feb 2021

Company papers

4 files
TAN Sipl4 Nov 2020MOA4 Nov 2020AOA4 Nov 2020GST Certificate Sipl4 Nov 2020

HARERA’s orders

HARERA’s orders

1 file
Extension No. 38 of 2025 dated 16.10.202529 Oct 2025

Other filings

Other filings

3 files
Revised/Corrected RC23 Aug 2022Ground Coverage Calculation22 Feb 2021Griha Approval-Hightown4 Nov 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

110 OF 2013 · Everlike Buildcon Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 26 Dec 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 16 Jan 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

110 OF 2013: 6 parcels, 4.85 acres in all, in Sukhrali (hadbast 71), tehsil Gurgaon.

The licence register prints the same licensed area, 4.85 acres.

  • 35//167 kanal 12 marla
  • 35//17/14 kanal 8 marla
  • 35//24/24 kanal 8 marla
  • 35//257 kanal 12 marla
Show the other 2 parcels
  • 39//57 kanal 12 marla
  • 39//67 kanal 4 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Sukhrali (hadbast 71), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 35//16.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Site Plan (Phe)23 Feb 2021Site Plan23 Feb 2021Approved Site Plan11 Jan 2020

Layout plan

1 file
Latest Layout Plan11 Jan 2020

Building plans

16 files
Tower C (Commercial Block) Section23 Feb 2021Tower C (Commercial Block) Terrace Plan and Carpet Area Calculation23 Feb 2021Tower C- Terrace, Mumty & Ohwt Level Plan23 Feb 2021Commercial Block Elevations22 Feb 2021EWS 5th to Terrace Floor Plan and Area Calculation22 Feb 2021EWS Front Elevation and Cross Section22 Feb 2021

Floor plans

37 files
Tower C 4th-23RD, Typical Floor Plan (Except 16th Floor) and Area Diagram23 Feb 2021Tower C (Commercial Block) 7th & 8th Typical Floor Plan and Area Calculation23 Feb 2021Tower C (Commercial Block) 2NDFLOOR Plan and Area Calculation23 Feb 2021Tower C (Commercial Block) 3rd Floor Plan and Area Calculation23 Feb 2021Tower C (Commercial Block) 4th Floor Plan and Area Calculation23 Feb 2021Tower C (Commercial Block) 6th Floor Plan and Area Calculation23 Feb 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (103 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/931 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Silverglades

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.