Key facts

Location
Sector 110, Gurugram0.4 km from Dwarka Expressway, in a straight linePrices and what changed
Home types
2, 3, 4 and 5 BHK
Carpet area
775–1,744 sq ft
In m²about 72–162 m², as declared
Registered
10 Jan 2018
Registered by
KNS INFRACON PRIVATE LIMITEDthe company that filed it, for KNS Infracom
Timeline
  1. 9 Dec 2016Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 10 Jan 2018Registered with HARERAHARERA, read 4 Nov 2026
  3. 30 Jun 2027Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

538homes, 775 to 1,744 sq ft of carpet area
  • Under 1,000 sq ft775–990 sq ft397
  • 1,000–1,500 sq ft1,087–1,464 sq ft90
  • 1,500–2,000 sq ft1,744 sq ft51

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenVitrified/marbal/paint/branded CP fittings
  • Kitchen appliancesCERA/parryware/hindware
  • LiftsOTIS
  • FloorsVitrified tiles/ceramic/wooden flooring/anti-skid
  • WallsCeramic tile/paint
  • BathroomsCP fitting and fixures
  • WindowsAluminum /UPVC
  • Main doorFlush door with vineer finish

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 110, GurugramSector 110, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.4 km
  • Delhi–Gurugram–SNB RRTS4.2 km
  • Sohna Elevated Corridor (NH-248A)7.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Capital Gateway registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 12 OF 2018, registered on 10 Jan 2018. Valid to 30 Jun 2027.

The source ↗
How is the connectivity around Capital Gateway?From the records · Map pin and road lines, read 6 Sep 2026

Capital Gateway is in Sector 110, Gurugram; the site address declared to HARERA is Plot No. 34, Sec-110 A & 111 New Palam Vihar Gurgram. In a straight line it is about 0.4 km from Dwarka Expressway, 4.2 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Capital Gateway?From the records · HARERA, read 4 Nov 2026

Capital Gateway is a KNS Infracom project, registered by its company KNS INFRACON PRIVATE LIMITED.

The source ↗KNS Infracom's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Capital Gateway: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 12 OF 2018: Registered. Valid to 30 Jun 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 34 OF 2011 is on the DTCP register, valid to 15 Apr 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 9 Dec 2016, building plans 9 Dec 2016.Declared to HARERA, read 29 Oct 2026
The court record of KNS Infracom’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 14 HARERA files, with the dates we read them
Registration no.
12 OF 2018
Registration date
10 Jan 2018
Registration valid till
30 Jun 2027

Declared by the promoter to HARERA

Land area
10.461 (Acre) (42,334.17 sq m)
FAR
the application prints 174.9, which is not a ratio
licence
34 of 2011 Dated 16.04.2011
Estimated project cost
₹484.69 crore
Cost of land
₹50.07 crore
Layout plan, declared approved (field 5a)
9 Dec 2016
Building plans, declared approved
9 Dec 2016
Declared inventory · 8 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type TA 2BHK · 55 units · 72 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TH 2BHK · 12 units · 72 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TD, E, F, G 3BHK · 139 units · 79 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TE, F, G 3BHK · 81 units · 88 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TB, C 3BHK+S · 110 units · 92 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TH, 3BHK+S · 39 units · 101 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TI, 4BHK+S · 51 units · 136 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TJ, 5BHK+S · 51 units · 162 sq m carpet · one flat
Statutory approvals, as declared · 20

