Godrej Miraya

by Godrej Highview · Sector 43, Gurugram

From ₹15.13 Cr

₹26,000 a sq ftof carpet area

As listed on godrejproperties.com (“INR 15.13 Cr. onwards”), read 23 Oct 2026. Bhumiq team price list, 16 Sep 2026: an asking rate, not a registry figure.

Possession 30 Sep 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 43, Gurugram3.2 km from Delhi–Gurugram–SNB RRTS, in a straight linePrices and what changed
Carpet area
1,358–2,611 sq ft
In m²about 126–243 m², as declared
Price, as listed
From ₹15.13 Cr
Asking rate
₹26,000 a sq ft of carpet
Bhumiq team price list, 16 Sep 2026
Registered by
GODREJ PROJECTS DEVELOPMENT LIMITEDthe company that filed it, for Godrej Highview
Timeline
  1. 30 Aug 2024Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Sep 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

248homes, 1,358 to 2,611 sq ft of carpet area
  • 1,000–1,500 sq ft1,358 sq ft2
  • 1,500–2,000 sq ft1,519–1,577 sq ft60
  • 2,000–2,500 sq ft2,166–2,288 sq ft122
  • 2,500–3,000 sq ft2,611 sq ft64

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 2 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside20,871 m² in all, by use
  • Roads5,811 m² · 28%
  • Green belts4,174 m² · 20%
  • Apartment buildings3,522 m² · 17%
  • Pavements3,368 m² · 16%
  • Water body1,273 m² · 6%
  • Club house1,266 m² · 6%
  • Sewage and waste treatment548 m² · 3%
  • Parks and playgrounds452 m² · 2%
  • Parking327 m² · 2%
  • Electricity sub-station130 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningAs per specification. of standard make
  • KitchenFloor: vitrified tiles, wall: ceramic tiles 2FT above counter and OBD paint on remaining area, ceiling: OBD paint
  • LiftsTower a & B: 3 passenger lift & 1 service lift tower C: 4 passenger lift & 1 service lift
  • FloorsVitrified tiles/ceramic tiles
  • WallsAcrylic emulsion paint/ oil bound distemper
  • BathroomsAll provided with standard company make
  • WindowsPowder coated/painted aluminum/UPVC windows with 4MM or above thick glazing as per specifications
  • Main doorVeneer/laminated/painted flush/FIRE door with wooden frame

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 43, GurugramSector 43, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS3.2 km
  • Sohna Elevated Corridor (NH-248A)5.2 km
  • Dwarka ExpresswayOpen, 17 Aug 20259.2 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 8 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 7

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Godrej Miraya registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/870/602/2024/97. Valid to 30 Sep 2031.

The source ↗
What is the possession timeline for Godrej Miraya?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2031. Its registration runs to 30 Sep 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Godrej Miraya?From the records · Map pin and road lines, read 6 Sep 2026

Godrej Miraya is in Sector 43, Gurugram; the site address declared to HARERA is Sector 43, Urban Estate, Gurugram Ii. In a straight line it is about 3.2 km from Delhi–Gurugram–SNB RRTS, 5.2 km from Sohna Elevated Corridor (NH-248A) and 9.2 km from Dwarka Expressway.

The source ↗
What does a home in Godrej Miraya cost, and how does that compare nearby?From the records · godrejproperties.com, read 23 Oct 2026; Bhumiq team price list, 16 Sep 2026

The developer's website, godrejproperties.com, lists homes from ₹15.13 Cr ("INR 15.13 Cr. onwards"). The Bhumiq team's price list has ₹26,000 a sq ft of carpet area (16 Sep 2026). Prices change; ask the developer for its current price list.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty

The records

What the registers hold for Godrej Miraya: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/870/602/2024/97: Registered. Valid to 30 Sep 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 30 Aug 2024, building plans 30 Aug 2024.Declared to HARERA, read 29 Oct 2026
The court record of Godrej Highview’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 61 HARERA files, with the dates we read them
Registration no.
GGM/870/602/2024/97
Registration valid till
30 Sept 2031
Declared possession
30 Sept 2031
Asking price (indicative)
₹26,000 / sq ft of carpet area

Bhumiq team price list · as of 16 Sept 2026 · a quoted rate, not a registry figure

Declared by the promoter to HARERA

Land area
5.1575 (Acre) (20,871.66 sq m)
FAR
3.2 proposed of 3.2 permissible
licence
HSVP land - e-auction, GH25 at Sector 43, Urban Estate Gurugram II on free hold basis Allotment letter vide memo no. ZO002/EO018/UE029/GALOT/0000001407 dated 20.12.2023
Estimated project cost
₹1403.16 crore
Cost of land
₹664.19 crore
Layout plan, declared approved (field 5a)
30 Aug 2024
Building plans, declared approved
30 Aug 2024
Construction to start
1 Oct 2024
Completion declared for
30 Sept 2031
Declared inventory · 11 types

