Key facts

Location
Sector 43, Gurugram3.2 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
270–2,929 sq ft
In m²about 25–272 m², as declared
Registered by
ESSEL INFRA LLPthe company that filed it, for Essel Infra
Timeline
  1. 27 Sep 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Jan 2030Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

101homes, 270 to 2,929 sq ft of carpet area
  • Under 1,000 sq ft270–408 sq ft75
  • 2,500–3,000 sq ft2,733–2,929 sq ft26

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 16 rows of a single unit and 51 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside3,120 m² in all, by use
  • Apartment buildings1,871 m² · 60%
  • Pavements1,249 m² · 40%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV/ water cooler chiller
  • KitchenVitrified tiles
  • Lifts6 lift , 9/15 passenger / ottis, fujitech,T.K. elevators ETC
  • FloorsVitrified tiles
  • WallsGlazed ceramic tiles/ paint /OBD
  • BathroomsHindware, CERA, parry WARE
  • WindowsAluminum frame with glass
  • Main doorPRE-laminated flush door/hdhmr door

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 43, GurugramSector 43, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS3.2 km
  • Sohna Elevated Corridor (NH-248A)5.2 km
  • Dwarka ExpresswayOpen, 17 Aug 20259.2 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is THE EMPIRE CENTRE registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/919/651/2025/22. Valid to 31 Jan 2030.

The source ↗
What is the possession timeline for THE EMPIRE CENTRE?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Jan 2030. Its registration runs to 31 Jan 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around THE EMPIRE CENTRE?From the records · Map pin and road lines, read 6 Sep 2026

THE EMPIRE CENTRE is in Sector 43, Gurugram; the site address declared to HARERA is Commercial Complex , Plot No. C2, Sector 43, Gurugram. In a straight line it is about 3.2 km from Delhi–Gurugram–SNB RRTS, 5.2 km from Sohna Elevated Corridor (NH-248A) and 9.2 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building THE EMPIRE CENTRE?From the records · HARERA, read 4 Nov 2026

THE EMPIRE CENTRE is a Essel Infra project, registered by its company ESSEL INFRA LLP.

The source ↗Essel Infra's projects and court record

The records

What the registers hold for THE EMPIRE CENTRE: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/919/651/2025/22: Registered. Valid to 31 Jan 2030.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: building plans 27 Sep 2024.Declared to HARERA, read 29 Oct 2026
The court record of Essel Infra’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 43 HARERA files, with the dates we read them
Registration no.
GGM/919/651/2025/22
Registration valid till
31 Jan 2030
Declared possession
31 Jan 2030

Declared by the promoter to HARERA

Land area
0.7710 (Acre) (3,120.13 sq m)
FAR
5.12 proposed of 5.12 permissible
licence
HSVP AllottedCommercial PlotNo. C2, Sector 43,GurugramAllotment Letterno. ZO002/EO018/UE029/GALOT/0000000649dated14.07.2022
Estimated project cost
₹359.89 crore
Cost of land
₹133.77 crore
Building plans, declared approved
27 Sept 2024
Construction to start
1 Feb 2025
Completion declared for
31 Jan 2030
Declared inventory · 82 types

Declared inventory — 82 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 1 unit · 3.96 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 3 units · 5.16 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 5.22 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 9.72 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 6 units · 14.12 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 14.26 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 14.3 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 14.39 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. ALLOTMENT LETTER FROM HSVP — declared: already been obtained (14 Jul 2022)
  • II. POSSESSION LETTER FROM HSVP — declared: already been obtained (19 Jul 2022)
  • III. HEIGHT NOC — declared: already been obtained (20 Oct 2022)
  • IV. FOREST NOC — declared: already been obtained (20 Oct 2022)
  • V. BUILDING PLAN — declared: already been obtained (27 Sept 2024)
  • VI. MINING PERMISSION — declared: already been obtained (2 Feb 2025)
  • VII. ELECTRICAL POWER LOAD ASSURANCE — declared: already been obtained (7 Aug 2023)
  • VIII. ENVIRONMENT CLERANCE — declared: already been obtained (31 Jan 2025)
  • IX. CONSENT TO ESTABLISH — declared: already been obtained (10 Feb 2025)
  • X. CONVEYANCE DEED — declared: already been obtained (18 Nov 2024)
On file with HARERA · 43 files

On file with HARERA (43)

Plans

Site plan

2 files
Site Plan21 Feb 2025Approved Site Plan21 Dec 2024

Layout plan

1 file
Latest Layout Plan21 Dec 2024

Zoning plan

2 files
Zoning Cum Demarcation Plan21 Feb 2025Zoning Plan21 Dec 2024

Demarcation plan

1 file
Demarcation Plan21 Dec 2024

Building plans

5 files
BR-III21 Feb 2025Elevation Plans24 Dec 2024Structure Drawings24 Dec 2024

Floor plans

2 files
Parking Plan21 Feb 2025Floors Plan24 Dec 2024

Services

Sewerage and drainage

1 file
Assurance Water Supply Sewerage & Storm21 Feb 2025

Electricity

1 file
Electrical Assurance & Temporary Connection21 Feb 2025

Approvals and clearances

DTCP licence

2 files
LOI HSVP C221 Feb 2025Licence Copy with Land Schedule21 Dec 2024

Environment clearance

1 file
EC Empire Centre C221 Feb 2025

Fire safety

1 file
Fire Scheme21 Feb 2025

Other NOCs and clearances

7 files
Consent to Establish21 Feb 2025Forest NOC21 Feb 2025Natural Conservation Zone NOC21 Feb 2025

Land records

Land records

3 files
Non-Encumbrance Certificate21 Feb 2025Title Search Report21 Feb 2025Land Title Search Report24 Dec 2024

Sales papers

Allotment and sale agreements

3 files
Allotment Leteter HSVP21 Feb 2025Possession Certificate21 Feb 2025Conveyance Deed24 Dec 2024

Money

Accounts and finance

7 files
Cash Flow Statement6 Mar 2025Board Resolution Bank Operation21 Feb 2025CA Certificate on the Application’s Figures21 Feb 2025

The promoter’s papers

Declarations and affidavits

4 files
Affidavit 4(2)(L)(D)21 Feb 2025The Promoter’s Declaration on Affidavit21 Feb 2025Bank Undertaking21 Feb 2025Affidavit Tree Cutting and Forest Land Diversion21 Feb 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared HSVP AllottedCommercial PlotNo. C2, Sector 43,GurugramAllotment Letterno. ZO002/EO018/UE029/GALOT/0000000649dated14.07.2022. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 24 Dec 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan21 Feb 2025Approved Site Plan21 Dec 2024

Layout plan

1 file
Latest Layout Plan21 Dec 2024

Building plans

5 files
BR-III21 Feb 2025Elevation Plans24 Dec 2024Structure Drawings24 Dec 2024Section Plans24 Dec 2024Copy of Approved Building Plan Letter21 Dec 2024

Floor plans

2 files
Parking Plan21 Feb 2025Floors Plan24 Dec 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (43 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3195 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Essel Infra

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.