Statutory approvals, as declared

  • I. 1. LOI (LC-III) — declared: already been obtained (13 Dec 2010)
  • II. 2. LICENCE — declared: already been obtained (16 Apr 2011)
  • III. 3. ZONING PLAN — declared: already been obtained (4 Nov 2011)
  • IV. 4. AAI NOC — declared: already been obtained (30 Jan 2012)
  • V. 5. ARAVALI CLEARANCE — declared: already been obtained (13 Mar 2012)
  • VI. 6. BUILDING PLAN APPROVAL LETTER — declared: already been obtained (7 Jun 2012)
  • VII. 7. FOREST NOC — declared: already been obtained (1 Aug 2012)
  • VIII. 8. ELECTRIC LOAD ASSURANCE — declared: already been obtained (18 Sept 2012)
  • IX. 9. DRINKING WATER APPROVAL — declared: already been obtained (19 Sept 2012)
  • X. 10. NOC FROM HUDA FOR CONSTRUCTION ACTIVITY FOR WATER — declared: already been obtained (21 Sept 2012)
  • XI. 11. MINING — declared: already been obtained (27 Nov 2012)
  • XII. 12. CGWA — declared: already been obtained (4 Dec 2012)
  • XIII. 13. MINING REVISED — declared: already been obtained (14 Jan 2013)
  • XIV. 14. EIA NOC — declared: already been obtained (17 Jun 2013)
  • XV. 15. CTC, POLLUTION — declared: already been obtained (24 Jul 2013)
  • XVI. 16. RERA REGISTRATION — declared: already been obtained (10 Jan 2018)
  • XVII. 17. SERVICE ESTIMATE APPROVAL — declared: already been obtained (25 Mar 2019)
  • XVIII. 18. ELECTRICITY LOAD — declared: applied for but yet to receive
  • XIX. 19. FIRE FIGHTING — declared: applied for but yet to receive
  • XX. 20. OCCUPATION CERTIFICATE — declared: applied for but yet to receive
On file with HARERA · 14 files

On file with HARERA (14)

Plans

Site plan

1 file
Approved Site Plan31 Jan 2020

Layout plan

1 file
Latest Layout Plan31 Jan 2020

Zoning plan

1 file
Zoning Plan31 Jan 2020

Demarcation plan

1 file
Demarcation Plan31 Jan 2020

Building plans

1 file
Approved Building Plans, Full Set31 Jan 2020

Services

Service plans

1 file
Service Plans on the Layout31 Jan 2020

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule31 Jan 2020

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration31 Jan 2020

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures31 Jan 2020Cash Flow Statement31 Jan 2020Non-Default Certificate from a CA31 Jan 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit31 Jan 2020

Other filings

Other filings

2 files
Project Continuation- RC/REP/HARERA/GGM/12 of 2018/ 7(3)/2022/03 Dated 10.12.202516 Feb 2026Project Continuation- RC/REP/HARERA/GGM/12 of 2018/ 7(3)/2022/3 dated 09.08.202229 Sept 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

34 OF 2011 · KNS Infracon · GURGAON-MANESAR

Licence valid to 15 Apr 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 3 Feb 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

34 OF 2011: 15 parcels, 10.4625 acres in all, in Choma (hadbast 62), tehsil Gurgaon.

The licence register prints the same licensed area, 10.46 acres.

  • 28//25/23 kanal
  • 29//208 kanal
  • 29//218 kanal
  • 39//1/15 kanal 16 marla
Show the other 11 parcels
  • 39//1/22 kanal 4 marla
  • 39//108 kanal
  • 39//11 min5 kanal 3 marla
  • 39//128 kanal
  • 39//19 min5 kanal 3 marla
  • 39//2/15 kanal 7 marla
  • 39//2/22 kanal 7 marla
  • 39//20 min2 kanal 2 marla
  • 39//97 kanal 9 marla
  • 40//58 kanal
  • 40//65 kanal 3 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Choma (hadbast 62), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 28//25/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹7,700 per sq ft

Sector 110, collector rates effective 1 Apr 2026, Gurugram tehsil. 2 tehsil lists price this sector; this is the higher. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan31 Jan 2020

Layout plan

1 file
Latest Layout Plan31 Jan 2020

Building plans

1 file
Approved Building Plans, Full Set31 Jan 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (14 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1214 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on KNS Infracom

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.