Declared inventory — 11 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 2 units · 126.116 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 201.232 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 60 units · 207.973 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 60 units · 212.602 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 141.134 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 58 units · 146.467 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 242.544 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 2 units · 242.544 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 12

Statutory approvals, as declared

  • I. ZONING PLAN — declared: already been obtained (1 Aug 2024)
  • II. NOC FOR HEIGHT CLEARANCE — declared: already been obtained (9 Apr 2024)
  • III. SANCTION OF ULTIMATE LOAD ASSURANCE — declared: already been obtained (29 Mar 2024)
  • IV. BUILDING PLAN APPROVAL — declared: already been obtained (30 Aug 2024)
  • V. ASSURANCE OF STP TREATED WATER CONNECTION FOR CONSTRUCTION PURPOSE — declared: already been obtained (20 Mar 2024)
  • VI. ASSURANCE OF WATER SUPPLY — declared: already been obtained (29 Mar 2024)
  • VII. TREE CUTTING APPROVAL — declared: already been obtained (19 Jul 2024)
  • VIII. ASSURANCE OF SEWERAGE CONNECTION — declared: already been obtained (20 Mar 2024)
  • IX. ASSURANCE OF STORM WATER CONNECTION — declared: already been obtained (20 Mar 2024)
  • X. EC — declared: applied for but yet to receive (20 Mar 2024)
  • XI. FIRE SCHEME APPROVAL — declared: yet to file for approval
  • XII. SERVICE PLAN ESTIMATE — declared: yet to file for approval
On file with HARERA · 61 files

On file with HARERA (61)

Plans

Site plan

3 files
Site Plan and Services30 Aug 2024Site Plan and Areas30 Aug 2024Approved Site Plan30 Aug 2024

Layout plan

1 file
Latest Layout Plan11 Aug 2024

Zoning plan

1 file
Zoning Plan11 Aug 2024

Building plans

15 files
Tower C - Terrace Floor Plan30 Aug 2024Tower A & B - Rear Elevation30 Aug 2024Building Plan Approval30 Aug 2024

Floor plans

19 files
Basement 2 - Floor Plan30 Aug 2024Tower C - Refuge Floor Plan30 Aug 2024Tower C (Community Building) - Ground Floor Plan30 Aug 2024

Services

Sewerage and drainage

2 files
Assurance of Sewerage Connection11 Aug 2024Assurance of Storm Water11 Aug 2024

Water supply

1 file
Assurance of Treated Water for Construction Purpose11 Aug 2024

Service plans

3 files
Basement 2 - Area Chart and Service Areas30 Aug 2024Basement 1 - Area Chart and Service Areas30 Aug 2024Assurance of Ultimate Load11 Aug 2024

Approvals and clearances

Completion certificate (CC)

1 file
Tower C - Section CC30 Aug 2024

DTCP licence

2 files
Letter of Intent11 Aug 2024Licence Copy with Land Schedule11 Aug 2024

Other NOCs and clearances

3 files
Forest Clearance26 Sept 2024NOC for Height Clearance11 Aug 2024Tree Cutting Approval11 Aug 2024

Sales papers

Allotment and sale agreements

2 files
Offer of Possession11 Aug 2024Possession Letter11 Aug 2024

Money

Accounts and finance

4 files
Cash Flow Statement30 Aug 2024CA Certificate on the Application’s Figures30 Aug 2024Tower C - Section DD30 Aug 2024Non-Default Certificate from a CA16 Aug 2024

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit26 Sept 2024

Other filings

Other filings

3 files
Natural Conservation Zone26 Sept 2024Convenient Shop30 Aug 2024Club Drop Off, Canopy and Toilets Details30 Aug 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared HSVP land - e-auction, GH25 at Sector 43, Urban Estate Gurugram II on free hold basis Allotment letter vide memo no. ZO002/EO018/UE029/GALOT/0000001407 dated 20.12.2023. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 2 Sept 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate, residential flat
₹11,550 per sq ft

Sector 43, collector rates effective 1 Apr 2026, Gurugram tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Site Plan and Services30 Aug 2024Site Plan and Areas30 Aug 2024Approved Site Plan30 Aug 2024

Layout plan

1 file
Latest Layout Plan11 Aug 2024

Building plans

15 files
Tower C - Terrace Floor Plan30 Aug 2024Tower A & B - Rear Elevation30 Aug 2024Building Plan Approval30 Aug 2024Approved Building Plans, Full Set30 Aug 2024Tower A - Terrace Floor Plan30 Aug 2024Tower C - Side Elevations30 Aug 2024

Floor plans

19 files
Basement 2 - Floor Plan30 Aug 2024Tower C - Refuge Floor Plan30 Aug 2024Tower C (Community Building) - Ground Floor Plan30 Aug 2024Tower A & B (Community Building) - Ground Floor Plan30 Aug 2024Tower A & B - Ground Coverage30 Aug 2024Tower B - Refuge Floor Plan30 Aug 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (61 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3030 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Godrej Highview

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

From ₹15.13 CrBook a site visitAsk

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.